Notice ID: c8c4909dc5cc4c27be47d75bf938332bSources Sought
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
Archived on August 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- June 5, 2025
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NORFOLK
- Place of performance
- Norfolk, 23510
- PSC
- Y1KA: CONSTRUCTION OF DAMS
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9123625S13MA
- Notice ID
- c8c4909dc5cc4c27be47d75bf938332b
Description
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for addiitional information.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9123625S13MA- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentJun 5, 2025
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
Similar Opportunities
- Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB
Department of War · Posted 10/30/2026
- Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia
Department of War · Posted 10/21/2026
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project
Department of War · Posted 10/06/2026
- Philpott Anchors and Instrumentation Construction
Department of War · Posted 10/05/2026
- Maintenance Dredging of the Winter Harbor Federal Navigation Channel
Department of War · Posted 10/02/2026
Additional Details
Solicitation Number
W9123625S13MA
Archive Date
Aug 15, 2026
Office Address
NORFOLK, VA, 23510-1096