Notice ID: cc22592fed7c40d4b49c833d482181edSources Sought
SP-POL-CMP-REPAIR-FY25-CTG GRISSOM ARB, IN
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM CDT
- Posted
- September 22, 2026
- Notice type
- Sources Sought
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
- Place of performance
- Grissom, IN, 46971
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- PANNWD26P032362
- Notice ID
- cc22592fed7c40d4b49c833d482181ed
Description
Sources sought notice including a draft Scope of Work to demolish existing 5K gal diesel storage tank (facility 41903) and replace with a new 5K gal tank (facility 41911). Remove and re-install existing ATG probe and float.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for PANNWD26P032362piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Sources SoughtCurrent
SP-POL-CMP-REPAIR-FY25-CTG GRISSOM ARB, IN
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area. | - | Solicitation | 12/04/2026 |
***This solicitation is a Small Business set-a-sided, restricted to 100% small business only.***The project includes repairs and upgrades to an existing fuel storage and dispensing facility. Work includes repairing concrete and pavement; removing water from an underground communications access box; installing an emergency fuel shutoff station and leak detection equipment; and repairing and recoating fuel system canopies, piping, and related components. Additional work includes replacing tank vents, repairing and improving grounding systems, modifying platforms to provide safe access to tank equipment, and upgrading the automatic tank gauging (ATG) system and associated controls.*****Proposal Due Date has been extended from 11/23/2026 to 12/21/2026 at 14:00 CST***** | - | Solicitation | 11/23/2026 |
This project involves modifying a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside. | - | Pre-Solicitation | 10/14/2026 |
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2. | - | Pre-Solicitation | 10/06/2026 |
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection. | - | Solicitation | 10/20/2026 |
Additional Details
Solicitation Number
PANNWD26P032362
Archive Date
Nov 27, 2026
Office Address
OMAHA, NE, 68102-4901