Notice ID: 8bed5cd680bb73f9650082a0e02ef1baAward NoticeAwarded
CA FTNP SEKI 10(10) Generals Highway
Awarded on May 15, 2017. Full description on SAM.gov.
Awarded tounder DTFH6817C00019 (source: SAM.gov award notice)• $10.9M
Overview
- Posted
- May 23, 2017
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Sequoia / Kings Canyon National Park Tulare County, 93262
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- May 15, 2017
- Award amount (SAM.gov award notice)
- $10.9M
Identifiers
- Solicitation number
- DTFH6817B00007
- Notice ID
- 8bed5cd680bb73f9650082a0e02ef1ba
- Award number (PIID)
- DTFH6817C00019
Description
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS MARCH 29th, AND WILL BE ADVERTISED ON A FULL AND OPEN BASIS CA FTNP SEKI 10(10) Generals Highway Project Description: This project consists of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.4 miles of roadway within Sequoia and Kings Canyon National Park, Tulare County, California. 0.96 miles of Generals Highway will be reconstructed from Deer Ridge to Eleven Range and 1.4 miles of Wolverton Road including the parking lot will be rehabilitated under this project. The terrain is mountainous with the elevation for the Generals Highway work ranging between 4,500 and 5,500 feet and Wolverton Road work ranging between 6,900 and 7,300 feet. The estimated price range is between $8,000,000 and $12,000,000. The anticipated advertisement date is March 2017 with construction anticipated from May 2017 to October 2018. Principle work items include (estimated): 9,800 square feet of reinforced concrete retaining wall (4 feet to 14 feet high), 9,100 tons of asphalt concrete pavement, 1,700 linear feet of steel bridge rail, 200 cubic yards of structural concrete, 4,600 tons of aggregate base, 3,900 cubic yards of roadway excavation and 4,900 cubic yards of waste, 6,100 linear feet of concrete curb, and 600 linear feet of micropiles All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.
Award Overview
Award Number
DTFH6817C00019
Award Amount (SAM.gov award notice)
$10.9M
Award Date
May 15, 2017
Awardee
Awardee UEI
NHPAHL1CNS21
Original Solicitation
Notice ID: 8bed5cd680bb73f9650082a0e02ef1ba
Posted Date: May 23, 2017
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Jeremiah Rogers
Contracting Officer
Secondary Contact
Joe Wilson
Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6817B00007- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 7×Pre-SolicitationMar 14, 2017
CA FTNP SEKI 10(10) Generals Highway
- SolicitationMay 4, 2017
CA FTNP SEKI 10(10) Generals Highway
- AwardedCurrentMay 23, 2017
CA FTNP SEKI 10(10) Generals Highway
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6817B00007
Archive Date
Jun 8, 2017