HI FLAP CR562(1) Kilauea Point

Active, no response deadline listed. Full description on SAM.gov.

Overview

Posted
October 15, 2026
Notice type
Presolicitation
Set-aside
No Set aside used
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Kilauea, Hawaii
PSC
Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
6982AF27B000008
Notice ID
dc14203ba77443638a2488066e588f26

Description

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

PROJECT NAME: HI FLAP CR562(1) Kilauea Point

PROJECT DESCRIPTION:

Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.

The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.

PRINCIPAL WORK ITEMS:

  • 18,500 square yards of Removal of Pavement, Asphalt
  • 3,370 cubic yards of Roadway Excavation
  • 2,900 ton of Roadway Aggregate, Method 2
  • 4,200 ton of Asphalt Concrete pavement, Type 1
  • 630 square yard of minor concrete Pavement, Reinforced
  • 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted)
  • 5,670 square yards of Sidewalk, Concrete
  • 34 Accessibility Ramps, Concrete

ANTICIPATED SCHEDULE: 

Advertise: End of October or Early November 2026

Bid Opening: December 2026

Award: January 2027

Construction:  January 2027 –January 2028

ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Stephanie Navarro

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 1
    Version 1PresolicitationCurrent

    HI FLAP CR562(1) Kilauea Point

    Notice dc14203ba77443638a2488066e588f26 on SAM.gov