GovChime
Notice ID: 0062debd8bbdb95a008849e26f4025a3Award NoticeAwarded

AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona

Awarded on July 24, 2009. Full description on SAM.gov.

Awarded tounder DTFH68-09-C-00032 (source: SAM.gov award notice)• $1.2M

Overview

Posted
July 28, 2009
Notice type
Award Notice
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Coronado National Forest, TUCSON
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 25, 2026
Award date
Jul 24, 2009
Award amount (SAM.gov award notice)
$1.2M

Identifiers

Solicitation number
DTFH68-09-B-00028
Notice ID
0062debd8bbdb95a008849e26f4025a3
Award number (PIID)
DTFH68-09-C-00032

Description

PROJECT DETAILS: The project is located approximately 15 miles northeast of Tucson, AZ on Arizona Forest highway 39, know locally as the Mt Lemmon Highway. Project length is 0.06 miles. Work includes spot repairs at two locations. Site MP 9.8 includes constructing a new 60 ft bridge with pre-stressed concrete box beams; asphalt paved ditch and shotcrete waterway; class 6 riprap; 15” and 5” concrete curb; and guardrail replacement. There is approximately 1700 yd3 of roadway excavation, probably requiring controlled blasting techniques. The existing MSE wall will need to be repaired or removed as necessary to construct the bridge. Some of the existing temporary fix of soil nails and shotcrete will need to be removed as well. MP 10.5 work includes a 42” culvert removal and replacement with a 42” culvert and concrete inlet; class 5 riprap; 5” concrete curb; remove and reset guardrail; and MSE wall removal and reconstruction as necessary to install new culvert. The estimated cost is $ 1 to 2 million and we expect construction work to start early September 2009 and finish around February 2010. There are possible Mexican Spotted owls & Peregrine Falcons nesting within the project limits that will restrict construction activities. This is a difficult construction project in a short construction season located in very steep and rocky terrain. No formal detailed road closures, except for 30 minute delays, will be in effect as all construction activities will require maintaining existing traffic flow.

Full description on SAM.gov

Award Overview

Award Number

DTFH68-09-C-00032

Award Amount (SAM.gov award notice)

$1.2M

Award Date

Jul 24, 2009

Awardee

Original Solicitation

Notice ID: 0062debd8bbdb95a008849e26f4025a3

Posted Date: Jul 28, 2009

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Brenda J McGehee
Contract Specialist
Fax: 720-963-3360

Secondary Contact

Tiffany C Atchison
Contract Specialist
Fax: 720-963-3360

Documents

No documents available.

Lifecycle

Solicitation:DTFH68-09-B-00028
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 4×
    Pre-SolicitationMay 26, 2009

    AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona

    Notice dbbd4bcf5078140515d53a7e11bdbca2 on SAM.gov

  2. SolicitationJul 6, 2009

    AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona

    Notice 0bfc184d8005c000f11ae64a58a89228 on SAM.gov

  3. AwardedCurrentJul 28, 2009

    AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona

    Notice 0062debd8bbdb95a008849e26f4025a3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

DTFH68-09-B-00028

Archive Date

Sep 10, 2009

Office Address

LAKEWOOD, CO, 80228