Notice ID: 38d8b2e95276ec710b22f398453e1d50Award NoticeAwarded
KS FLAP CR1200, Pleasanton East Lake Bridge
Awarded on May 4, 2016. Full description on SAM.gov.
Awarded tounder DTFH6816C00023 (source: SAM.gov award notice)• $448.6K
Overview
- Posted
- May 26, 2016
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Pleasanton, 66075
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- May 4, 2016
- Award amount (SAM.gov award notice)
- $448.6K
Identifiers
- Solicitation number
- DTFH6815R00020
- Notice ID
- 38d8b2e95276ec710b22f398453e1d50
- Award number (PIID)
- DTFH6816C00023
Description
The Pleasanton East Lake Spillway project is located near the Marais des Cygnes National Wildlife Refuge near Pleasanton Kansas along KS Hwy 52. This project is generally described as improving 825 feet of County Road 1200 and replacing the Pleasanton City Lake East low-water crossing that runs through the spillway. The existing spillway is a concrete slab low-water crossing / ford that is deteriorating and has created hazards to drivers. The road drops abruptly from each approach, presenting hidden and unexpected conditions and potential threats to vehicular control. The intent of the project is to raise the road out of the water and above the average high water mark and provide a dry driving surface by installing nine precast 10 foot x 5 foot reinforced concrete box culverts; installing 210 LnFt of Type 2, class A, Guardrail system mounted on the CBC roadway. Project will include the removal of 820 SQYD of concrete pavement, 1000 CUYD of embankment construction, placing of 120 CUYD of class3 Riprap, and the necessary clearing and grubbing, erosion control and seed and mulching. Approximately 1,320 feet of 1200th Road at the site will be raised approximately 7 feet to increase design speeds and sight distance. Anticipated start date is July 16, 2016 and should be completed by August 20, 2016.
Award Overview
Award Number
DTFH6816C00023
Award Amount (SAM.gov award notice)
$448.6K
Award Date
May 4, 2016
Awardee
Original Solicitation
Notice ID: 38d8b2e95276ec710b22f398453e1d50
Posted Date: May 26, 2016
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Select documents to download
Showing 9 of 9 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | May 26, 2016 | - |
Lifecycle
Solicitation:
DTFH6815R00020- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 8×Pre-SolicitationJan 26, 2016
KS FLAP CR1200, Pleasanton East Lake Bridge
- SolicitationApr 29, 2016
KS FLAP CR1200, Pleasanton East Lake Bridge
- AwardedCurrentMay 26, 2016
KS FLAP CR1200, Pleasanton East Lake Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6815R00020
Archive Date
Jun 15, 2016