GovChime
Notice ID: d5842676cb384a5fbe20ce4d52cfae46SolicitationArchived

Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

Archived on January 30, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EST
Posted
January 14, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
561730: Landscaping Services
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
Place of performance
Mansfield Center, Connecticut
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912WJ26QA029
Notice ID
d5842676cb384a5fbe20ce4d52cfae46

Description

The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT.

THE WORK CONSISTS OF: Contractor shall provide all labor, equipment, materials, transportation, and permits to perform the chemical vegetation control services at the Mansfield Hollow Lake Project.

The Mansfield Hollow Lake Project includes 4 work areas for a total of approximately 55 acres. The areas require maintenance spraying/spot treatments and/or cut stump treatment of vegetation on rock slopes and dam structures, and shoreline. Contractor shall remove, chip and deposit onsite in designated area all cut woody vegetation debris. Chemical Utilization Spray Reports shall be submitted upon completion of chemical herbicide application.

The Contractor’s work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the services required in the Performance Work Statement.

This procurement is set-aside for small business vendors. The applicable NAICS code is 561730 with a Small Business Size Standard of $9.5 Million.

ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (4)

  • Amendment W912WJ26QA029-0002.pdf

    3.7 MBAdded in Solicitation version 7Posted
    Download
  • Amendment W912WJ26QA029-0001.pdf

    3.7 MBAdded in Solicitation version 5Posted
    Download
  • Attachments 26QA029.pdf

    4.0 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation W912WJ26QA029.pdf

    3.2 MBAdded in Solicitation version 4Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

    Notice eec4b8dc523d45f8a4e70b914df7591d on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

    Notice 5574419858ac452a9948f07050487b8b on SAM.gov

  3. 5
    Version 5SolicitationArchived

    Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

    Notice 347cbf2bc6254586be571fdbf2162bab on SAM.gov

  4. 7
    Version 7SolicitationArchivedCurrent

    Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

    Notice d5842676cb384a5fbe20ce4d52cfae46 on SAM.gov

  5. 10
    Version 10Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Chemical Vegetation Control Services, Mansfield Hollow Lake, Mansfield Center, CT

    Notice 4748852430404359a51bb91301cc4d3f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The United States Coast Guard Academy intends to solicit quotations for ballfield maintenance services at the Nitchman Field Complex in New London, Connecticut. The contractor shall provide all labor, supervision, materials, equipment, transportation, and incidentals necessary to maintain the Baseball, Softball, and track-and-field/practice soccer fields in accordance with NCAA specifications. Required services include seasonal late-winter/early-spring maintenance of the baseball and softball infields and turf areas, including scarifying, regrading, infield and warning-track material placement, lip removal, edging, rolling, turf repair, replacement and verification of home plates and pitching rubbers, baseline and mound adjustments, and bullpen and pitching-mound repairs. The contractor shall also perform June deep-tine hollow-core aeration and topdressing of all three fields. The anticipated contract consists of a one-year base period, January 1, 2027 through December 31, 2027, with four one-year option periods.
-Combined Synopsis11/18/2026
COMBINED SYNOPSIS/SOLICITATION West Haven Grounds Maintenance VA Connecticut Healthcare System West Haven VAMC Solicitation Number: 36C24127Q0004 Posted Date: October 20th, 2026 Response Deadline: October 29th, 2026, 10:00 AM Eastern Time Set-Aside: Total Small Business Set-Aside NAICS Code: 561730 Landscaping Services Size Standard: $9.5 Million Product Service Code (PSC): S208 Grounds Maintenance Contract Type: Firm-Fixed Price (FFP) Place of Performance: VA Connecticut Healthcare System, 950 Campbell Avenue, West Haven, CT 06516 1. GENERAL INFORMATION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format prescribed in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. This solicitation is issued as a Request for Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01. This acquisition is set aside 100% for Small Business in accordance with FAR 19.502-2. Offerors must be registered and active in SAM.gov at the time of offer submission and at time of award. 2. REQUIREMENT OVERVIEW The Department of Veterans Affairs (VA), Network Contracting Office 1 (NCO 1), on behalf of the VA Connecticut Healthcare System, requires comprehensive grounds maintenance, snow and ice removal, and storm drain maintenance services at the West Haven VA Medical Center. Services are required to support 24/7 Medical Center access and operations for veterans and staff year-round. 3. STATEMENT OF WORK (SOW) 3.1 Background The VA Connecticut Healthcare System requires annual services for grounds maintenance, snow and ice removal, hauling, and treatment services at the West Haven VA Medical Center, located at 950 Campbell Avenue, West Haven, CT 06516. 3.2 Scope of Work The Contractor shall furnish all labor, materials, equipment, tools, supervision, disposal, and all incidentals necessary to perform grounds maintenance, snow and ice removal, and storm drain cleaning services as described herein. The Contractor shall coordinate all work with the VA COR and designated representatives of Facilities Management Service. 3.3 Contractor Qualifications To be eligible for award, the Contractor shall: Maintain a field service representative located within 200 miles of the West Haven Campus and capable of responding within two (2) hours. Possess proper equipment, materials, and support to provide all services under this contract. Provide, upon request, documentation of certification and training on specific equipment used under this contract. The CO and/or COR reserve the right to reject any Contractor personnel and refuse permission to work on-site based on credentials or conduct. 3.4 Description of Services 3.4.1 Snow and Ice Removal Snow Removal (SOW §1.1) The Contractor shall remove snow from all sidewalks, steps, stairs, stair and ramp landings, entrance ramps, roadways, roads, parking lots, and parking structures across the West Haven VA campus as delineated in Appendix A (Snow Removal Map) and Appendix D (Lots and Roads). All snow removal zones are considered high priority and shall be worked simultaneously. Snow piling will be in designated locations per the COR. Snow removal shall commence when on-site accumulation reaches one (1) inch and/or within one (1) hour after snowfall stops, whichever occurs first. Snow removal shall continue until all accumulation has ended and all covered surfaces are fully cleared. When snowfall is forecasted, the Contractor shall pretreat all snow removal zones at least two (2) hours prior to each forecasted event. Snow shall not be piled on paved areas (roads or parking lots). Piles shall maintain safety and maximize usable parking area. The Contractor shall clear all handicap access points throughout the campus at all times. Snow removal quantities are based on total snowstorm accumulation as reported by the National Weather Service https://www.weather.gov/ for West Haven, CT. Contract quantities include up to 50 inches of snow and 5,000 lbs of ice melt. Amounts exceeding contract quantities require Contracting Officer authorization via contract modification. Ice melt application shall be included with every snow and ice removal event. All ice and snow melt materials shall be provided by the Contractor. Snow removal shall cover the following areas: Roadways and Drives: Campbell Avenue Entrance, Spring Street Entrance, Lawson Road, Service Road, Building 1 Loading Dock, Building 2 Loading Dock, Building 2 Main Entrance, Building 5 Main Entrance, Ambulance Bay, Ring Road, Building 19, Building 16, and Veterans Drive. Parking Lots (1,378 regular spaces / 129 accessible spaces): Parking Lots 1, 2, 4, 5, 6, 7, 8, 10, 14, 15, 16, 18, 24, Emergency Room, and Fisher House. Sidewalks and Building Entrances (12,636 SF total): All areas as identified in the West Haven VA Medical Center Sidewalk/Walkway and Building Entrance Inventory. Ice Removal (SOW §1.2) The Contractor shall immediately treat and remove ice on all sidewalks, steps, stairs, ramp landings, and entrance ramps. Ice removal shall commence when any accumulation occurs and/or within one (1) hour after ice stops. Approved ice melt product for sidewalks: Calcium Magnesium Acetate (CMA) such as Inferno or equal. Sand is not permitted. Approved product for roads and parking lots: Salt or other COR-approved ice control products. Pretreatment shall occur at least two (2) hours prior to each forecasted ice/freezing precipitation event. The Government will provide a bulk salt storage area on-site for Contractor use. Personnel Management (SOW §1.3) The Contractor shall provide supervision for full utilization of staff and coordination with the VA COR. The Contractor shall provide standard log forms for COR review and approval prior to each option year and submit daily activity logs documenting all campus activities. Response Time and Hours of Operation (SOW §1.5) The Contractor shall provide 24/7 response to snow and ice events within one (1) hour. Parking Garage Snow Removal (SOW §1.6) Prior to each winter season (no later than November 1 of each contract year), the Contractor and COR shall conduct a pre-season walkthrough of the garage. The Contractor shall provide a written photographic damage report within 10 calendar days of the walkthrough. Snow removal from the garage roof deck shall use approved equipment only. Plow trucks shall not exceed 10,000 lbs fully loaded. Plow cutting edges contacting precast surfaces shall have well-maintained rubber tipper blades. Snow piling on the garage deck is not authorized; plows shall be held approximately 1 inch from the deck surface and approach seams at no greater than a 75-degree angle. Parking Garage De-Icing (SOW §1.7) Prior to the first freeze of each season, the Contractor shall submit the de-icing product intended for use, with at least one alternate, and shall walk the garage with the maintenance team to inspect drains and potential problem areas. Authorized products for precast concrete surfaces are limited to Calcium Magnesium Acetate (CMA) or Urea-Based deicers. Equipment weight limits for de-icing match snow removal requirements. Salt and De-Icing Products (SOW §1.8) All products used for snow removal and de-icing must be approved by the COR prior to use. The Contractor is responsible for providing all products required for pretreatment, snow melt, and de-icing. The Government will not provide any snow removal or de-icing products. 3.4.2 Grounds Maintenance Mowing (SOW §2.1) The Contractor shall mow approximately 30 acres of improved grounds at the West Haven VAMC (Appendix C). Grass height shall be maintained between 3 and 6 inches. Grass clippings shall be removed and disposed of offsite or mulched when visible after mowing. Clippings shall be removed from all paved surfaces. Portable high-CFM blowers shall not be used during normal working hours near personnel or parked vehicles. Edging (SOW §2.2) Sidewalks, driveways, curbs, and concrete or asphalt edges shall be edged at least every other mowing. Trimming (SOW §2.3) Grass and weeds shall be trimmed around all fixed obstacles (trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, and islands) concurrent with mowing. Trimming height shall match surrounding grass heights. Damage to trees or shrubs caused by the Contractor shall be repaired within 15 days of noticed or reported damage, including replacement with plants of the same size and type if necessary. Irrigation (SOW §2.4) The Contractor shall maintain and conduct spring turn-on and fall winterization of the irrigation system in front of Building 2 and within the island for the main flagpole near the parking garage. Fall Leaf Removal (SOW §2.5) Fallen leaves and branches shall be removed from all improved grounds areas (Appendix C) at intervals of not less than weekly between Labor Day and Thanksgiving each year, continuing until all tree leaves have fallen. All debris shall be disposed of offsite at an authorized disposal location in compliance with applicable local, state, and federal regulations. Repair of Damaged Areas (SOW §2.6) Improved ground areas damaged by Contractor vehicles or equipment shall be seeded or sodded to meet the standard of surrounding areas. All other areas shall be repaired and restored to match surroundings. Downed Tree and Limb Removal (SOW §2.7) The Contractor shall remove all downed tree limbs and fallen trees on-site. The Contractor must possess proper equipment to safely perform this work, including a bucket truck, chipper, and trained chainsaw crews. Note: Fertilization, pest control, soil aeration, and emergency/special event services are expressly excluded from this contract. 3.4.3 Storm Drain Maintenance Storm Drain Cleaning (SOW §4.1) The Contractor shall maintain and clean the full storm drain inventory as identified in Appendix E (West Haven) and Appendix F (Newington) on a bi-annual basis in April and October. Cleaning shall include removal of all debris from catch basins, drain pipes, and attaching structures; inspection of termination points; replacement of covers; and inspection of grates. Annual hydro jetting of all storm drain pipes shall be performed in either April or October, with a minimum of 335 days between consecutive hydro jetting events. The Contractor shall document and immediately notify the COR of any broken or defective catch basins or observations of discharges of sediments or pollutants into the stormwater system. A cleaning and inspection report including all deficiencies, inspection data, and photographs shall be submitted to the CO and COR within 14 calendar days of each cleaning. Disposal (SOW §4.2) All sediment, waste materials, and liquids shall be disposed of in compliance with the National Pollutant Discharge Elimination System (NPDES) MS4 Permit and applicable Department of Natural Resources and Environment regulations. Toxicity Characteristic Leaching Procedure (TCLP) testing, if required by the destination disposal facility, is the Contractor's responsibility. Decanting into the stormwater system or sanitary sewer is strictly prohibited. Disposal reports shall be submitted to the CO and COR within 30 calendar days of each scheduled cleaning. 3.5 Performance Standards Performance Objective SOW Reference Performance Standard Acceptable Quality Level Snow Removal §1.1 Snow removed; areas safe for pedestrian and vehicle traffic Customer complaints 2 per snow event Ice Control/Removal §1.2 Ice treated and removed; areas safe for traffic Customer complaints 2 per ice event Parking Garage Snow Removal §1.6 Snow removed per §1.6; areas safe for traffic Customer complaints 2 per snow event Parking Garage De-Icing §1.7 De-icing per §1.7; areas safe for traffic Customer complaints 2 per snow event Grounds Maintenance §2 Grass maintained at proper height; edging, trimming, leaf removal, and repairs completed per specifications Customer complaints 2 per month Storm Drain Maintenance §4.1 Drains cleaned bi-annually; report received within 14 days Customer complaints 1 per year Disposal §4.2 Disposal report submitted within 30 days Customer complaints 1 per year 3.6 Submittals and Deliverables Copy of equipment safety inspections submitted to the CO prior to use Copies of all personnel qualifications, training, and applicable licenses Electronic copy of all services performed submitted to the CO, COR, and Facilities Management Service Maintenance Supervisor within 48 hours of services provided Standard daily activity log forms for COR approval prior to each contract year Pre-season parking garage walkthrough report with photographs within 10 calendar days of walkthrough Storm drain cleaning and inspection reports within 14 calendar days of each cleaning Disposal reports within 30 calendar days of each scheduled cleaning Safety Plan submitted to COR prior to commencement of work 3.7 Hours of Work and Parking Work shall be coordinated with the COR. Snow and ice removal services shall be available 24 hours a day, 7 days a week. One Contractor vehicle is permitted to park on-site Monday through Friday, 6:00 AM to 5:00 PM. Outside those hours, Contractor vehicles may park on-site only when work is actively being performed. Parking within the parking garage or patient-designated areas is strictly prohibited at all times. Parking passes for work vehicles shall be issued by the VA Police Office. 3.8 Sign-In/Badging All Contractor personnel, subcontractors, and representatives visiting VA sites shall sign in upon arrival at Building 15 and retain a temporary VA badge prominently displayed at all times. Each individual shall record their name, company name, VA project title, reason for visit, and times of arrival and departure. After-hours site visits must be arranged in advance during normal working hours. 3.9 Safety Requirements The Contractor shall develop and submit a Safety Plan to the COR prior to commencing work, in accordance with the latest editions of applicable VA guidelines, NFPA, and all applicable federal and state codes, including TJC requirements. Per VA Directive 1805, smoking, vaping, and smokeless tobacco are prohibited on all VA grounds, including in vehicles. No photography of VA premises is permitted without written authorization from the Contracting Officer. Patients and staff shall not be photographed at any time. The Contractor shall confine all operations and material storage to areas authorized by the CO or COR. 3.10 NARA Records Management The Contractor shall comply with all applicable federal records management requirements, including 44 U.S.C. Chapters 21, 29, 31, and 33; the Freedom of Information Act (5 U.S.C. 552); the Privacy Act (5 U.S.C. 552a); and 36 CFR Parts 1222 and 1228. All deliverables are the property of the U.S. Government. No records shall be retained, sold, or destroyed without prior written consent of the Contracting Officer. 4. CONTRACT CLAUSES AND PROVISIONS Provisions (Pre-Award) FAR 52.212-1 Instructions to Offerors Commercial Products and Commercial Services FAR 52.212-3 Offeror Representations and Certifications Commercial Products and Commercial Services (Complete annually via SAM.gov) FAR 52.204-7 System for Award Management FAR 52.204-16 Commercial and Government Entity Code Reporting FAR 52.215-1 Instructions to Offerors Competitive Acquisition FAR 52.219-1 Small Business Program Representations Clauses (Post-Award) FAR 52.212-4 Contract Terms and Conditions Commercial Products and Commercial Services FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable subparagraphs include: 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.219-6 Notice of Total Small Business Set-Aside 52.219-28 Post-Award Small Business Program Rerepresentation 52.222-21 Prohibition on Segregated Facilities 52.222-26 Equal Opportunity 52.222-36 Equal Opportunity for Workers with Disabilities 52.222-41 Service Contract Labor Standards (Wage Determination No. 2015-4127, Revision 36 [West Haven] and Wage Determination No. 2015-4119, Revision 35 [Newington] apply and are incorporated herein) 52.222-50 Combating Trafficking in Persons 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.225-13 Restrictions on Certain Foreign Purchases 52.232-33 Payment by Electronic Funds Transfer System for Award Management FAR 52.217-8 Option to Extend Services FAR 52.217-9 Option to Extend the Term of the Contract FAR 52.232-18 Availability of Funds FAR 52.237-3 Continuity of Services FAR 52.246-4 Inspection of Services Fixed Price VAAR 852.203-70 Commercial Advertising VAAR 852.232-72 Electronic Submission of Payment Requests VAAR 852.237-70 Contractor Responsibilities 5. CLIN STRUCTURE / PRICE SCHEDULE Offerors shall complete the following price schedule in full. All prices shall be inclusive of labor, materials, equipment, supplies, disposal, travel, overhead, and profit unless otherwise noted. No additional charges beyond those quoted below will be accepted. BASE YEAR November 30, 2026 November 29, 2027 CLIN Description Qty Unit Unit Price Total Price 0001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 0002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 0003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 0004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 0005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 0006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ BASE YEAR TOTAL: $__________ OPTION YEAR 1 November 30, 2027 November 29, 2028 CLIN Description Qty Unit Unit Price Total Price 1001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 1002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 1003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 1004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 1005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 1006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 1 TOTAL: $__________ OPTION YEAR 2 November 30, 2028 November 29, 2029 CLIN Description Qty Unit Unit Price Total Price 2001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 2002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 2003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 2004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 2005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 2006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 2 TOTAL: $__________ OPTION YEAR 3 November 30, 2029 November 29, 2030 CLIN Description Qty Unit Unit Price Total Price 3001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 3002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 3003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 3004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 3005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 3006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 3 TOTAL: $__________ OPTION YEAR 4 November 30, 2030 November 29, 2031 CLIN Description Qty Unit Unit Price Total Price 4001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 4002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 4003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 4004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 4005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 4006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 4 TOTAL: $__________ TOTAL EVALUATED PRICE (Base Year + Option Years 1 4): $__________ Options will be evaluated in accordance with FAR 52.217-5. The Government is not obligated to exercise any option. Options may be exercised within the timeframes specified in FAR 52.217-9. There will be a line item for Emergency and Unanticipated Grounds Services DO NOT PROVIDE PRICING FOR THIS LINE ITEM, PRICING WILL BE REQUESTED POST AWARD AS EMERGENCIES OCCUR. 6. EVALUATION CRITERIA This acquisition will be evaluated using Simplified Acquisition Procedures in accordance with FAR Part 13. Award will be given to the Lowest Priced Technically Acceptable (LPTA) offeror whose proposal meets all the following criteria: Technical Acceptability Offeror demonstrates the capability to perform all services described in the SOW, including 24/7 snow and ice response, grounds maintenance, and storm drain cleaning; confirms field service representative within 200 miles of West Haven, CT; and provides evidence of required equipment, personnel qualifications, and licenses Past Performance Acceptability Offeror provides a minimum of three (3) references for contracts of similar scope and complexity performed within the last five (5) years; past performance will be evaluated on a Go/No-Go basis as either Acceptable or Unacceptable. Price Offeror submits a complete and realistic price schedule for all CLINs (Base Year + Option Years 1 4); award will be made to the lowest total evaluated price among all technically acceptable offerors The Government will not make an offeror whose price is determined to be unreasonably low or unbalanced. 7. PROPOSAL SUBMISSION REQUIREMENTS Offerors shall submit the following in two separate volumes: Volume I Technical and Past Performance Technical Capability Statement (no more than 10 pages) describing: Experience performing grounds maintenance, snow/ice removal, and storm drain services at a comparable facility (healthcare, institutional, or large campus) Equipment inventory, including snow removal and storm drain cleaning equipment Staffing plan and key personnel qualifications Management approach and quality control plan Confirmation of field service representative within 200 miles of West Haven, CT Past Performance Minimum three (3) references for contracts of similar scope and complexity performed within the last five (5) years, including contract number, agency/company name, POC and contact information, period of performance, contract value, and description of work Volume II Price Completed CLIN pricing schedule (Base Year + Option Years 1 4) Completed Representations and Certifications (via SAM.gov or attached) Proposals shall be submitted electronically to: Contracting Specialist: Nathan Langone Email: Nathan.Langone@va.gov Network Contracting Office 1 (NCO 1) Proposal Deadline: October 29th, 2026, 10:00 AM Eastern Time Late proposals will not be accepted. 8. ADDITIONAL INFORMATION All offerors must be registered and active in SAM.gov at time of proposal submission and award. This acquisition is set aside for Small Business per FAR 19.502-2. Offerors must represent themselves as a small business under NAICS 561730 at time of offer. This contract is subject to the Service Contract Labor Standards (Service Contract Act) per FAR 52.222-41. The following Wage Determinations are incorporated into this solicitation and will be incorporated into the resulting contract: Wage Determination No. 2015-4127, Revision 36 West Haven, CT Wage Determination No. 2015-4119, Revision 35 Newington, CT Offerors are responsible for reviewing both applicable wage determinations on SAM.gov prior to submission and ensuring proposed prices reflect the required wage rates for each location. Questions shall be submitted in writing to the Contracting Specialist no later than October 26th, 2026, 10:00 AM Eastern Time. Questions received after this date may not receive a response. The Government reserves the right to make award without discussions. The Government reserves the right to cancel this solicitation at any time. The Government reserves the right to exercise option years subject to availability of funds and satisfactory contractor performance. This solicitation is for commercial services as defined under FAR Part 2 and FAR Part 12. END OF COMBINED SYNOPSIS/SOLICITATION
-Combined Synopsis10/29/2026
-AwardedOpen
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statement, required to perform the Mowing and Maintenance Services for John W. Flannagan Dam Reservoir and North Fork of Pound River Lake, VA. All work shall be completed in accordance with the Performance Work Statement and terms and conditions of the contract. The not-to-exceed amount of $3,000,000.00 includes the base year and all options exercised.
-Solicitation12/04/2026
The Huntington District Corps of Engineers intends to procure an Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Mowing and Maintenance Services for Burnsville Lake, Burnsville, WV. The Performance Period will be a base period of one (1) year and four (4) option periods of one (1) year each. The base period for this contract will be from 01 January 2027 through 31 December 2027. The contract will be a Firm Fixed Price, Commercial Service type contract with a ceiling amount of $1,100,000.00 over the entire contract period. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Evaluation Factor A (Past Performance), Factor B (Management and Controls), Factor C (Equipment/Personnel), and Factor D (Cost/Price) are listed in descending order of importance. The best value tradeoff process will be used in this acquisition with award made (as a whole) to the offeror whose quote conforms to the solicitation and has been evaluated as most advantageous to the Government with appropriate consideration given to the evaluation factors. Offerors will be cautioned that the award may not necessarily be made to the lowest price offered. All non-priced factors, when combined, are more important than price. In accordance with 52.219-14, Limitations on Subcontracting (DEVIATION), by submission of an offer and execution of a contract, the Contractor agrees to comply with the limitations on subcontracting. To demonstrate compliance, the contractor shall submit the Post-Award Contractors Limitations on Subcontracting Certification to the Contracting Officer or Contracting Officers Representative (COR) if one has been appointed. For contracts with a period of performance lasting less than 12 months, the contractor shall submit the Certification at the end of the performance period. For contracts with a period of performance lasting more than 12 months, the contractor shall submit the Certification at the one-year anniversary of contract award and then annually thereafter until the end of the performance period. For contracts with options years, the contractor shall submit the Certification at the end of the base year and then at the end of each subsequent option year. Solicitation documents will be available on or about 09 November 2026, online at https://www.piee.eb.mil. To be eligible for contract award, an Offeror must be registered in the System for Award Management (SAM). Register via the SAM website at https://www.sam.gov. Questions may be submitted to Tatum Bock at tatum.a.bock@usace.army.mil . A NAICS Code of 561730 has been established for this solicitation. The size standard is $9,500,000 in average annual receipts. This procurement is 100% Small Business set-aside.
-Combined Synopsis12/02/2026

Additional Details

Solicitation Number

W912WJ26QA029

Archive Date

Jan 30, 2026

Office Address

CONCORD, MA, 01742-2751