GovChime
Notice ID: 45279c919a4014ccfe0c5d5a0c2ec9f1Award NoticeAwarded

AZ FLAP 89(1) Flagstaff-Vista Overlook

Awarded on January 11, 2016. Full description on SAM.gov.

Awarded tounder DTFH6816C00011 (source: SAM.gov award notice)• $16.1M

Overview

Posted
January 12, 2016
Notice type
Award Notice
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Coconino National Forest, Coconino County
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Jan 11, 2016
Award amount (SAM.gov award notice)
$16.1M

Identifiers

Solicitation number
DTFH6816B00002
Notice ID
45279c919a4014ccfe0c5d5a0c2ec9f1
Award number (PIID)
DTFH6816C00011

Description

IFB: AZ FLAP 89(1), Flagstaff - Vista Overlook Arizona FLAP Reconstruction Project Project Details: This project provides 4R improvements of State Route 89A for up to 8.3 miles ofroadway between Flagstaff on the north end and the Vista Overlook at the rim of the Oak Creek Canyon on the south. The work consists of realignment of the roadway; adding full width shoulders; adding accel and decal lanes; widened drainage structures; climbing lanes and overall safety improvements such as guardrail, slope flattening, profile changes for sight distance improvements and improved signing and striping. The Project is broken into two schedules to accommodate funding scenarios. One schedule covers 7.2 miles of reconstruction and ties the improvements back in to the existing alignment prior to the urbanized section on the north end of the route. The 8.3 mile schedule covers improvements for the entire route. Schedule A includes: Roadway excavation at approximately 208,000 CY; Aggregate Base Course at 173,500 tons; Riprap Class 2 at 950 CY; Riprap Class 3 at 150 CY; Riprap Class 4 at 310 CY; Superpave " , " nominal aggregate at 72,500 Tons; 24 inch Pipe Culvert at 3,560 LF; 30 inch Culvert Pipe at 295 LF; 36 inch Culvert Pipe at 815 LF; 42 inch Culvert Pipe at 940 LF; Open Graded Friction Course at 5,600 Tons and Place Conserved Topsoil at 153,700 Tons. Schedule B includes: Roadway excavation at approximately 228,000 CY; Aggregate Base Course at 191,000 tons; Riprap Class 2 at 950 CY; Riprap Class 3 at 180 CY; Riprap Class 4 at 310 CY; Superpave " , " nominal aggregate at 81,500 Tons; 24 inch Pipe Culvert at 3,670 LF; 30 inch Pipe Culvert at 565 LF; 36 inch Pipe Culvert at 815 LF; 42 inch Culvert Pipe at 940 LF; Open Graded Friction Course at 6,300 Tons and Place Conserved Topsoil at 163,500 Tons. Construction is expected to occur from January 2016 through December 2017. The contract range for this project is between $20 and $25 million.

Full description on SAM.gov

Award Overview

Award Number

DTFH6816C00011

Award Amount (SAM.gov award notice)

$16.1M

Award Date

Jan 11, 2016

Awardee

Awardee UEI

HYLECVGG3VP7

Original Solicitation

Notice ID: 45279c919a4014ccfe0c5d5a0c2ec9f1

Posted Date: Jan 12, 2016

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Megan M. Mavis

Documents

Select documents to download

Showing 10 of 16 items

Document
Source
Agency
Posted Date
File Size
Actions
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONJan 12, 2016-

Showing 1 to 10 of 16 results

Lifecycle

Solicitation:DTFH6816B00002
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 6×
    Pre-SolicitationOct 26, 2015

    AZ FLAP 89(1) Flagstaff-Vista Overlook

    Notice 4ef3a465393f61196c62fc0efddc18ee on SAM.gov

  2. SolicitationJan 5, 2016

    AZ FLAP 89(1) Flagstaff-Vista Overlook

    Notice 44e2228653c7b30e9c575c6a52385c0d on SAM.gov

  3. AwardedCurrentJan 12, 2016

    AZ FLAP 89(1) Flagstaff-Vista Overlook

    Notice 45279c919a4014ccfe0c5d5a0c2ec9f1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

DTFH6816B00002

Archive Date

Jan 26, 2016