Notice ID: 40991eb59b448c77a8d1fd427266d4c1Award NoticeAwarded
NM FLAP TRAIL 5200(1), 2nd Street SW Corridor
Awarded on January 31, 2018. Full description on SAM.gov.
Awarded tounder 6982AF18C000011 (source: SAM.gov award notice)• $5.6M
Overview
- Posted
- January 31, 2018
- Notice type
- Award Notice
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of Transportation
Notice details
- Place of performance
- Valley De Oro National Wildlife Refuge, Albuquerque, NM, 87106
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Jan 31, 2018
- Award amount (SAM.gov award notice)
- $5.6M
Identifiers
- Solicitation number
- DTFH6817B00030
- Notice ID
- 40991eb59b448c77a8d1fd427266d4c1
- Award number (PIID)
- 6982AF18C000011
Description
The intent of this project is to improve access to the newly-designated Valle de Oro National Wildlife Refuge for vehicles, pedestrians, and cyclists. The proposed project improvements include roadway rehabilitation and widening, new curb and gutter and sidewalk on the west side between Desert and South Diversion Channel, 10' wide asphalt multi-use trail, drainage improvements, guardrail, landscaping, lighting, signing and striping, utility adjustments and/or relocations by the utility companies as necessary, and new pedestrian bridge over South Diversion Channel for approximately 1.71 miles from the refuge entrance north to the north side of the South Diversion Channel including the realignment of the Desert Road intersection to a T-intersection with new railroad crossing with traffic signals and RR gates/signals. SIGNIFICANT QUANTITIES (Schedule B): 20401-0000, Roadway Excavation: 10,000 CUYD 30202-2000, Roadway Aggregate, Method 2: 7,000 TON 40301-0000, Asphalt Concrete Pavement: 10,500 TON 57101-0000, Prefabricated Bridge Superstructure: 1 EACH 60202-0200, 18-Inch Equivalent Diameter Arch or Elliptical Pipe Culvert: 4,200 LNFT 60902-1200, Curb and Gutter, Concrete, 14-Inch Depth: 7,500 LNFT 61901-2250 Fence, Rail (Wrought Iron, 6' Height): 5,000 LNFT It is anticipated that the project will be advertised in November, 2017. Construction is anticipated to occur from December, 2017 to September, 2018. Estimated total cost is $7.5 million to $10 million.
Award Overview
Award Number
6982AF18C000011
Award Amount (SAM.gov award notice)
$5.6M
Award Date
Jan 31, 2018
Awardee
Awardee UEI
LZ6TTCEHLG83
Original Solicitation
Notice ID: 40991eb59b448c77a8d1fd427266d4c1
Posted Date: Jan 31, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6817B00030- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 9×Pre-SolicitationOct 17, 2017
NM FLAP TRAIL 5200(1), 2nd Street SW Corridor
- SolicitationJan 23, 2018
NM FLAP TRAIL 5200(1), 2nd Street SW Corridor
- AwardedCurrentJan 31, 2018
NM FLAP TRAIL 5200(1), 2nd Street SW Corridor
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH6817B00030
Archive Date
Feb 15, 2018
Office Address
LAKEWOOD, CO, 80228