GovChime
Notice ID: c0e48bedf3834f55ba57832aaeb508dfPresolicitationArchived

Beale Rubberized Fitness Track

Archived on September 4, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:30 PM PDT
Posted
August 5, 2026
Notice type
Presolicitation
Set-aside
Small Business Set Aside - Total
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA4686 9 CONS PK
Place of performance
Beale AFB, 95903
PSC
Z2PA: REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA468626TRACKPRESOL
Notice ID
c0e48bedf3834f55ba57832aaeb508df

Description

THIS NOTICE IS NOT A REQUEST FOR SOLICITATION AND IS CURRENTLY UNFUNDED. 1. This notice is prepared IAW RFO FAR 5.101 and 12.201-1. 2. Description of the Requirement: The Government has a requirement to replace the Beale AFB oval running track surface to a safe, compliant, and fully operational condition. This project will ensure the facility meets all necessary standards to support the physical readiness, training, and official fitness assessments (PFRA) of assigned personnel. The scope of work requires the contractor to provide all personnel, equipment, materials, management, and supervision necessary to perform a complete rubberized surface removal and resurfacing. Key tasks include, but are not limited to: Demolition & Disposal: Full removal and off-base disposal of the existing track surface down to the asphalt/concrete substrate. Track Installation: Installation of a new, 13mm (1/2”) full-pour polyurethane synthetic track surface (TUFLITE or equal) in the color RED. Transition Strip: Installation of a flush, paved transition strip (minimum 18 inches wide) between the outside edge of the track and the surrounding area. Striping & Markings: Precise athletic striping compliant with NCAA and Air Force PFRA regulations, including markings for the 2-mile run, 2km walk, and four (4) 20m HAMR test lanes. Signage & Warranty: Installation of start/stop signage for fitness testing and provision of a minimum 5-year warranty on the synthetic surface. 3. Procedures for Award: The Government intends to issue a Request for Quotation (RFQ) and award a firm-fixed-price purchase order. The award basis is anticipated to include Technical and Price. The Government anticipates to award on or about 1 September 2026, subject to the availability of funds. 4. Statement Regarding Responsible Sources: All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Responsible sources must submit a capability statement demonstrating their ability to perform the services requested.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (2)

  • PWS_Beale Fitness Track.pdf

    136 KBAdded in Presolicitation version 4Posted
    Download
  • Unified Facilities Criteria UFC Fitness Centers from AF Services Agency IC 30 May 2019.pdf

    1.1 MBAdded in Presolicitation version 4Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchivedCurrent

    Beale Rubberized Fitness Track

    Notice c0e48bedf3834f55ba57832aaeb508df on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Beale Rubberized Fitness Track

    Notice df594594bbb1458ca0943f86c8a6ba3b on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA468626TRACKPRESOL

Archive Date

Sep 4, 2026

Office Address

BEALE AFB, CA, 95903-1702