GovChime
Notice ID: bc06403d6b8e4526ad14e7c41590c5f8Solicitation

Groundwater Monitoring in Wabasha County, MN

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
11:00 AM CST
Posted
November 16, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
541380: Testing Laboratories and Services
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST PAUL.W07V ENDIST ST PAUL
Place of performance
Grand Encampment Placement Site - East of Kellogg, MN along Zumbro River -- 44.310928, -91.956431, Greenfield Township, Minnesota, 55945
Last updated
Nov 16, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912ES27QA013
Notice ID
bc06403d6b8e4526ad14e7c41590c5f8

Description

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. --- AMENDMENT 0001 has been added - Amendment 0001 allows Absence/Presence Reporting in place of quantitative MPN Results for both E. coli and total coliform for organic samples.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    Groundwater Monitoring in Wabasha County, MN

    Notice e5a18700e27a44c2aba3265979f7becf on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    Groundwater Monitoring in Wabasha County, MN

    Notice 0d0a1ed3b2c2491580e2bdad7424c517 on SAM.gov

  3. 5
    Version 5SolicitationCurrent

    Groundwater Monitoring in Wabasha County, MN

    Notice bc06403d6b8e4526ad14e7c41590c5f8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912ES27QA013

Archive Date

Dec 4, 2026

Office Address

SAINT PAUL, MN, 55101-1323