Notice ID: 90672d9e556ff5eec3144698c38df248Solicitation
CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge
Archived on December 15, 2017. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- October 31, 2017
- Notice type
- Solicitation
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Arapaho & Roosevelt National Forest , Boulder County, CO
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- DTFH6817B00019
- Notice ID
- 90672d9e556ff5eec3144698c38df248
Description
PROJECT DETAILS: CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado. This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge. The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge. Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control. This project consists of: Schedule A: Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road. Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking, 3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste; 18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization; 6,850 tons of asphalt paving; 1,300 LF of pipe culvert placement; 725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix; 106,000 lnft of waterborne pavement markings; 1,600 flagger hours ; 800 pilot car hours Option X: Minor bridge rehabilitation of Brainard Lake Bridge Significant Items for Option X include: 40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy); 10 lnft of remove and reset stone masonry wall; Estimated total cost for Schedule A and Option X is $3 to $5 million
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6817B00019- Pre-Solicitation
- Solicitation
- Awarded
Award typically follows within 30–90 days after the response deadline. (estimate)
- 13×Pre-SolicitationAug 21, 2017
CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge
- AwardedOct 25, 2017
CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge
- SolicitationCurrentOct 31, 2017
CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6817B00019
Archive Date
Dec 15, 2017
Office Address
LAKEWOOD, CO, 80228