GovChime
Notice ID: bc5062556db1402e896156c6f416cb8dSpecial Notice

Technology Licensing Opportunity: Electrochemical Recycling Technology for Sustainable Recovery of Tellerium and Cadmium from CdTE Photovoltaics

Active, responses due . Special Notice posted by ENERGY, DEPARTMENT OF on August 24, 2026. Solicitation BA-1601.

NAICS 562920 (Materials Recovery Facilities). Place of performance: Idaho Falls, Idaho. Full description on SAM.gov.

Description

Electrochemical Recycling Technology for Sustainable Recovery of Tellurium and Cadmium from CdTe Photovoltaics
In-situ oxidant generation reduces chemical use and environmental impact in solar module recycling

Technology Summary
This technology enables electrochemical extraction and recovery of tellurium (Te) and cadmium (Cd) from end-of-life and manufacturing scrap cadmium telluride (CdTe) photovoltaic cells. Unlike current recycling methods that rely on externally supplied hydrogen peroxide (H₂O₂) in acid leaching, this process generates oxidants in situ from oxygen or air using electrochemical methods. The approach decreases reliance on bulk chemicals and significantly lowers the carbon footprint of recycling operations, while still producing Te metal and Cd suitable for reuse in photovoltaic manufacturing.

Problem Addressed

  • High environmental footprint of current CdTe PV recycling due to reliance on H₂O₂ production and use.

  • Supply chain and logistics burden from transporting and storing bulk chemicals.

  • Growing need for sustainable recycling as CdTe photovoltaics expand in deployment.

Solution

  • Electrochemical in-situ generation of oxidants eliminates external H₂O₂ sourcing.

  • Direct recovery of Te metal and Cd for reintegration into module production.

  • Electricity-driven process supports integration with renewable or nuclear power, lowering lifecycle emissions.

Key Advantages

  • Reduced environmental impact: Avoids carbon-intensive bulk chemical manufacturing.

  • Lower logistical burden: Minimizes transportation and storage of hazardous oxidants.

  • Clean energy compatible: Process can run on renewable or low-carbon electricity.

  • Next-generation mining model: Enables sustainable materials recovery aligned with circular economy goals.

Market Applications

  • CdTe photovoltaic recycling: Direct application to commercial operations, such as First Solar’s module recovery.

  • Sustainable metals recovery: Broader potential for hydrometallurgical extraction of critical elements.

  • Circular economy strategies: Supports renewable energy companies seeking closed-loop manufacturing.

Full description on SAM.gov

Overview

Agency:
Department of Energy
Office:BATTELLE ENERGY ALLIANCE–DOE CNTR
Posted:August 24, 2026
NAICS:562920: Materials Recovery Facilities
Last Updated:Sep 6, 2026
PSC:F999: OTHER ENVIRONMENTAL SERVICES
Response Deadline:
Set-Aside:Not specified
Type:Special Notice
Place of Performance:Idaho Falls, Idaho, 83401

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:BA-1601
  1. 3×
    Special NoticeCurrentSep 8, 2025

    Technology Licensing Opportunity: Electrochemical Recycling Technology for Sustainable Recovery of Tellerium and Cadmium from CdTE Photovoltaics

    Notice bc5062556db1402e896156c6f416cb8d on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Overview This technology introduces a dimethyl ether (DME)-driven method for rejuvenating end-of-life lithium-ion battery (LIB) cells, with the goal of restoring electrochemical performance without dismantling the cell into constituent materials. Conventional LIB recycling requires mechanical disassembly, crushing, and downstream hydrometallurgical or pyrometallurgical separation of anode, cathode, and electrolyte fractions, followed by reconstruction of new components. The DME-driven approach is intended to recondition spent cells so that the existing electrode architecture remains intact and reusable. By acting directly on the assembled cell, the method is designed to recover electrochemical functionality through a substantially simplified process flow. Preliminary electrochemical data generated during development supports the technical feasibility of the approach. If validated at larger scale, the technology may offer a recycling pathway that materially reduces process complexity, capital intensity, and reagent consumption compared with established LIB recycling routes. Industry Need Current LIB recycling infrastructure relies on multi-step processes that consume significant energy and reagents. End-of-life cells are typically shredded, with recovered black mass treated through hydrometallurgical leaching, solvent extraction, or high-temperature pyrometallurgical processing to isolate metals such as lithium, cobalt, nickel, and manganese. These recovered materials must then be reprocessed into battery-grade precursors and reassembled into new cells. The associated unit operations introduce capital cost, operating cost, and environmental burden, and there is presently no commercialized method to recondition or rejuvenate LIB cells or their principal components for direct reuse. As domestic demand for LIB recycling capacity grows, the absence of a lower-intensity reuse pathway constrains the economic and environmental performance of the broader battery circularity sector. Differentiation & Advantages Operates directly on assembled cells, eliminating the need for shredding, separation, and component reconstruction steps required by conventional recycling. Designed to restore electrochemical properties of the existing electrode set, enabling direct electrode reuse rather than raw material recovery. Intended to reduce reagent and energy inputs relative to hydrometallurgical and pyrometallurgical processing. May lower capital and operational requirements for recycling facilities by consolidating multiple unit operations into a single rejuvenation step. Addresses a recycling pathway for which no commercialized equivalent currently exists. Potential Applications Direct rejuvenation of end-of-life LIB cells recovered from consumer electronics, stationary storage, or transportation applications. Integration into existing LIB recycling and reuse facilities as a front-end reconditioning step prior to, or in place of, material recovery. Supporting domestic battery circularity initiatives that prioritize reuse over raw material extraction. Secondary-use battery pathways where partial capacity restoration may extend service life. Reducing the volume of cells entering energy-intensive downstream recycling streams.
Special Notice562920No Set-Aside08/24/202611/01/2026Idaho Falls, ID
This is a presolicitation notice in accordance with FAR 5.101 for the Hanford 222-S Laboratory procurement.
Pre-Solicitation562910No Set-Aside09/30/2026Open-
Department of Energy (DOE) Environmental Management (EM) West Valley Demonstration Project (WVDP) Phase 1B Procurement
Special Notice562910No Set-Aside11/28/2023Open-
AMEND 0003 POSTED TO ANSWER AND CLARIFY VENDOR QUESTIONS AND REQUESTS. AMEND 0002 POSTED TO ANSWER AND CLARIFY VENDOR QUESTIONS AND REQUESTS. AMEND 0001 POSTED TO ANSWER AND CLARIFY VENDOR QUESTIONS AND REQUESTS. Vendor to supply all materials and labor for the cleaning and maintenance of the VA Medical Center Boise and the adjoining Mountain Cove Campus gutters, downspouts, and roof drains. Service will be carried out in two phases in November and June each Period of service. All services will be provided in accordance with the Statement of Work. Vendor will bill monthly in arrears for services performed. See attached Solicitation for SOW for requirement details.
Combined Synopsis562998Veteran-Owned Small Business Sole Source (VA only)10/08/202610/15/2026-
AMEND 0002 POSTED TO ANSWER AND CLARIFY VENDOR QUESTIONS AND REQUESTS. AMEND 0001 POSTED TO ANSWER AND CLARIFY VENDOR QUESTIONS AND REQUESTS. Vendor to supply all materials and labor for the cleaning and maintenance of the VA Medical Center Boise and the adjoining Mountain Cove Campus gutters, downspouts, and roof drains. Service will be carried out in two phases in November and June each Period of service. All services will be provided in accordance with the Statement of Work. Vendor will bill monthly in arrears for services performed. See attached Solicitation for SOW for requirement details.
Combined Synopsis562998Veteran-Owned Small Business Sole Source (VA only)10/06/202610/15/2026-

Additional Details

Solicitation Number

BA-1601

Archive Date

Nov 23, 2026

Office Address

Idaho Falls, ID, 83415