GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MST
- Posted
- October 21, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA NORTHWEST 6
- Place of performance
- Garden City, Utah
- PSC
- Y1KA: CONSTRUCTION OF DAMS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240BH27Q0002
- Notice ID
- dc614806cdda4cf7a65ba7034b459649
Description
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.
Solicitation number 1240BH27Q0002 is issued as a Request for Quotation (RFQ) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation on the Uinta/Wasatch/Cache National Forest.
This project consists of reconstructing portions of the Tony Grove Dam as shown in the drawings and described in the specifications. This also includes replacing outlet works and raising the dam crest along with the addition of embankment material.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237990. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency.
Amendment 01 - Summary: Extend quote due date to November 20, 2026.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (6)
- Download
C05 Amendment 01 Tony Grove.pdf
85 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C04 Attachment 4 - Drawings Tony Grove.pdf
9.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 3 - Specifications Tony Grove.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 5 - DBA WD UT20260105 Cache Co 051826.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 1 - Solicitation Tony Grove.pdf
868 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 2 - SOI Tony Grove.xlsx
20 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
- 2Version 2Combined Synopsis/SolicitationCurrent
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Similar Opportunities
Additional Details
Solicitation Number
1240BH27Q0002
Archive Date
Dec 30, 2026
Office Address
Portland, OR, 972042829