Notice ID: 58f5756c834a572b2c0b352539af53a0Award NoticeAwarded
CO FLAP 1099(1) - Lake Pueblo Road & Trail Improvements
Awarded on October 13, 2015. Full description on SAM.gov.
Awarded tounder DTFH6816C00002 (source: SAM.gov award notice)• $9.5M
Overview
- Posted
- October 13, 2015
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Lake Pueblo, Pueblo, 81005
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Oct 13, 2015
- Award amount (SAM.gov award notice)
- $9.5M
Identifiers
- Solicitation number
- DTFH6815B00019
- Notice ID
- 58f5756c834a572b2c0b352539af53a0
- Award number (PIID)
- DTFH6816C00002
Description
THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT DESCRIPTION: This project is located in Lake Pueblo State Park, Pueblo, Colorado. The project totals 6.41 miles roadway rehabilitation, 13 miles of trail rehabilitation, and two prefabricated bridges. The project consists of minor grading, drainage reconstruction, asphalt pavement pulverization and rehabilitation, asphalt pavement, concrete pavement, signing, striping, new guardrail, new refabricated pedestrian bridges, and concrete roadway bridge rail replacements. Type of Construction: minor widening, asphalt pulverization, minor grading, drainage, aggregate base, asphalt paving, concrete paving, prefabricated pedestrian bridge construction, erosion control, signing and striping, and temporary traffic control. This project consists of: Schedule A: Minor Widening, Pulverization and paving 3.2 miles of Juniper Road and 13 miles of pedestrian trails, bridge rail construction and pedestrian bridge construction Significant Items for Schedule A Include Approximately: 10,500 LNFT of silt fence; 9,100 LF of sediment logs; removal of 7,600 LNFT of guardrail; 125 Sqyd of bridge deck removal; 8,500 CY of roadway excavation; 1200 CY of waste; 105,000 SQYD of asphalt pulverization; 30,000 tons of roadway aggregate; 17,000 tons of superpave asphalt paving; 53,000 SQYD of 5" thick concrete pavement; 2 prefabricated 120' steel bridges; 110 CY of structural concrete; 225 LNFT of concrete bridge rail; 325 LNFT of pipe culvert placement; 4,600 LNFT of concrete curb; 6,000 LNFTof guardrail; 10,000 SQYD of rolled erosion control product; 80,000 LNFT of epoxy pavement markings; 1200 flagger hours. Option X: Minor widening, subexcavation, bridge rehabilitation, pulverization and paving of 1.2 miles of Juniper Road and North Marina Road. Significant Items for Option X include Approximately: 1300 CY of Roadway excavation; 4,000 tons of roadway aggregate; 20,000 SQYD of asphalt pulverization; 8,000 tons of superpave asphalt paving; 200 LNFT of concrete curb; 425 LNFT of guardrail; 100 LNFT of concrete bridge rail; 34,000 LNFT of epoxy pavement markings; 1000 flagger hours. Option Y: Minor Widening, Pulverization and paving 0.65 miles of Reservoir Road. Significant Items for Option Y include Approximately: 9,500 SQYD of asphalt pavement pulverization; 1,400 tons of roadway aggregate; 4,000 tons of superpave asphalt paving; 13,800 LNFT of epoxy pavement markings. Option Z: Pulverization and paving 0.95 miles of South Marina Road and Juniper Road. Significant Items for Option Z include Approximately: 14,000 SQYD of asphalt pavement pulverization; 1,400 tons of roadway aggregate; 4,000 tons of superpave asphalt paving; 20,000 LNFT of epoxy pavement markings. The contracting range for Schedule A and all Options is $8,000,000 to $12,000,000.
Award Overview
Award Number
DTFH6816C00002
Award Amount (SAM.gov award notice)
$9.5M
Award Date
Oct 13, 2015
Awardee
Awardee UEI
K97MF3JKN7R4
Original Solicitation
Notice ID: 58f5756c834a572b2c0b352539af53a0
Posted Date: Oct 13, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6815B00019- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 8×Pre-SolicitationAug 14, 2015
CO FLAP 1099(1) - Lake Pueblo Road & Trail Improvements
- SolicitationOct 6, 2015
CO FLAP 1099(1) - Lake Pueblo Road & Trail Improvements
- AwardedCurrentOct 13, 2015
CO FLAP 1099(1) - Lake Pueblo Road & Trail Improvements
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6815B00019
Archive Date
Nov 5, 2015