Notice ID: adfbc68c1e018434dae7d62e243c2730Award NoticeAwarded
CA FTBR FOLSOM SOUTH TRAIL (1)
Awarded on September 19, 2017. Full description on SAM.gov.
Awarded tounder DTFH6817C00030 (source: SAM.gov award notice)• $882.1K
Overview
- Posted
- September 19, 2017
- Notice type
- Award Notice
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Sacramento County, 95630
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Sep 19, 2017
- Award amount (SAM.gov award notice)
- $882.1K
Identifiers
- Solicitation number
- DTFH6817B00020
- Notice ID
- adfbc68c1e018434dae7d62e243c2730
- Award number (PIID)
- DTFH6817C00030
Description
The Folsom South Trail Improvements project is located in Sacramento County in Folsom, CA on Bureau of Reclamation property adjacent to the Folsom South Canal. The trail, initially constructed for use by BOR maintenance vehicles along the length of the canal, has been opened to the public in recent years due to urban development and increasing popularity amongst bicyclists and pedestrians. The project consists of safety improvements for bicyclists and pedestrians, and pavement preservation. Safety enhancements will be achieve via signing, pavement marking removal and replacement, and hazard mitigation. Object markers will be placed on blunt end immovable obstacles and on limited vertical clearances at a tunnel crossing. Existing blunt end curbs will be tapered or removed. Fences that currently present obstacles along the canal, particularly for bicyclists, will be relocated to flatten existing tapers in the direction of travel. Entrances to the trail at multiple cross roads will be widened to facilitate bicycle ingress/egress. Pavement preservation consists of asphalt pavement patching, crack sealing, and micro surfacing. The BOR will allow full trail closures in work areas as needed. areas in coordination with the Bureau of Reclamation, but no delays nor closures of through roadways. Construction is planned between October and December. Historically, weather conditions typically allow construction during this timeframe. Significant quantities for the overall project include: Line Item Unit Est. Quantity Micro Surfacing, Type 3 SQ YD 42,700 Crack Cleaning & Sealing MILES 10 Asphalt Concrete Pavement Patching SQ YD 240 Removal of Existing Pavement Markings LF 50,200 Pavement Markings, Type B, Solid/Broken MILES 83 Sign Systems EACH 110 Fence LF 470 Modify Gates EACH 12 This is a small business set-aside. The estimated price is between $500,000 and $1,000,000.00.
Award Overview
Award Number
DTFH6817C00030
Award Amount (SAM.gov award notice)
$882.1K
Award Date
Sep 19, 2017
Awardee
Original Solicitation
Notice ID: adfbc68c1e018434dae7d62e243c2730
Posted Date: Sep 19, 2017
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Ryan Phillips
Contract Specialist
Secondary Contact
Joe Wilson
Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6817B00020- Market Research
- Awarded
This opportunity has been awarded.
- 7×Market ResearchJul 12, 2017
CA FTBR FOLSOM SOUTH TRAIL (1)
- AwardedCurrentSep 19, 2017
CA FTBR FOLSOM SOUTH TRAIL (1)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6817B00020
Archive Date
Sep 26, 2017