GovChime
Notice ID: 091509b617f04f93bf3c3c5c10403af1Award NoticeAwardedArchived

Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado

Awarded on July 9, 2025. Full description on SAM.gov.

Awarded tounder 1240LT25C0008 (source: SAM.gov award notice)• $326.3K

Overview

Posted
July 10, 2025
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
212319: Other Crushed and Broken Stone Mining and Quarrying
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 8
Place of performance
Meeker, 81641
Last updated
Nov 10, 2026
First published
Last updated on SAM.gov
Award date
Jul 9, 2025
Award amount (SAM.gov award notice)
$326.3K

Identifiers

Solicitation number
1148809
Notice ID
091509b617f04f93bf3c3c5c10403af1
Award number (PIID)
1240LT25C0008

Description

ATTENTION: This presolicitation has been edited to change the NAICS Code from 212312 Crushed and Broken Limestone Mining and Quarrying to 212319 Other Crushed and Broken Stone Mining and Quarrying. PRESOLICITATION NOTICE ONLY, THIS IS NOT A SOLICITATION Project Title: Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado 1. Introduction. This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract. 2. Applicable North American Industry Classification System (NAICS) Code. The applicable NAICS CODE: 212319 Other Crushed and Broken Stone Mining and Quarrying Size Standard for NAICS: 550 Employees 3. Type of Contract to be Awarded. As a result of this presolicitation and possible solicitation, the Special Project Operations Center, Intermountain Branch, plans to award a firm fixed price contract. 4. Type of Solicitation. The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, Contracting by Negotiation . 5. Presolicitation Posting Period. This presolicitation will be posted for 16 days. 6. Contracting Office Points of Contact. Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov 7. Contract Description. This project consists of the following major items of work on the Blanco Ranger District: Mobilization Soil erosion and pollution control work. Drainage excavation on pit access road. Controlled rock blasting may be required for production and oversize material. Produce and stockpile aggregate surface course gradation (FSSS 703-3 Table). The Government estimates a swell factor of 30% (in-place to crushed), and loss factors of approximately 5% in stockpiling and 20% in crushing. The quantities shown in the schedule of items do not include losses for stockpiling and crushing and are final accepted material quantities. Approximately 24,000 cubic yards of surface course gradation (FSSS 703-3) aggregate may be ordered. Material will be produced and stockpiled using crushing and screening methods. Partial quantities from the base and/or option item(s) may be ordered. Controlled blasting is anticipated and may be required for production and oversize material. The quarry will be developed within the existing disturbance, and no new clearing or grubbing of vegetation is expected to take place for this work. Soil erosion and pollution control work will be performed. Two cross ditches with lead outs will be constructed on the pit access road. Rounding of cut slopes and final shaping of the pit area to drain shall be completed prior to final acceptance 8. Project Location. The Hiner Spring Quarry is located off Forest Road 601.1 (Blair Mountain), approximately 1.12 miles South-East from the intersection of Forest Road 245.1 (Buford New Castle). Latitude; 39.8374358, Longitude; -107.5649245 From New Castle, Colorado, turn North on 7th street and continue onto county road 245 for 29.1 miles. Turn Right onto Forest Road 601 towards Meadow Lake and continue for 1.3 miles and turn left onto the Hiner Spring Quarry access road. 9. Estimated Period of Performance. June 16, 2025, through October 15, 2025 10. Disclosure of Magnitude. The anticipated magnitude for this project is between $250,000 and $500,000. 11. Type of Set-aside. Total small business set-aside. 12. Responses. Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 16 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.

Full description on SAM.gov

Award Overview

Award Number

1240LT25C0008

Award Amount (SAM.gov award notice)

$326.3K

Award Date

Jul 9, 2025

Awardee

Awardee UEI

QWS8K71PEVJ5

Line Item Number

1240LT25C0008

Original Solicitation

Notice ID: 091509b617f04f93bf3c3c5c10403af1

Posted Date: Jul 10, 2025

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (9)

  • 1282B125R0024_A0001_S.pdf

    179 KBAdded in Solicitation version 5Posted
    Download
  • 1. Request for Proposal 1282B125R0024.pdf

    466 KBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 1 - Statement of Work - HinerSpringQuarry 2025.pdf

    294 KBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 2 - Schedule of Items.xlsx

    13 KBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 3 - Full Specs - HinerSpringQuarry 2025.pdf

    1.8 MBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 4 - Fire Plan - HinerSpringQuarry 2025.pdf

    135 KBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 5 - Plans - HinerSpringQuarry.pdf

    2.6 MBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 6 - QuarryPhotos - 20241010HinerSpring.pdf

    5.4 MBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT 7 - DBA Wage Determination Rio Blanco County Co.pdf

    2.7 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado

    Notice 05ab0fc875684d09a4008999b59a7a26 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado

    Notice 091509b617f04f93bf3c3c5c10403af1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1148809

Archive Date

Jul 24, 2025