GovChime
Notice ID: cb37691946d0d339f9908f934962be2dAward NoticeAwarded

Adams Tap Control Building

Awarded on December 23, 2013. Full description on SAM.gov.

Awarded tounder DE-WA0001490 (source: SAM.gov award notice)• $224.5K

Overview

Posted
December 23, 2013
Notice type
Award Notice
NAICS
236210: Industrial Building Construction

Notice details

Place of performance
Cochise County, 85625
PSC
38: CONSTRUCT/MINE/EXCAVATE/HIGHWY EQPT
Last updated
Dec 3, 2025
Award date
Dec 23, 2013
Award amount (SAM.gov award notice)
$224.5K

Identifiers

Solicitation number
DE-SOL-0006306
Notice ID
cb37691946d0d339f9908f934962be2d
Award number (PIID)
DE-WA0001490

Description

This is a competitive 100% Small Business Set-aside Invitation for Bid (IFB). The acquisition is subject to the North American Industry Classification System (NAICS) code of 236210 with a size standard of $33.5 million. This project consists of furnishing all necessary labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary in the construction project. The principal components of work include providing a precast concrete control building; provide conduit and cable from control building location within Adams Substation to the cable vault room at Adams Tap; remove existing control building. This project is identified as Adams Tap Control Building. All work shall be in strict compliance with the specifications and drawings. The project magnitude is estimated between $250,000 to $500,000. Place of performance is Cochise County, AZ 85625. The solicitation, specifications and drawings, and any subsequent amendments will only be available in electronic format, downloadable from the internet free of charge. No CD-ROMS or hardcopy documents will be distributed. Interested parties can download the solicitation at http://www.fbo.gov on or about October 16, 2013. A firm-fixed price contract award is contemplated. Any questions shall be submitted in writing to Western Area Power Administration, Attn: Caroline Bachelier, Contract Specialist, P.O. Box 6457, Phoenix, AZ 85005 or email to bachelier@wapa.gov referencing the solicitation number and project name. No phone calls will be accepted. Note: Any prospective contractor must be registered in the System For Award Management (SAM) in order to be eligible for award (www.sam.gov). Ensure your Online Representation Certifications Application (ORCA) is current at http://www.bpn.gov/. It is important to read the solicitation COMPLETELY as there are DATES that MUST be met.

Full description on SAM.gov

Award Overview

Award Number

DE-WA0001490

Award Amount (SAM.gov award notice)

$224.5K

Award Date

Dec 23, 2013

Awardee

Awardee UEI

S53DRTGCDYB3

Original Solicitation

Notice ID: cb37691946d0d339f9908f934962be2d

Posted Date: Dec 23, 2013

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Caroline L Bachelier
Contract Specialist

Secondary Contact

Susan Ethridge
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:DE-SOL-0006306
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationOct 2, 2013

    Adams Tap Control Building

    Notice 6fefb57cdcb4c7818f8ff1930a06d592 on SAM.gov

  2. SolicitationNov 27, 2013

    Adams Tap Control Building

    Notice a996ec49285b8edb1106b198129a8eae on SAM.gov

  3. AwardedCurrentDec 23, 2013

    Adams Tap Control Building

    Notice cb37691946d0d339f9908f934962be2d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SOURCES SOUGHT SYNOPSIS Job Order Contract for Yuma Proving Ground This is a Sources Sought Synopsis (SSS) ONLY. This notice is issued solely for information and planning purposes – it does not constitute a Request for Quotation (RFQ), Invitation for Bid (IFB), or Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought synopsis. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. Not responding to this notice does not preclude participation in any future RFQ, IFB, or RFP, if any is issued. If a solicitation is released, it will be synopsized on the Government wide Point of Entry (GPE). It is the responsibility of potential offerors to monitor the GPE for additional information pertaining to this requirement. The GPE is located at https://sam.gov. The United States (U.S.) Government desires to procure a Job Order Contract (JOC) at Yuma Proving Ground, on a small business set-aside basis, provided 2 or more qualified small businesses respond to this sources sought synopsis with information sufficient to support a set-aside. Be advised that the U.S. Government will not be able to set aside this requirement if two (2) or more small businesses do not respond with information to support the set-aside. We encourage all small businesses, in all socioeconomic categories (including, 8(a) Business Development Program, Small Disadvantage Business, Historically Underutilized Business Zone, Service-Disabled Veteran-Owned, Women-Owned Small Business concerns), to identify their capabilities in meeting the requirement at a fair market price. BACKGROUND: A continuing need is anticipated for a job order contract at Yuma Proving Ground. Attached you will find the draft Statement of Work (SOW). The Government contract for these services was previously performed under contract W91151-21-D-0012. The Period of Performance ended 1 August 2026. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and construction services as defined in this SOW. The NAICS code for the requirement is 236220, Commercial and Institutional Building Construction with a corresponding size standard of $45 million. If your company believes a different NAICS code would better fit this requirement, please tell us your suggested NAICS and why it would better fit this requirement. The Contractor shall provide all supervision, labor, personnel, equipment, materials, and supplies, with the exception of Government Furnished Property (GFP), to perform activities under this Job Order Contract. PURPOSE OF THIS SOURCES SOUGHT: To request information on capabilities of potential offerors to provide the services described herein. Electronic submissions only: Responses are due no later than 13:00pm CDT on 30 November 2026 to facilitate planning and ensure maximum consideration. The email attachments cannot exceed 9 megabytes (MB) due to the Government’s email system restrictions. DO NOT SEND ZIPPED files as the Government’s network will remove all zipped files. Interested businesses should provide a brief capability statement package (limited to no more than 30 pages, single spaced, and 12 font size minimum) demonstrating specific capability in reference to this requirement. The Government prefers that your firm submits its response in Microsoft Word, Adobe Acrobat, or a combination of the two and the document(s) must be searchable. Include: Whether the experience has been as a prime contractor or subcontractor on similar requirements (include the services provided, the number of facilities involved, and any other relevant information you deem applicable). Email the capability package to: Marissa Joyner - Contract Specialist at email: Marissa.joyner.civ@army.mil and Andrew Graham - Contracting Officer at email: Andrew.s.graham6.civ@army.mil The email subject line should include: The Firm’s Name, “Response to the Sources Sought Synopsis for the JOC at Yuma Proving Ground, W5168W-26-R-A022". **Note: the location(s) and corresponding solicitation number that you are responding to must be identified on the subject line. In response to this sources sought, please provide: 1. A company’s profile must include: The name of the firm, point of contact, phone number, email address, number of employees, annual revenue history, CAGE code, and Unique Entity Identifier (UEI). number. Respondents must also indicate small business certification status, for example: Small Business (SB), Small Disadvantaged Business (SDB), 8(a), Economically Disadvantaged Woman Owned SB (EDWOSB), WOSB, HUBZone, or Service Disabled Veteran Owned SB (SDVOSB). 2. Respond to: What fundamental tasks you believe need to be performed to successfully accomplish the job order contract? In essence, what primary tasks should be used for determining minimum capability to provide these services? 3. Whether your firm is interested in competing for this requirement as a prime contractor. If you are subcontracting any of the services out, contemplating a Joint Venture, and/or creating a teaming arrangement, please provide the name of these companies and what work they will be performing, if available. Please provide your company’s specific experience in job order contracts and providing comparable services. Ensure the information is in sufficiently detailed regarding previous experience in managing job order contracts (indicate whether the experience has been as a prime contractor or subcontractor) on similar requirements (include the services provided, the number of facilities involved, and any other relevant information you deem applicable). If applicable, please provide the same experience information from any subcontracts, Joint Venture, and/or teaming partners you may propose with. 4. What percentage of work will be performed by the small business prime contractor and all similarly situated entity subcontractors? Note: In accordance with FAR 52.219-14 Limitations on Subcontracting (Oct 2022) and Class Deviation 2021-O0008, Revision 1 - Limitations on Subcontracting for Small Business (Feb 2023), for general construction under NAICS 236220, prime contractor and similarly situated subcontractors must perform at least 15% of the cost of the contract, excluding the cost of materials. 5. Type(s)/certifications(s) of proposed subcontractors (for example, SDB, 8(a), HUBZone, SDVOSB, or WOSB). 6. Information on the financial capacity of your business to meet financial obligations (i.e. payroll, payment of subcontractors, etc.). 7. How the Army can best structure these contract requirements to facilitate competition by and among small business concerns. 8. Identify any condition or action that may have the effect of unnecessarily restricting competition with respect to this acquisition. Please contact the MICC Advocate for Competition, Scott Kukes at email: scott.d.kukes.civ@army.mil or 210-466-3015, if you believe that this action is unreasonably restricting competition. Include the subject of the acquisition, this announcement, and the MICC POC information from the notice on https://sam.gov. Provide the specific aspects that unreasonably restrict competition and the rationale for such conclusion.
-Market Research11/30/2026
Amendment A06: 1. The purpose of this solicitation amendment A06 is to post update Drawings. 2. Attached are the updated Drawings, J03b iHouse Apt 02 Phase 4 IFC Drawings R2. 3. All other terms and conditions remain unchanged. Amendment A05: 1. The purpose of this solicitation amendment A05 is to (1) Post the remaining questions and answers (Q&As), (2) Post the iHouse Apt 02 Phase 4 Drawings, (3) post S124 iHouse. and (4) extend the offers due date. 2. Attached are the answers to the remaining questions received, iHouse Apt 02 Phase 4 Drawings, and S124 iHouse 3. The offers due date is extended to 12/01/2026. 4. All other terms and conditions remain unchanged. Amendment A04: 1. The purpose of this solicitation amendment A04 is to (1) Post the some of the remaining questions and answers (Q&As), (2) Post the final Geotech Report, and (3) extend the offers due date. 2. Attached are the answers to the some of the remaining questions received and attachment J01a GeoTech 10Sep2024. 3. The offers due date is extended to 11/12/2026. 4. The Government may provide updated attachments when the remaining Q&A’s are posted. 5. All other terms and conditions remain unchanged. Amendment A03: 1. The purpose of this solicitation amendment is to extend the offers due date. 2. It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/22/2026. 3. All other terms and conditions remain unchanged. Amendment A02: 1. The purpose of this solicitation amendment is to extend the offers due date. 2. It is taking longer than expected to respond to the questions received. The offers due date is extended to 10/08/2026. 3. All other terms and conditions remain unchanged. Amendment A01: 1. The purpose of this solicitation amendment A01 is to: a. Post questions and answers (Q&As), b. Post the site visit sign-in sheet, c. Post the Geotech Report, d. Update a clause, e. Extend the offers due date. 2. Attached are the questions received to this date with some answers. The Government is researching the rest of the questions and will post those answers soon. 3. Attached is the site visit sign-in sheet. 4. Attached is the Geotech Report. 5. HHSAR clause 352.223-70 Safety and Health is updated to the OCT 2026 version and the full text is provided at the end of this amendment. 6. The offers due date is extended to 09/24/2026. 7. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442. 8. All other terms and conditions remain unchanged. Request for Proposals 75H70126R00026 iHouse Apartment Construction Goal: The objective of this project is to adapt and construct a 19-unit apartment building to a new location while ensuring compliance with all applicable local building codes and regulations. Set-Aside: ISBEE set-aside. Product Service Code: Y1FA Construction Of Family Housing Facilities NAICS Code: 236220, Commercial and Institutional Building Construction with a size standard of $45M Location: Indian Rte 6290, Tonalea, AZ 86044 County: Coconino POP: 365 calendar days Construction Magnitude: Between $5,000,000 and $10,000,000 Contract Type: firm-fixed-priced TERO: TERO not is applicable.
-Solicitation12/01/2026
Cove Day School Replacement & Quarters Construction Project
-Solicitation12/03/2026
The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product..
-AwardedOpen
This project consists of providing all materials, equipment, labor, transportation, and incidentals for completion of the repair storm damage sustained on three buildings at this site. The repairs are to include roof replacement, dry wall and insulation replacement, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and to replace a portion of the side of the Chino Yard Office; to perform maintenance to the metal roofs on the Supervisor’s office and the Chino Shop; to repair window frames on upper windows, to caulk ALL of windows, and to install a Z bar at the roof line on the Supervisor’s Office; and to gutters and downspouts on the Chino Shop. This project could also include, if additional funds are available, optional bid items. The optional bid items are exterior painting on the Yard Office; replace the weather stripping on two garage doors and a door sweep on a manway; and if mold is found in the Supervisor’s Office to replace the dry wall and insulation.
-Combined Synopsis11/09/2026

Additional Details

Solicitation Number

DE-SOL-0006306

Archive Date

Jul 28, 2015