Notice ID: 9a673cc234ac477eb6db941f55343d38Sources Sought
Buckley-FA2543-GasValveReplacement
Archived on April 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM UTC−06:00
- Posted
- March 24, 2026
- Notice type
- Sources Sought
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 332911: Industrial Valve Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA2543 460 CONS
- Place of performance
- Aurora, 80015
- Last updated
- Nov 1, 2026
Identifiers
- Solicitation number
- Buckley-FA2543-GasValveReplacement
- Notice ID
- 9a673cc234ac477eb6db941f55343d38
Description
*** The purpose of the sources sought is to help determine technical capability and a price estimate, FOR MARKET RESEARCH ONLY *** Reference pictures not in the below text are included in the attachment to this sources sought. 1.0 Scope of Work 1.1 Primary Objective The contractor shall provide fully qualified technicians to replace seven (7) gas control valves suspected of damage from a faulty gas regulator. 1.2 Inspections and Re-commissioning Following valve replacement, the contractor shall: - Conduct comprehensive leak checks on all affected equipment. - Perform a full safety inspection of all gas-fired equipment, including internal components such as burners, heat exchangers, and all electrical/mechanical parts. - Perform multiple leak checks on each piece of equipment, both while the units are static and again while under full operational load. - Re-commission all boilers and water heaters after a full operational test to certify their continued safe operation. 1.3 Deficiency Reporting Upon completion of the re-commissioning, the contractor will deliver a deficiency report detailing any compromised components or units requiring further attention. If additional work or a full system replacement is recommended, the contractor must provide a separate, detailed report with clear justification for the recommendation. 1.4 Contractor-Furnished Items The contractor is responsible for providing all necessary materials and equipment, including but not limited to: - Gas control valves, assemblies, fittings, gaskets, and valve replacement kits. - All specialized tools required to re-commission units, perform gas pressure tests, conduct combustion analysis, and complete operational tests of all gas-fired equipment. 1.5 Governing Standards All work shall be performed in strict accordance with the manufacturer's specifications and the latest editions of the following codes and standards: - UFC 3-410-01: Heating, Ventilating, and Air Conditioning Systems - UFC 3-420-01: Plumbing Systems - ASME Boiler and Pressure Vessel Codes - All applicable state and local laws/codes UFC criteria can be accessed via the Whole Building Design Guide at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc. 2.0 Project Logistics & Scheduling - Period of Performance: To be determined. - Building Downtime: No specific building-wide downtime is required. Individual units can be isolated for work as needed, ensuring continuous operations. 3.0 Technical & Compliance Requirements 3.1 Definition of Qualified Labor The contractor must ensure all technicians are certified and licensed to service and repair commercial boilers in accordance with the standards listed in Section 1.5. Furthermore, all technicians must possess specialized certification and experience with the following specific equipment models: - Rinnai Tankless Water Heaters: Model # REU-KBD3237FFUDC-US - Lochinvar Knight Boilers: Model # KBN601 - Lochinvar Knight Boilers: Model # KBN286 - RHEEM RUUD Universal Water Heaters: Model # G100-200 3.2 System Pressure Testing Protocol The contractor shall verify the maximum and minimum inlet gas pressures for each unit via its data plate before commencing work. Inlet pressure tests must be performed before and after new valve installation. Under no circumstances shall any valve be exposed to pressures exceeding the manufacturer's maximum inlet pressure specification.After installation, the contractorwill verify the working gas pressure with all systems running to ensure valves are functioningwithin manufacturer specifications. 3.3 Reporting & Deliverables Upon project completion, the contractor shall submit a final report containing the following detailed information: - Pre- and post-installation gas pressure readings. - Results of all leak checks (for both static and operational states). - A summary of all operational and safety checks performed. - A complete combustion analysis report. - A log of all replaced parts. - A detailed summary of any unit deficiencies discovered during re-commissioning. 3.4 Return of Materials The contractor shall tag all removed parts with the corresponding unit they were removed from and return them directly to the 460 CES project manager.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
Buckley-FA2543-GasValveReplacement- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 2×Market ResearchCurrentMar 24, 2026
Buckley-FA2543-GasValveReplacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop. | 36% | Solicitation | 12/10/2026 |
Additional Details
Solicitation Number
Buckley-FA2543-GasValveReplacement
Archive Date
Apr 15, 2026
Office Address
BUCKLEY AFB, CO, 80011-9572