PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Active, responses due . Full description on SAM.gov.
Description
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room.
PLEASE NOTE the important information related to this RFP:
- Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT
- Last Day for Questions: November 5, 2026, 4:00p CDT
- PROPOSALS DUE: November 19, 2026, 2:00p CDT
To attend the Pre-Proposal Meeting and Site Visit, PPE is required.
As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.
Please note that when entering Fermilab:
- All vehicles are subject to search
- No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site.
- No explosives or any other apparatus or material hazardous to the public or property are allowed on site.
- No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.
- No personal alcohol or marijuana
- No Smoking or vaping within buildings and within 15-25 feet of entrances
- Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Files (25)
- Download
378854_MR.pdf
323 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_25_Drawings.zip
17 MBAdded in Solicitation version 1Posted - Download
EXHIBIT_24_Sample Subcontract.pdf
209 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_23_Performance Bond.pdf
102 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_22_Payment Bond.pdf
115 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_21_Bid_Bond.pdf
115 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_20_SF1413-23a.pdf
189 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf
889 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_18_Injury_Illness_Questionaire.pdf
113 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_17_FL-55.pdf
392 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf
234 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_15_SARC.pdf
471 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_14_Proposal Certifications.pdf
406 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_13_CESHC.pdf
428 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_12_014100 Quality Requirements.pdf
166 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_11_013300 Submittals.pdf
146 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_10_013100 ESH Requirements.pdf
919 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_9_010010 General Requirements.pdf
337 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_8_FESHM 5034 Pressure Testing.pdf
512 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_7_ADDENDUM TO FESHM.pdf
174 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_6_5031_1 Piping Systems March 2025.pdf
1.5 MBAdded in Solicitation version 1Posted - Download
EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf
754 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf
343 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf
194 KBAdded in Solicitation version 1Posted - Download
EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf
320 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationCurrent
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
378854_MR
Archive Date
Dec 4, 2026
Office Address
Batavia, IL, 60510