REPAIR AC PAVING
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM PDT
- Posted
- October 5, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO CA.USPFO CA PROCUREMENT.W7MX USPFO ACTIVITY CAANG 163
- Place of performance
- 0, California, 92518
- PSC
- Z2LZ: REPAIR OR ALTERATION OF PARKING FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S74-26-Q-A020
- Notice ID
- cf056f605b6a421a926d673e2d7fcbf2
Description
Amendment 0004: The purpose of this amendment is to extend the quote due date from "5 October 2026" to "16 October 2026" and add a revised Statement of work, Drawings, AOI Requirements, Storm Water & Erosion Certificate, AF 103, Work Permit, and Storm Water Inlet Protection attachments.
Amendment 0003: The purpose of this amendment is to extend the quote due date from "24 September 2026" to "5 October 2026" and to add the Liquidated Damages Clause and amounts.
Amendment 0002: The purpose of this amendment is to incorporate a revised Statement of work, Drawings and questions and answers/RFIs
Amendment 0001: Add final day to ask questions or submit RFIs.
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR parts 12 and 36, as modified by the Revolutionary FAR Overhaul (RFO) Class Deviations. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available
Solicitation number W50S74-26-Q-A020 is issued as a request for quotation (RFQ) for project titled Repair AC Paving.
The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
CLIN 0001 Repair AC Paving, Area 1 Consisting of Demo, Overlay and Striping for 2276,2273,2278 and 2283 in accordance with SOW and Drawings
CLIN 0002 Option 1, Repair AC Paving, Area 1 Consisting of Prep, Slurry and Striping for 2276,2273 and 2283 in accordance with SOW and Drawings
CLIN 0003 Option 2, Repair AC Paving, Area 2 Consisting of Prep, Slurry and Striping for Areas 2267, 2272, 2271 in accordance with SOW and Drawings
CLIN 0004 Option 3, Repair AC Paving, Area 2 consisting of Prep, Slurry, and Striping for 2270 and 2274 in accordance with SOW and Drawings
CLIN 0005 Option 4, Repair AC Paving, Area 3 consisting of Prep, Slurry, and Striping for 2315 and 2339 in accordance with SOW and Drawings
CLIN 0006 Option 5, Repair AC Paving, Area 1 consisting of Prep, Slurry, and Striping for 2274 in accordance with SOW and Drawings
CLIN 0007 Option 6, Repair AC Paving, Area 4 consisting of Prep, Slurry, and Striping for 2275 in accordance with SOW and Drawings
CLIN 0008 Option 7, Repair AC Paving, Area 1 consisting of Prep, Slurry, and Striping for ROAD in accordance with SOW and Drawings
CLIN 0009 Option 8, Repair AC Paving, Area 1 consisting of 2283, Demo Paving, Demo Tree, Grading, Add & Compact Base, Paving, PCC Flush Curb, and Striping in accordance with SOW and Drawings
Period of Performance is 120 days after notice to proceed.
See list of solicitation provisions that apply to the acquisition in attached SF 1442
See list of contract clauses that apply to the acquisition in attached SF 1442
Questions are due by 1300, 18 September 2026 PST
Quotes are due by 1300, 5 October 2026 PST
A site visit is scheduled for September 15 at 1000 PST. Site visit is not required, but encouraged. In order to attend the site visit you MUST submit your pass request (see attachments) no later than 9 September at 1100 PST.
Set-Aside: Small Business
This solicitation incorporates provisions and clauses by reference.
Product / Service Code: Z2LZ
NAICS 238990
Business Size Standard $19,000,000.00
Project Magnitude: Between $500,000 and $1,000,000
Equitable Adjustments will be made in accordance with DFAR 252.243-7002, please note, any equitable adjustments submitted are not considered acceptable unless agreed to in writing by the contracting officer and included in a modification. Upon submission of a request for equitable adjustment, the Government attempts to finalize within 30 to 60 days upon receipt of an adequate definitization change order proposal.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (18)
- Download
Solicitation Amendment W50S7426QA0200004 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Attachment 1 2nd Revised Statement of Work.pdf
65 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Solicitation Amendment W50S7426QA0200003 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Solicitation Amendment W50S7426QA0200002 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Attachment 3 Revised Drawings.pdf
2.2 MBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Attachment 8 AOI Requirements.pdf
170 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
SIGN IN ROSTER.pdf
4.3 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Solicitation Amendment W50S7426QA0200001 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 9 Storm Water and Erosion Certificate.pdf
933 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Solicitation - W50S7426QA020.pdf
6.1 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 10 AF103 Work Permit.pdf
1.4 MBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Attachment 2 AF Form 66.pdf
63 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 11 Storm Water Inlet Protection.pdf
1.0 MBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Attachment 7 RFI Questions and Responses.pdf
657 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Attachment 4 General Info For March ARB.pdf
397 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 5 Wage Determination CA20260025.pdf
115 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 6 Base Pass Request.pdf
278 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
MARB Contractor Base Pass Request.xlsx
17 KBAdded in Presolicitation version 4Posted
Lifecycle
- 8
- 2Version 2Combined Synopsis/Solicitation
Type changed from Presolicitation to Combined Synopsis/Solicitation
REPAIR AC PAVING
- 3Version 3Combined Synopsis/Solicitation
REPAIR AC PAVING
- 4Version 4Combined Synopsis/Solicitation
REPAIR AC PAVING
- 5Version 5Combined Synopsis/Solicitation
REPAIR AC PAVING
- 6Version 6Combined Synopsis/Solicitation
REPAIR AC PAVING
- 7Version 7Combined Synopsis/Solicitation
REPAIR AC PAVING
- 10Version 10Combined Synopsis/SolicitationCurrent
REPAIR AC PAVING
Similar Opportunities
Additional Details
Solicitation Number
W50S74-26-Q-A020
Archive Date
Dec 15, 2026
Office Address
MARCH ARB, CA, 92518-1715