GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM MDT
- Posted
- October 26, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE
- Place of performance
- Fifty Six, Arkansas, 72533
- PSC
- Z2PZ: REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240BH26R0013
- Notice ID
- d510479d192c4d23b496c1eeb23798e5
Description
On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
1. Post the final RFI Q&A.
This amendment must be acknowledged and submitted with your proposal.
**************************************************************************************************************************************
On October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
1. Extends the proposal due date from 10/14/2026 to 10/29/2026.
This amendment must be acknowledged and submitted with your proposal.
***************************************************************************************************************************************
On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
1. Extends the proposal due date from 09/30/2026 to 10/14/2026.
This amendment must be acknowledged and submitted with your proposal.
***************************************************************************************************************************************
On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.
2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.
This amendment must be acknowledged and submitted with your proposal.
***********************************************************************************************************************************************
On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”
This SF30 must be acknowledged and submitted with your proposal.
***********************************************************************************************************************************************
This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (21)
- Download
C05 SF30 1240BH26R0013-0005.pdf
86 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
C05a RFI Final QA 1240BH26R0013.docx
33 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
C05 SF30 1240BH26R0013-0004.pdf
85 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
C05 SF30 1240BH26R0013-0003.pdf
85 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
C05b Site Visit 1240BH26R0013.pdf
1.5 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05 F30 1240BH26R0013-0002.pdf
104 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05a RFI QA 1240BH26R0013.docx
29 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05m Attachment 11 Golder 1240BH26R0013.pdf
980 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C05 SF30 1240BH26R0013-0001.pdf
84 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C04 SF1442 1240BH26R0013.pdf
321 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04b Attachment 2 Specs BSC LH 1240BH26R0013.pdf
1.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04d Attachment 4 Dwgs BSC Handrails 1240BH26R0013.pdf
86 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04e Attachment 5 Env Assessment 1240BH26R0013.pdf
7.8 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04g Attachment 7 Recommendations1240BH26R0013.pdf
3.9 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04c Attachment 3 Drawings BSC 1240BH26R0013.pdf
3.9 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04k Attachment 11 General Decisio AR20260022 05182026.pdf
1.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04i Attachment 9 Site Visit 1240BH26R0013.docx
125 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04a Attachment 1 SOW BSC 1240BH26R0013.docx
73 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04h Attachment 8 Estim Quant 1240BH26R0013.xlsx
33 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04j Attachment 10 RFI Form 1240BH26R0013.docx
29 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04f Attachment 6 SOI 1240BH26R0013.xlsx
13 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
- 2Version 2Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
- 3Version 3Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
- 4Version 4Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
- 5Version 5Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
- 6Version 6Combined Synopsis/SolicitationCurrent
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Similar Opportunities
Additional Details
Solicitation Number
1240BH26R0013
Archive Date
Nov 13, 2026
Office Address
WASHINGTON, DC, 20250