Notice ID: 0062debd8bbdb95a008849e26f4025a3Award NoticeAwarded
AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona
Awarded on July 24, 2009. Full description on SAM.gov.
Awarded tounder DTFH68-09-C-00032 (source: SAM.gov award notice)• $1.2M
Overview
- Posted
- July 28, 2009
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Coronado National Forest, TUCSON
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
- Award date
- Jul 24, 2009
- Award amount (SAM.gov award notice)
- $1.2M
Identifiers
- Solicitation number
- DTFH68-09-B-00028
- Notice ID
- 0062debd8bbdb95a008849e26f4025a3
- Award number (PIID)
- DTFH68-09-C-00032
Description
PROJECT DETAILS: The project is located approximately 15 miles northeast of Tucson, AZ on Arizona Forest highway 39, know locally as the Mt Lemmon Highway. Project length is 0.06 miles. Work includes spot repairs at two locations. Site MP 9.8 includes constructing a new 60 ft bridge with pre-stressed concrete box beams; asphalt paved ditch and shotcrete waterway; class 6 riprap; 15” and 5” concrete curb; and guardrail replacement. There is approximately 1700 yd3 of roadway excavation, probably requiring controlled blasting techniques. The existing MSE wall will need to be repaired or removed as necessary to construct the bridge. Some of the existing temporary fix of soil nails and shotcrete will need to be removed as well. MP 10.5 work includes a 42” culvert removal and replacement with a 42” culvert and concrete inlet; class 5 riprap; 5” concrete curb; remove and reset guardrail; and MSE wall removal and reconstruction as necessary to install new culvert. The estimated cost is $ 1 to 2 million and we expect construction work to start early September 2009 and finish around February 2010. There are possible Mexican Spotted owls & Peregrine Falcons nesting within the project limits that will restrict construction activities. This is a difficult construction project in a short construction season located in very steep and rocky terrain. No formal detailed road closures, except for 30 minute delays, will be in effect as all construction activities will require maintaining existing traffic flow.
Award Overview
Award Number
DTFH68-09-C-00032
Award Amount (SAM.gov award notice)
$1.2M
Award Date
Jul 24, 2009
Awardee
Original Solicitation
Notice ID: 0062debd8bbdb95a008849e26f4025a3
Posted Date: Jul 28, 2009
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
DTFH68-09-B-00028- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 4×Pre-SolicitationMay 26, 2009
AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona
- SolicitationJul 6, 2009
AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona
- AwardedCurrentJul 28, 2009
AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH68-09-B-00028
Archive Date
Sep 10, 2009
Office Address