Notice ID: da8772940f1e4087bb4f41924d6732b5Solicitation
Design Bid Build for Army Reserve Center in Birmingham, Alabama
Archived on October 14, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- October 15, 2025
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST LOUISVILLE
- Place of performance
- Birmingham, AL
- PSC
- Y1JZ: CONSTRUCTION OF MISCELLANEOUS BUILDINGS
- Last updated
- Oct 14, 2026
Identifiers
- Solicitation number
- W912QR25R0020
- Notice ID
- da8772940f1e4087bb4f41924d6732b5
Description
************************************************** Amendment 0003 posted on 14 October 2025 ___ view amendment documents to review the updates. Due date has been extended to 16 October 2025 @ 2PM ET ********************************************************************************************************************************************** PROPOSAL DUE DATE EXTENDED =16 October 2025 @ 2 PM ET ______ Forthcoming amendment to follow *********************************************************************************************************************************************************************************************************Amendment 0002 posted on 30 September 2025 _ _ view amendment documents to review the updates. The due date and time remains the same (07 October 2025 at 2 PM ET) ********************************************************************************************************************************Amendment 0001 posted on 18 September 2025 _ view amendment documents to review the updates. The due date and time remains the same (07 October 2025 at 2 PM ET) ***********************************************************************************The intent of this solicitation is to select one (1) contractor for construction of an ARC, AMSA/VMS and an Unheated Storage Building in Birmingham Alabama. This project is for construction of a 600-member ARC in Birmingham, Alabama. Primary facilities include land acquisition and construction of an ARC (53,000 SF), collocated VMS (19,300 sf) and an Unheated Storage Building (3,400 SF). Supporting facilities include site development, utilities and connections, Military Equipment Park (MEP), non-organizational parking, vehicle wash rack/platforms, bi-level equipment loading ramp, circulation pavements, storm drainage, paving, walks, curbs and gutters, fencing, gates, lighting, information systems, landscaping, and signage. Accessibility for the disabled will be provided. Anti-terrorism Force Protection (ATFP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability and Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoDs Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. The basis of award is the Best Value Trade-Off process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a Firm-Fixed-Price (FFP) contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. All documents are available for download from the Procurement Integrated Enterprise Environment (PIEE) website. Go to the Attachments/Links section of the SAM notice and access the hyperlink titled PIEE Solicitation Module Link for W912QR25R0020. Once at the site, scroll down to the Attachments section of the PIEE Solicitation Module to locate the documents.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 6 of 6 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | - | |||
| Combined Synopsis/Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | - | |||
XREF.zip | Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | 25.75 MB | ||
Civil 1.zip | Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | 46.46 MB | ||
Civil 2.zip | Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | 48.99 MB | ||
Landscape.zip | Solicitation | DEPT OF THE ARMY | Oct 15, 2025 | 4.22 MB |
Lifecycle
Solicitation:
W912QR25R0020- Pre-Solicitation
- Solicitation
- Combined Synopsis
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeNov 8, 2024
Project Labor Agreement (PLA) Market Survey � Army Reserve Center in Birmingham, Alabama
- 4×Pre-SolicitationNov 8, 2024
Pre-Solicitation for Design/Bid/Build for Army Reserve Center in Birmingham, Alabama
- 5×Combined SynopsisMar 6, 2025
Pre-Solicitation/Industry Day for DBB _ Army Reserve Center in Birmingham, AL
- 2×Special NoticeJun 3, 2025
Project Labor Agreement (PLA) Market Survey � Army Reserve Center in Birmingham, Alabama
- 2×Combined SynopsisJun 23, 2025
Pre-Solicitation/Industry Day for DBB _ Army Reserve Center in Birmingham, AL
- 9×SolicitationCurrentAug 27, 2025
Design Bid Build for Army Reserve Center in Birmingham, Alabama
Similar Opportunities
Additional Details
Solicitation Number
W912QR25R0020
Archive Date
Oct 14, 2026
Office Address
LOUISVILLE, KY, 40202-2230