GovChime
Notice ID: ca8ffda8048d4f33a0fa991fa6a21becCombined Synopsis/Solicitation

Grove Crane

Responses closed . Full description on SAM.gov.

Overview

Response deadline
10:00 AM EDT
Posted
August 17, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
333120: Construction Machinery Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
Place of performance
Hunter Army Airfield, GA, 31409
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911S226U3691
Notice ID
ca8ffda8048d4f33a0fa991fa6a21bec

Description

Grove Crane. Amendment to update response date.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    Grove Crane

    Notice 49d62da007a34c50bff48eb80806731e on SAM.gov

  2. 2
    Version 2Combined Synopsis/Solicitation

    Grove Crane

    Notice 29db6f802bea47b99df4007552cfda9b on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationCurrent

    Grove Crane

    Notice ca8ffda8048d4f33a0fa991fa6a21bec on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Wheeled Crane: Engine: must have a 3.8L CUMMINS engine Cooling: must have a conventional coolant cooling system Cylinders: must be at least a 4-cylinder engine Performance (hp): must have at least 130 Hp @2500rpm Torque: must have at least 360 Ft.Lb. @1600rpm DEF: must not require DEF Fuel: must use Diesel fuel Transmission: must have Powershift 4-speed forward, 3-speed reverse Drive system: must be 4-wheel drive Axles: must be ridged mounted to frame and have planetary hubs and limited slip differentials. Tire size and kind: must have 385/65R 22.5 High Traction radial tires Service brake: must have 4-wheel full hydraulic internal multi-wet disc brakes for front and rear axles Parking brake: must have a mechanically applied disc type parking brake on front axle Steering system: must have 4-wheel steering with selectable 4-wheel circle, 4-wheelcrab and 2-wheel front steering Hydraulic system: must have a single load sensing axial piston pump and a hydraulic reservoir with a visible fluid level sight glass Lights: Must have a full LED lighting package for front and rear of Crane Fuel: must be diesel Counterweight: Must be a 1-piece cast type bolted to turn-table Operator?s Station: must be chassis mounted cab shell with roof safety glass, deluxe seat, A/C and Heat, dash mounted mechanical lever proportional controls, electric horn, engine gauge package, fire extinguisher, sight level bubble, 360-degree continuous rotation with worm and gear drive on ball bearing swing circle. Must have back-up camera. Must have 360 degree swing lock. Must have back-up alarm. Outriggers: must have front and rear oblique type beams at all 4-corners with nylon wear pads and hydraulic holding valves with independent control valves
86%
Combined Synopsis06/25/2026
Gantry Crane
77%
Combined Synopsis05/12/2026
Chain and Hoist10A2016 GANTRY A SERIES STEEL ADJUSTABLEHEIGHT include Wheel Brakes and FestooningNER2G080SHarrington 8 Ton NER2 Hoist with Geared Trolley 10 foot HOL and 16 foot Pendant
77%
Combined Synopsis04/22/2026
Qty: 2 Spider crane that has lifting capacity of 6400lbs wireless remote control system, quick install jib system with cover for out side storageAmendment change for quantity and to add additional characteristics
74%
Combined Synopsis09/01/2026
Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements.
71%
Combined Synopsis01/05/2026

Additional Details

Solicitation Number

W911S226U3691

Archive Date

Aug 17, 2027

Office Address

FORT DRUM, NY, 13602-5220