Notice ID: d5979f2abb544b6981b4dd5a2a2139bcCombined Synopsis/Solicitation
SAFETY SHOWER
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM CDT
- Posted
- August 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 332913: Plumbing Fixture Fitting and Trim Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
- Place of performance
- McAlester Army Ammunition Plant; 1 C-Tree Road, Building 6; McAlester, OK 74501, 74501
- PSC
- 4240: SAFETY AND RESCUE EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911S226U4017
- Notice ID
- d5979f2abb544b6981b4dd5a2a2139bc
Description
ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60 F (15.6 C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0 F (-17.8 C) ________________________________________ Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W911S226U4017piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationCurrent
SAFETY SHOWER
Similar Opportunities
- WATER HEATER AND PROPRESS - FORT BRAGG
Department of War · Posted 08/20/2026
- Plumbing items for Fort Bragg Barracks
Department of War · Posted 02/09/2026
- Ballistic Glass Panels
Department of War · Posted 10/16/2026
- MDC BROOKLYN - REMOVE AND REPLACE SHOWER PARTITIONS
Department of Justice · Posted 10/20/2026
- GUN SHIELD
Department of War · Posted 10/05/2026
Additional Details
Solicitation Number
W911S226U4017
Archive Date
Aug 10, 2027
Office Address
FORT DRUM, NY, 13602-5220