GovChime
Notice ID: d0a543ea9d2148ae973a45ac83962d74Solicitation

November TA-A Maneuver

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:00 AM UTC+00:00
Posted
May 5, 2026
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-OO.411TH CSB.0906 AQ CO CONTRACTING BAT
Place of performance
Camp Casey, 96224
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W90VN826RA024
Notice ID
d0a543ea9d2148ae973a45ac83962d74

Description

Login at https://piee.eb.mil and search for 'W90VN826RA024' to obtain more details.*

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1SolicitationCurrent

    November TA-A Maneuver

    Notice d0a543ea9d2148ae973a45ac83962d74 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Login at https://piee.eb.mil and search for 'W90VN826RA010' to obtain more details.*
100%
Combined Synopsis02/20/2026
**08/17 - See attached abstracts for bid information** **Amendment 0002 - Provides revised Specification Section 01 35 16, removes Wetland Mitigation Credit Purchase from list of options in project description, and extended bid due date from 04August2026 to 13August2026 at 10:00AM PDT - See attached amendment for details. ** Amendment 0001 - See attached amendment for details.** ** Note - the table of contents in this solicitation attachment is incorrect. The attachments included in this PIEE solicitation post are the correct attachments for this requirement. A forthcoming amendment with the correct table of contents will be posted.**Scope of this project is the repair of approximately 2,500 LF by replacement, including repairs of ties, rails, turnouts, rail crossings and other track material for multiple rail curves on the tidal side of the installation at Military Ocean Terminal, Concord (MOTCO). The base bid package includes repair by replacement of curves 9 and 10 with curvature less than 12 degrees. Tracks will be constructed per standards in UFC 4-860-01FA and American Railway Engineering and Maintenance of Way Association (AREMA). The following work will be included as contract options: - UXO clearance and transportation, - UXO blow-in-place, - Mission stand down
68%
Solicitation08/13/2026
The purpose of Amendment 0001 to Solicitation W912BU26BA012 is as follows: a.) Provide answers to the RFIs submitted. b.) Update FAR Provision 52.252-3, Alterations in Solicitation.The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for FY26 SR-1 Bearing Replacement Contract. DESCRIPTION: This contract is for the replacement of the bridge bearings on the Senator Roth Bridge. The bridgeis located in St. Georges, DE and is a major high lever bridge that crosses the Chesapeake and Delaware Canal. The bridge is a 6-lane highway bridge located on Route 1 and has approximately 39 million crossing per year. Work covered under this contract shall include jacking of the bridge, removal of the existing bearings, replacement of the bearings, placement of the bridge, and all associated traffic control.The major items of work to be performed under this contract include, but are not limited to, thefollowing:Provide all temporary traffic control in accordance with a Contractor-prepared, MDDOT approved, temporary traffic control plan.Replace 8 pot bearingsb. Temporary jacking of bridgec. Replace elastomeric bearingsd. Spall and Crack repairsThe Contractor will need to completely close the bridge in one direction for each bearing replacement. There are 4 total bearing replacements associated with this contract (2 Northbound, 2 Southbound). A full bridge closure for each direction will be permissible starting on Friday Night and extending through Sunday. Contractor will be responsible for all traffic control measures associated with the closures. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $1,000,000 and $5,000,000. NAICS CODE AND SBA SIZE STANDARD: 237990, OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, Size Standard $45.0M. PERIOD OF PERFORMANCE: 180 Calendar Days from the Notice to Proceed (NTP). SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
68%
Solicitation07/22/2026
Please see the attached pdf for the information pertaining to the Pre-Solicitation Notice for Chesapeake and Delaware Chesapeake City Bridge Painting and Repairs
68%
Pre-Solicitation07/16/2026
Please see the attached pdf for the information pertaining to the Sources Sought Notice for Chesapeake and Delaware Chesapeake City Bridge Painting and Repairs
68%
Market Research06/12/2026

Additional Details

Solicitation Number

W90VN826RA024

Archive Date

May 5, 2027

Office Address

APO, AP, 96224-5228