Notice ID: c5cac15ad7e9487f9334d9e157626567Award NoticeAwarded
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction
Awarded on September 14, 2016. Full description on SAM.gov.
Awarded tounder DTFH6116C00014 (source: SAM.gov award notice)• $342.9K
Overview
- Posted
- September 14, 2016
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 693JJ3 ACQUISITION AND GRANTS MGT
- PSC
- A: RESEARCH AND DEVELOPMENT
- Last updated
- Dec 6, 2025
- Award date
- Sep 14, 2016
- Award amount (SAM.gov award notice)
- $342.9K
Identifiers
- Solicitation number
- DTFH6116R00023
- Notice ID
- c5cac15ad7e9487f9334d9e157626567
- Award number (PIID)
- DTFH6116C00014
Description
ABC is defined as bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges quickly. Conventional construction methods involve onsite activities that are time consuming and weather dependent. Nevertheless, speed is the primary difference between ABC and conventional bridge construction, but ABC can introduce other unique challenges such as: shipping and handling of large/irregular prefabricated elements, special lifting/erecting and element "fit-up" in the field, all of which could have special QA requirements. There are three particular ABC technologies being promoted under EDC-2 which are: Prefabricated Bridge Elements and Systems (PBES), Slide-In Bridge Construction (SIBC), and Geosynthetic Reinforced Soil - Integrated Bridge System (GRS-IBS). ABC is a paradigm shift in the project planning and procurement approach where the need to minimize mobility impacts which occur due to onsite construction activities are elevated to a higher priority. Conventional bridge construction is bridge construction that does not significantly reduce the onsite construction time that is needed to build, replace, or rehabilitate a single, or group of bridge projects.
Award Overview
Award Number
DTFH6116C00014
Award Amount (SAM.gov award notice)
$342.9K
Award Date
Sep 14, 2016
Awardee
Original Solicitation
Notice ID: c5cac15ad7e9487f9334d9e157626567
Posted Date: Sep 14, 2016
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $10.0KSigned Oct 29, 2026
- —Signed Jul 1, 2025
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6116R00023- Pre-Solicitation
- Combined Synopsis
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJun 1, 2016
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction
- 4×Combined SynopsisJun 7, 2016
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction
- AwardedCurrentSep 14, 2016
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6116R00023
Archive Date
Sep 29, 2016