GovChime
Notice ID: cef69963a38f4060b5422e900ee63da3Sources Sought

522302,POL,EMG,Repair Robins AFB - Repair POL Operations and Fuel Facilities Building 194

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
May 21, 2026
Notice type
Sources Sought
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
Place of performance
Robins AFB, Georgia, 31098
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
PANNWD26P029893
Notice ID
cef69963a38f4060b5422e900ee63da3

Description

See attached Sources Sought and Draft Scope of Work for Repair Robins AFB - Repair POL Operations and Fuel Facilities Building 194. Provide completed form by requested response date.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    522302,POL,EMG,Repair Robins AFB - Repair POL Operations and Fuel Facilities Building 194

    Notice cef69963a38f4060b5422e900ee63da3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This solicitation will close in 33 days. The solicitation is restricted to Small Businesses. Project Description: This project is for the construction of two (2) Munitions Storage Igloos at Ellsworth, AFB, South Dakota. The site contains two (2) existing earth-covered munition storage igloos that will need to be demolished that are 5145 square feet total. See PWS, Specifications and Drawings for more information. Estimated Construction Costs: The estimated construction cost of this project is between $6,000,000 and $8,000,000.
72%
Solicitation12/08/2026
Amendment 5: The purpose of this amendment is as follows: 1. Correction to description of CLIN 0016 (see 00 10 00). 2. Revised drawings/specifications (see Summary of Changes, dated 05/11/26). All other terms and conditions remain the same.
71%
Solicitation05/15/2026
Project Labor Agreement Survey - Construction of Base Operations and Mobility Center at Offutt AFB, NE.
70%
Special Notice04/10/2026
Update 0005 is to issue Amendment 0004. // Update 0004 is to issue Amendment 0003. // Update 0003 is to issue Amendment 0002. // Update 0002 is to issue Amendment 0001 // Update 0001 is to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module.
68%
Solicitation07/08/2026
**This notice ID: W9126G26RA019 is being issued to correct a clerical error and is replacing notice ID: W912626RA019.** // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. See attached Pre-Solicitation Notice for details.
68%
Pre-SolicitationOpen

Additional Details

Solicitation Number

PANNWD26P029893

Archive Date

May 21, 2027

Office Address

OMAHA, NE, 68102-4901