Notice ID: 45279c919a4014ccfe0c5d5a0c2ec9f1Award NoticeAwarded
AZ FLAP 89(1) Flagstaff-Vista Overlook
Awarded on January 11, 2016. Full description on SAM.gov.
Awarded tounder DTFH6816C00011 (source: SAM.gov award notice)• $16.1M
Overview
- Posted
- January 12, 2016
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Coconino National Forest, Coconino County
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Jan 11, 2016
- Award amount (SAM.gov award notice)
- $16.1M
Identifiers
- Solicitation number
- DTFH6816B00002
- Notice ID
- 45279c919a4014ccfe0c5d5a0c2ec9f1
- Award number (PIID)
- DTFH6816C00011
Description
IFB: AZ FLAP 89(1), Flagstaff - Vista Overlook Arizona FLAP Reconstruction Project Project Details: This project provides 4R improvements of State Route 89A for up to 8.3 miles ofroadway between Flagstaff on the north end and the Vista Overlook at the rim of the Oak Creek Canyon on the south. The work consists of realignment of the roadway; adding full width shoulders; adding accel and decal lanes; widened drainage structures; climbing lanes and overall safety improvements such as guardrail, slope flattening, profile changes for sight distance improvements and improved signing and striping. The Project is broken into two schedules to accommodate funding scenarios. One schedule covers 7.2 miles of reconstruction and ties the improvements back in to the existing alignment prior to the urbanized section on the north end of the route. The 8.3 mile schedule covers improvements for the entire route. Schedule A includes: Roadway excavation at approximately 208,000 CY; Aggregate Base Course at 173,500 tons; Riprap Class 2 at 950 CY; Riprap Class 3 at 150 CY; Riprap Class 4 at 310 CY; Superpave " , " nominal aggregate at 72,500 Tons; 24 inch Pipe Culvert at 3,560 LF; 30 inch Culvert Pipe at 295 LF; 36 inch Culvert Pipe at 815 LF; 42 inch Culvert Pipe at 940 LF; Open Graded Friction Course at 5,600 Tons and Place Conserved Topsoil at 153,700 Tons. Schedule B includes: Roadway excavation at approximately 228,000 CY; Aggregate Base Course at 191,000 tons; Riprap Class 2 at 950 CY; Riprap Class 3 at 180 CY; Riprap Class 4 at 310 CY; Superpave " , " nominal aggregate at 81,500 Tons; 24 inch Pipe Culvert at 3,670 LF; 30 inch Pipe Culvert at 565 LF; 36 inch Pipe Culvert at 815 LF; 42 inch Culvert Pipe at 940 LF; Open Graded Friction Course at 6,300 Tons and Place Conserved Topsoil at 163,500 Tons. Construction is expected to occur from January 2016 through December 2017. The contract range for this project is between $20 and $25 million.
Award Overview
Award Number
DTFH6816C00011
Award Amount (SAM.gov award notice)
$16.1M
Award Date
Jan 11, 2016
Awardee
Awardee UEI
HYLECVGG3VP7
Original Solicitation
Notice ID: 45279c919a4014ccfe0c5d5a0c2ec9f1
Posted Date: Jan 12, 2016
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Megan M. Mavis
Documents
Select documents to download
Showing 10 of 16 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jan 12, 2016 | - |
Showing 1 to 10 of 16 results
Lifecycle
Solicitation:
DTFH6816B00002- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationOct 26, 2015
AZ FLAP 89(1) Flagstaff-Vista Overlook
- SolicitationJan 5, 2016
AZ FLAP 89(1) Flagstaff-Vista Overlook
- AwardedCurrentJan 12, 2016
AZ FLAP 89(1) Flagstaff-Vista Overlook
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6816B00002
Archive Date
Jan 26, 2016