GovChime
Notice ID: c8c4909dc5cc4c27be47d75bf938332bSources Sought

Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA

Archived on August 15, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
June 5, 2025
Notice type
Sources Sought
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NORFOLK
Place of performance
Norfolk, 23510
PSC
Y1KA: CONSTRUCTION OF DAMS
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123625S13MA
Notice ID
c8c4909dc5cc4c27be47d75bf938332b

Description

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for addiitional information.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W9123625S13MA
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentJun 5, 2025

    Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA

    Notice c8c4909dc5cc4c27be47d75bf938332b on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W9123625S13MA

Archive Date

Aug 15, 2026

Office Address

NORFOLK, VA, 23510-1096