GovChime
Notice ID: 40991eb59b448c77a8d1fd427266d4c1Award NoticeAwarded

NM FLAP TRAIL 5200(1), 2nd Street SW Corridor

Awarded on January 31, 2018. Full description on SAM.gov.

Awarded tounder 6982AF18C000011 (source: SAM.gov award notice)• $5.6M

Overview

Posted
January 31, 2018
Notice type
Award Notice
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of Transportation

Notice details

Place of performance
Valley De Oro National Wildlife Refuge, Albuquerque, NM, 87106
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Jan 31, 2018
Award amount (SAM.gov award notice)
$5.6M

Identifiers

Solicitation number
DTFH6817B00030
Notice ID
40991eb59b448c77a8d1fd427266d4c1
Award number (PIID)
6982AF18C000011

Description

The intent of this project is to improve access to the newly-designated Valle de Oro National Wildlife Refuge for vehicles, pedestrians, and cyclists. The proposed project improvements include roadway rehabilitation and widening, new curb and gutter and sidewalk on the west side between Desert and South Diversion Channel, 10' wide asphalt multi-use trail, drainage improvements, guardrail, landscaping, lighting, signing and striping, utility adjustments and/or relocations by the utility companies as necessary, and new pedestrian bridge over South Diversion Channel for approximately 1.71 miles from the refuge entrance north to the north side of the South Diversion Channel including the realignment of the Desert Road intersection to a T-intersection with new railroad crossing with traffic signals and RR gates/signals. SIGNIFICANT QUANTITIES (Schedule B): 20401-0000, Roadway Excavation: 10,000 CUYD 30202-2000, Roadway Aggregate, Method 2: 7,000 TON 40301-0000, Asphalt Concrete Pavement: 10,500 TON 57101-0000, Prefabricated Bridge Superstructure: 1 EACH 60202-0200, 18-Inch Equivalent Diameter Arch or Elliptical Pipe Culvert: 4,200 LNFT 60902-1200, Curb and Gutter, Concrete, 14-Inch Depth: 7,500 LNFT 61901-2250 Fence, Rail (Wrought Iron, 6' Height): 5,000 LNFT It is anticipated that the project will be advertised in November, 2017. Construction is anticipated to occur from December, 2017 to September, 2018. Estimated total cost is $7.5 million to $10 million.

Full description on SAM.gov

Award Overview

Award Number

6982AF18C000011

Award Amount (SAM.gov award notice)

$5.6M

Award Date

Jan 31, 2018

Awardee

Awardee UEI

LZ6TTCEHLG83

Original Solicitation

Notice ID: 40991eb59b448c77a8d1fd427266d4c1

Posted Date: Jan 31, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:DTFH6817B00030
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 9×
    Pre-SolicitationOct 17, 2017

    NM FLAP TRAIL 5200(1), 2nd Street SW Corridor

    Notice c4f21fa1060164b538ccb321da3af23d on SAM.gov

  2. SolicitationJan 23, 2018

    NM FLAP TRAIL 5200(1), 2nd Street SW Corridor

    Notice d903e2a8c9a0e9650cb88b374da07900 on SAM.gov

  3. AwardedCurrentJan 31, 2018

    NM FLAP TRAIL 5200(1), 2nd Street SW Corridor

    Notice 40991eb59b448c77a8d1fd427266d4c1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

DTFH6817B00030

Archive Date

Feb 15, 2018

Office Address

LAKEWOOD, CO, 80228