Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

Archived on February 3, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM EST
Posted
January 9, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.FDO EUSTIS.W6QM MICC FT LEE
Place of performance
Radford, Virginia
PSC
J030: MAINT/REPAIR/REBUILD OF EQUIPMENT- MECHANICAL POWER TRANSMISSION EQUIPMENT
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W91QF526RA002
Notice ID
d720ede81b594370bbe9fa6a49210fef

Description

ADDENDUM #3 1/9/26

RFI #2

1. Is the 2 hour on site requirement for Emergence call a must have?

       a. Yes.   These are back-up generators that need to be operational within 2hrs or less as IT equipment switches to battery back-up which only lasts for a very short time with the heavy data center load.  

2. Can you clarify the Testing requirements for the Load Banking of each generator ? Load Percentages and time for each level

       a. This is outlined within PWS para 4.1.5.1
                  i. 30 minutes at 20% of rated load of genset.
                 ii. 30 minutes at 50% of rated load of genset.

3. Are there different requirements for each generator?

       a. No, generators are all Caterpillar and follow the same type of load bank testing.

4. How often does the Load Testing happen, and what time of year?

       a. This is outlined with PWS para 4.1.5.1 

               i. Annual load bank test

5. Doing the Advantage ESC, witch CAT Dealership does the report get sent to?

        a. Once the vendor performs services, they return to their office to finalize the service and send a copy to our facilities management team and the COR.  This action usually takes them less than 2-3 days (depending on workload)

END

ADDENDUM #2 1/8/26

An updated Combined Synopsis has been posted.

END

ADDENDUM #1 1/6/26

RFI #1

1. Could you please confirm whether this is a new requirement? If not, we kindly request the incumbent contractor’s name and the previous contract number.

            a. This action is a follow-on requirement

Contract number:  W91QF0-21-P-0040
Contract Awardee:  Virginia Energy & Lighting, LLC.
Description of requirement:  Caterpillar Diesel Standby Generator Preventive Maintenance (PM) and Emergency Repair Services (ERS)
Method of procurement:  Set-Aside Small Business
Contract type:  Firm-Fixed Price
Number of option periods:  4

2. Additionally, are there any notable changes to the scope of work compared to the prior award?

      a. The scope of the contract has changed significantly since the previous award. Key additions include annual Advantage Extended Service Coverage (ESC) certification inspection, load bank testing, battery replacement, consumable parts replacement, and fluid sampling and testing services. These enhancements were introduced to address the requirements brought about by upgraded equipment, improved maintenance procedures, the need for additional coverage for new assets, and expanded preventive maintenance services. Incorporating fluid sampling also helps prevent equiopment  damage, making the new contract more comprehensive and cost-effective by consolidating service that were previously sourced separately at higher expense.

END

This is to confirm that the site visit for the requirement is scheduled for January 7, 2026, at 0900 AM. Please confirm by email to Myrisha Mullen @ myrisha.l.mullen2.civ@army.mil, if you will be in attendance. 

Please find attached the following documents for your reference:

  • Performance Work Statement (PWS)
  • Combined Synopsis
  • CLIN Structure

Additionally, please note that the deadline for submitting questions is January 9, 2026, at 1500 PM. 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (3)

  • Combined Synopsis.pdf

    485 KBAdded in Solicitation version 3Posted
    Download
  • CLIN Structure.pdf

    20 KBAdded in Solicitation version 1Posted
    Download
  • 0000 - PWS.pdf

    268 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

    Notice a27ade5c094740d5a79b34ed19160f0a on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

    Notice 7f9c731561a14d2cbcdf0ded311bd364 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

    Notice 8d79929918ad4fdbb1feb32aaa5bbb41 on SAM.gov

  4. 5
    Version 5SolicitationArchivedCurrent

    Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

    Notice d720ede81b594370bbe9fa6a49210fef on SAM.gov

  5. 8
    Version 8Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

    Notice 749c6c9b85104f71a1e404b1957b148f on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W91QF526RA002

Archive Date

Feb 3, 2026

Office Address

FORT LEE, VA, 23801