GovChime
Notice ID: 764e26a452757b53a2e9c289d138134fAward NoticeAwarded

CA HBP TRI CR104(1), Trinity County Bridges Design Build

Awarded on November 3, 2016. Full description on SAM.gov.

Awarded tounder DTFH6817C00003 (source: SAM.gov award notice)• $6.7M

Overview

Posted
November 15, 2016
Notice type
Award Notice
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Trinity County near Weaverville, CA, Weaverville, 96093
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Nov 3, 2016
Award amount (SAM.gov award notice)
$6.7M

Identifiers

Solicitation number
DTFH6816R00005
Notice ID
764e26a452757b53a2e9c289d138134f
Award number (PIID)
DTFH6817C00003

Description

THIS IS NOT A ADVERTISEMENT. THIS PRESOLICITATION SERVES AS NOTICE THAT A ADVERTISEMENT IS IMMINENT IN THE NEXT FEW WEEKS. This project is for Design-Build services for the design, demolition, and construction of five bridges in Trinity County, CA. The existing structures are single span, with lengths ranging from approximately 37 feet to 60 feet and widths ranging from approximately 13 feet to 17 feet. The bridges are separated geographically from each other with nearly 100-miles between the most southern site to the most northern sites. All five locations are on rural, mountainous roads. Bridge ID Road Name Waterway Approximate Latitude/Longitude 5C-048 Coffee Creek Road Coffee Creek 41d07'06"N 122d53'40"W 5C-061 Ramshorn Road Mumbo Creek 41d08'16"N 122d34'11"W 5C-157 East Fork Hayfork Road North Fork East Fork Hayfork Creek 40d30'35"N 122d59'58"W 5C-187 Jordan Road Little Creek 40d37'33"N 122d57'38"W 5C-196 Coffee Creek Road Adams Creek 41d07'19"N 122d55'25"W The Design-Build contract would be for professional engineering, right-of-way acquisition, utility relocation, permitting (Clean Water Act Sections 401, 402, and 404; Encroachment Permits; etc), and construction services. The proposed structures are to: Be open bottom; and Span the waterways and convey the design-year storm event; Four structures are to be single lane. One is to be double lane (one lane in each direction). Up to 400 feet of roadway approach work is anticipated on either side of each structure. This work may include excavation, embankment, placing aggregate surface, and some minor asphalt pavement. ENGINEER'S ESTIMATE: The design, construction, and Right-of-Way/access costs for the Project is estimated to be between $4,000,000 and $6,000,000. SCHEDULE: The Design-Build solicitation will be done in two phases. A Request for Qualifications is anticipated to be available in April 2016. An optional site visit will be held during Phase 1 to allow proposers to view all accessible bridge sites. Based on current snow pack, only the Mumbo Creek bridge is inaccessible, however conditions may change. Interested parties will meet at the Little Creek Bridge at 8 A.M. on April 20, 2016. Each Proposer will provide their own transportation to review the sites, which is anticipated to take nearly 10 hours to complete, and include nearly 230 miles of driving in potentially inclement weather. Four-wheel drive capable vehicles required. Due to limited space at the project sites, each proposer team should consolidate into one vehicle. Questions will be addressed at each of the bridge sites, however there will be no summary of the site visit for those who do not participate. At least three firms will be short-listed. A Request-for-Proposals will be sent to the short-listed firms in or around June 2016. Award of contract is anticipated to be in or around August to October 2016. Completion of the Design-Build contract (engineering, right-of-way acquisition, permitting, and construction) is anticipated to be in 2017.

Full description on SAM.gov

Award Overview

Award Number

DTFH6817C00003

Award Amount (SAM.gov award notice)

$6.7M

Award Date

Nov 3, 2016

Awardee

Awardee UEI

MCTKNNEWNHK7

Awardee CAGE Code

4VH27

Original Solicitation

Notice ID: 764e26a452757b53a2e9c289d138134f

Posted Date: Nov 15, 2016

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 15, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 15, 2016-
PresolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 15, 2016-
SolicitationFEDERAL HIGHWAY ADMINISTRATIONNov 15, 2016-

Lifecycle

Solicitation:DTFH6816R00005
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 4×
    Pre-SolicitationMar 29, 2016

    CA HBP TRI CR104(1), Trinity County Bridges Design Build

    Notice 8a66324d674cd258ff6be5eb8edfd83f on SAM.gov

  2. SolicitationMay 5, 2016

    CA HBP TRI CR104(1), Trinity County Bridges Design Build

    Notice df825c33d5f79ed4557af9d1c971b82e on SAM.gov

  3. AwardedCurrentNov 15, 2016

    CA HBP TRI CR104(1), Trinity County Bridges Design Build

    Notice 764e26a452757b53a2e9c289d138134f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

DTFH6816R00005

Archive Date

Nov 18, 2016