GovChime
Notice ID: dd958c88cf5a43a3adcdfff9a9e552f1Combined Synopsis/Solicitation

UAS Components

Responses closed . Full description on SAM.gov.

Overview

Response deadline
10:00 AM EDT
Posted
April 29, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
336411: Aircraft Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
Place of performance
FT Hood, TX, 76544
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911S226U3129
Notice ID
dd958c88cf5a43a3adcdfff9a9e552f1

Description

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationCurrent

    UAS Components

    Notice dd958c88cf5a43a3adcdfff9a9e552f1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
amended to add set aside code and extend for a day for change. AstroMax UAS - Proposed UAS platforms must be listed on the DCMA-maintained Blue UAS Cleared List (or Blue UAS Select List) at the time of proposal submission. Offerors shall provide documentation confirming authorized reseller status or manufacturer direct listing on the current, approved list found at https://bluelist.dcma.mil/. Submission Method: Only bids submitted through the official solicitation portal will be accepted. Emailed submissions will not be considered. Brand Name or Equal: This solicitation is brand name or equal. If quoting an equal product, the bidder must demonstrate that the product meets or exceeds all salient physical, functional, or performance characteristics listed in the description.Mandatory Documentation: A completed Buy American form is required. Bids submitted without a completed form may be deemed non-responsive and rejected.Shipping and Invoicing: Prices must include all shipping, packaging, and inspection charges. A single shipment and invoice are required. Multiple shipments require prior written approval from the WDTC S2P2 Point of Contact (POC).
100%
Combined Synopsis09/11/2026
Purpose of this modification is to change the Subject to UAS components / 3D printers. 1st PSYOP Battalion requests the following equipment to establish an organic production capability for future training.
100%
Combined Synopsis05/08/2026
Drone components
100%
Combined Synopsis03/13/2026
Reason for update is to reduce the quantity FPV goggles and FPV controllers from qty 05 to qty 04 and clin 001 from qty 15 to qty 14. UAS FPV Drones and equipment
100%
Combined Synopsis01/29/2026
Unmanned Aerial System (UAS) with Aerial IgnitionCapabilities1. Scope and Objective The purpose of this solicitation is to procure a commercial-off-the-shelf (COTS) Unmanned Aerial System (UAS) equipped with an aerial ignition payload system, thermal and optical sensors, and required support equipment. The system will primarily be used for forestry, land management, and controlled burn operations. 2.Regulatory and Compliance Requirements To be considered for award, the proposed system MUST meet the following compliance standards: NDAA / Buy American Compliance: The UAS and all associated components (including sensors and payloads)must be fully compliant with Section 848 of the National Defense Authorization Act(NDAA) and the Buy American Act. DIU Blue UAS Cleared List Status: The bidder MUST explicitly state in their proposal/quote whether the proposed UAS platform is currently listed on the Defense Innovation Unit (DIU) Blue UAS Cleared List. This status is a critical factor for agency procurement routing and must be verified by the vendor. FAA Regulations: The system must comply with current Federal Aviation Administration(FAA)regulations for public or civil aircraft operations. 3. Minimum Technical Specifications 3.1.Flight Performance and Payload Flight Time: The UAS must be capable of a minimum 55-minute flight time without a payload. When carrying a heavy payload (up to 35 lbs.), it must maintain a flight time of at least 10 minutes. While operating the aerial ignition payload, flight time must be at least 22 to 30 minutes. Payload Capacity: Must each have a minimum payload capacity of 35 lbs. Range: Must support a communication range of up to 5kilometers with a clear line of sight from the controller to the aircraft. Deployment: The system must be capable of being assembled and ready for flight within 5minutes. 3.2.Environmental and Durability Temperature Range: Must be fully operable in temperatures ranging from 40 degrees Fahrenheit to 105 degrees Fahrenheit. Wind Resistance: Must be 1 each capable of stable flight in winds up to 15 meters per second. Humidity: Must be capable of operating in up to 90 percent non-condensing humidity. 3.3.Aerial Ignition System Payload Functionality: Must feature a payload capable of carrying, accurately delivering ,and dropping ignition spheres. Safety Features: Must include are mote emergency release system to physically drop or jettison the ignition payload in the event of a hung sphere to prevent damage or fire to the UAS. Must feature geo-fencing capabilities to prevent ignition spheres from being dropped outside of designated burn areas. Must include onboard sensors to detect obstructions, internal resistance, and temperature anomalies within the payload. 3.4. Sensors and Imaging Thermal Imaging: Must include a radio metric thermal camera with a minimum resolution of 640 x 512 pixel sat 30Hz. Optical Camera: Must include a Full HD visual camera with at least a 10x optical zoom capability. Multispectral Capabilities (Optional or Priced Separately): Ability to integrate multi spectral sensors (such as high-resolution panchromatic sensor, integrated thermal imager, and multiple spectral bands). 3.5. Navigation, Data, and Control Navigation: Must utilize high-precision GPS (centimeter-level accuracy, such as F9P or equivalent). Autonomy: Must support both manual flight via controller and autonomous flight missions using pre-programmed waypoints. Data Transmission: All real-time data transmission must been crypted over a 2.4Ghz frequency. Software Integration: Mission planning software must allow the importation of burn plans and maps in standard geo-referenced formats (such as PDFs, KMZs). 4. Required Equipment and Deliverables The vendor shall provide a complete, ready-to-fly package that includes, at a minimum: 1xNDAA-Compliant, DIU Blue UAS Cleared (or verified equivalent) UAS Platform 1xAerial Ignition Payload System 1x Ground Control Station (GCS) / Controller 1x Therma land Optical Camera Package 4x Sets of Flight Batteries 2x Battery Chargers (Double charger kit preferred) 2xBattery Transport Cases Spare parts kit (including spare CW and CCW propellers) 5.Training, Maintenance, and Support Training: The vendor must provide a comprehensive training seminar (minimum 3 days) for up to five (5) personnel. Maintenance Documentation: Must include comprehensive maintenance and repair instructions. Extended Care / Support Plan: The vendor will provide an annual maintenance subscription or care plan that includes: Annual inspection and calibration (Clean and Check). Software updates. Discounts on expedited labor, parts, and repair shipping. Access to dedicated technical support.
87%
Combined Synopsis08/27/2026

Additional Details

Solicitation Number

W911S226U3129

Archive Date

Apr 29, 2027

Office Address

FORT DRUM, NY, 13602-5220