Notice ID: 23f290fe8bf5fc18663b0fe4150ec33aPresolicitation
R--RFP for Waste Isolation Pilot Plant Management and Operation
Archived on September 16, 2011. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- August 9, 2011
- Notice type
- Presolicitation
- NAICS
- 561210: Facilities Support Services
Notice details
- PSC
- R: SUPPORT SVCS (PROF, ADMIN, MGMT)
- Last updated
- Dec 3, 2025
Identifiers
- Solicitation number
- DE-SOL-0002555
- Notice ID
- 23f290fe8bf5fc18663b0fe4150ec33a
Description
The major purpose of this contract is to operate and maintain the Waste Isolation Pilot Plant (WIPP) and to implement the DOE?s National Transuranic Waste program (NTP). The overall mission of the WIPP and the National Transuranic Waste Program is to protect human health and the environment by safe management, retrieval, characterization, transportation, and disposal of approved wastes.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
William B. HENSLEY Bill.Hensley@emcbc.doe.gov
Documents
No documents available.
Lifecycle
Solicitation:
DE-SOL-0002555- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 7×Pre-SolicitationCurrentMar 17, 2011
R--RFP for Waste Isolation Pilot Plant Management and Operation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Hanford Mission Essential Services Contract (HMESC) Procurement May 4, 2018 The DOE EM has reviewed the industry feedback received for the alternate cost proposal/analysis method consideration under the RFP, Solicitation No. 89303318REM000007, for the HMESC procurement, and has determined to proceed with the alternate cost proposal/analysis method for the Final HMESC RFP, still anticipated to be released in the spring of 2018. DOE has also determined to proceed with the alternate cost proposal/analysis method model for the upcoming Central Plateau Cleanup Contract (CPCC) procurement. Please see the attached letter. March 1, 2018: The Contracting Officer's Organizational Conflicts of Interest (OCI) Final Analysis for the Hanford Mission Essential Services Contract is hereby posted. December 12, 2017: The DOE EM is continuing to explore alternative approaches to determine whether potential efficiencies exist for Offerors in preparation of proposals for the Hanford Mission Essential Services Contract (HMESC) procurement and/or future procurements, while also ensuring that DOE receives sufficient cost information to perform the required evaluation. Therefore DOE is providing Offerors with an alternate cost model for consideration and feedback. DOE requests that industry provide objective input (favorable comments, recommended changes, and non-favorable comments) on both cost models (cost model in Draft RFP and Alternate Cost Model) by January 19, 2018. DOE will analyze industry input, and take this into consideration for the final RFP. | - | Special Notice | Open |
| - | Solicitation | 11/30/2026 | |
In preparation for the upcoming Ft. Leonard Wood Job Order Contract (JOC) solicitation—with an anticipated award date of December 2027—the Department of Public Works (DPW) and MICC-IRC invite estimating software vendors to present their capabilities. The objective of the presentation is to identify estimating software solutions for consideration in the follow-on JOC requirement. Presentation Guidelines & Parameters: - Presenations are capped at 30 minutes per company - Required Content: Live software demonstration, pricing/fee structures, and a candid overview of product strengths and limitations (Pros/Cons) - Target Presentation Window: Week of 16 November 2026 (prior to the Thanksgiving holiday) Next Steps & Coordination MICC-IRC will coordinate directly with interested vendors to schedule specific presentation dates and times. Please stand by for further scheduling instructions. | - | Special Notice | Open |
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days. | - | Pre-Solicitation | 12/14/2026 |
SOLICITATION NUMBER: N6247326R0053 (PIEE Alias: N6247326R9953) PROJECT: NAWSCL Base Operations Support Contract (BOSC), AMENDMENT: 0004 This amendment extends the RFP deadline, provides Government RFI responses, revise solicitation attachments, advise offerors of forthcoming Section L and M revisions, add and delete FAR and DFARS clauses as shown in the attached amendment 0004. | - | Solicitation | 12/01/2026 |
Additional Details
Solicitation Number
DE-SOL-0002555
Archive Date
Sep 16, 2011