GovChime
Notice ID: cbb9f4beaf6944f3ba7f58b2ad97c7c2Combined Synopsis/Solicitation

55 TON PACKAGE UNIT

Responses closed . Full description on SAM.gov.

Overview

Response deadline
7:05 AM CDT
Posted
March 5, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
Place of performance
McAlester Army Ammunition Plant1 C-Tree RdMcAlester, OK 74501, 74501
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911S226U2683
Notice ID
cbb9f4beaf6944f3ba7f58b2ad97c7c2

Description

55 TON PACKAGE UNIT Reason for amendment is to add Factory start up needed to salient characteristics.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    55 TON PACKAGE UNIT

    Notice b5a49127dcbb4269879f4d0b091c5d70 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCurrent

    55 TON PACKAGE UNIT

    Notice cbb9f4beaf6944f3ba7f58b2ad97c7c2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
100%
Combined Synopsis09/04/2026
100 Ton Chiller Package
100%
Combined Synopsis09/02/2026
40 Ton Horizon Outdoor Air Unit
100%
Combined Synopsis07/01/2026
Provide 3-TON Server Room A/C Unit consisting of one 3-TON Evaporator Power 208/230-1-60, Electric Reheat, canister dehumidifier, scroll compressor with hot gas bypass capacity control, high head pressure switch for unit protection, epoxy coated coil with UV topcoat for extended coil life, unit deigned for R-407C factory charged, and one Air Cooled Condensing Unit Power 208/230-1-60, Electric Reheat, canister dehumidifier, scroll compressor with hot gas bypass capacity control, high head pressure switch for unit protection, epoxy coated coil with UV topcoat for extended coil life, unit deigned for R-407C factory charged. Provide start-up service, and delivery to final site at Fort Buchanan Puerto Rico, 00934, including unloading at site.
100%
Combined Synopsis06/05/2026
Amended to change NAICS code. This requirement is for a complete, like-for-like replacement of an existing commercial rooftop unit, or RTU. The required equipment package must meet or exceed the following specifications. The base unit must be one 12.5-Ton Gas Heat and Electric Cooling Rooftop Unit with a 208-volt, 3-phase power supply. The unit must have single circuit, two-stage cooling with a minimum 10.8 EER or 15.0 IEER, and two-stage medium gas heat with a first stage of 180 MBH input and a second stage of 224 MBH input. It must also feature a high-static direct-drive vane axial fan, such as a Carrier EcoBlue or equivalent, and use a modern, low GWP refrigerant like R-454b. The package must also include the following compatible accessories: one Vertical Economizer with a controller, one Enthalpy sensor and harness for the economizer, and one standalone, two-stage programmable thermostat.
100%
Combined Synopsis05/28/2026

Additional Details

Solicitation Number

W911S226U2683

Archive Date

Mar 5, 2027

Office Address

FORT DRUM, NY, 13602-5220