Notice ID: 7f3a6b63f1d8645a1d17e0c3725618e0Combined Synopsis/Solicitation
MOBA IR-SCAT (MTPS-100 SYSTEM)
Archived on April 28, 2015. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 PM UTC+02:00
- Posted
- March 27, 2015
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 423830: Industrial Machinery and Equipment Merchant Wholesalers
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 693C73 EASTERN FED LANDS DIVISION
- Place of performance
- 21400 RIDGETOP CIRCLE, Sterling, 20166
- PSC
- 36: SPECIAL INDUSTRY MACHINERY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- DTFH7115Q00018
- Notice ID
- 7f3a6b63f1d8645a1d17e0c3725618e0
Description
NOTICE OF INTENT TO SOLE SOURCE: THE EASTERN FEDERAL LANDS HIGHWAY DIVISION (EFLHD), OF THE FEDERAL HIGHWAY ADMINISTRATION (FHWA), INTENDS TO PROCURE FROM MOBA CORPORATION, LOCATED IN FAYETTEVILLE, GEORGIA, ONE (1) PAVE-IR MTPS-100 SYSTEM (SCANNER). THE MOBA IR-SCAN (MTPS-100 SYSTEM) IS THE ONLY KNOWN AVAILABLE SYSTEM THAT SATISFIES THE TECHNOLOGICAL REQUIREMENTS OF SHRP2 R06C, ROUND 4 IMPLEMENTATION. SHRP2, A PROGRAM FUNDED BY FHWA AND STATE DOTS, SELECTED EFLHD TO DEPLOY AND DEMONSTRATE THIS PARTICULAR TECHNOLOGY. MOBA IS THE ONLY KNOWN IR SCANNER PROVIDER WHICH INTEGRATES AUTOMATIC DATA COLLECTION AND ANALYSIS FOR HIGH-RESOLUTION INFRARED THERMAL PROFILES ACROSS THE ENTIRE PAVEMENT LANE TRANSVERSELY AND LONGITUDINALLY IN REAL-TIME COLLECTION FOR THE PURPOSE OF REAL TIME VERIFICATION OF HOT MIX ASPHALT PAVEMENT CONSTRUCTION QUALITY. TECHNICAL REQUIREMENTS OF THE EQUIPMENT INCLUDE: o THERMAL PROFILE SENSOR: ? RANGE OF TEMPERATURE MEASUREMENTS FROM 0-280 C; ? A WORKING HEIGHT OF 1.5-5.0 METERS --- SCAN WIDTH UP TO 13M @ 4M WORKING HEIGHT; ? SCAN ANGLE UP TO 60 ; ? SCAN SPEED OF 40 MS PER SPOT; ? VARIABLE SPOT MEASURING FROM 1 TO AT LEAST 60; ? RESOLUTION OF 0.1 C; ? OPTICAL RESOLUTION OF 33:1; ? ACCURACY: GREATER OF 2% OR 2 C; ? REPEATABILITY: GREATER OF 0.5% OR 0.5 C; ? SPECTRAL RANGE OF 8-14 ?M; ? OPERATION TEMPERATURE RANGE OF -10 TO + 70 C; o INTEGRATED L1 GPS+GLONASS RECEIVER AND ANTENNA: THE SYSTEM MUST MEET THE FOLLOWING REQUIREMENTS: ? MEETS OR EXCEEDS MIL-STD-810G SPECIFICATIONS; ? A MINIMUM OF 14 CHANNELS WITH PHASE TRACKING; ? A HORIZONTAL RMS AUTONOMOUS L1 ACCURACY OF 1.5 M; ? A HORIZONTAL RMS SBAS ACCURACY OF 0.9M; ? A HORIZONTAL RMS DGPS ACCURACY OF 0.5M; ? L1 C/A CODE RMS MEASUREMENT PRECISION OF 18CM ; ? L1 CARRIER PHASE RMS MEASUREMENT PRECISION OF 1.5MM; ? SIGNAL REACQUISITION TYPICALLY LESS THAN 1.0 SECONDS; ? DATA MEASUREMENT AND POSITION RATES OF 1 HZ MINIMUM; ? OPERATION TEMPERATURE RANGE OF -40 TO + 75 C; o MAGNETICALLY ATTACHED ABSOLUTE ENCODER FOR DISTANCE MEASUREMENT; o INDIVIDUAL THERMAL ROWS HAVE THEIR OWN GPS STAMP (COORDINATES); o THE THERMAL PROFILE SENSOR (SCANNER) NEEDS TO BE MOUNTABLE TO THE PAVER'S MAST OR ABOVE THE PAVER; o START AND STOP RECOGNITION OF MACHINE; o SYSTEM IS POWERED BY MACHINE; o MEMORY DRIVE CONNECTS DIRECTLY TO COMPUTER; o REMOTE MONITORING CAPABILITIES; o SOFTWARE HAS THE ABILITY TO PRODUCE QC/QA REPORTS; o FULL-COLOR TEMPERATURE PROFILE DISPLAYS IN REAL TIME ON A COLOR TOUCH SCREEN DISPLAY AND ALLOWS FOR REVIEW OF POSITION IN THE PROJECT; o ALL TEMPERATURE DATA IS DISPLAYED ON THE ON-BOARD COMPUTER AS MEASUREMENT POINTS TOGETHER WITH DATA SUCH AS POSITION DATA, DISTANCE COVERED AND AVERAGE SPEED OF THE PAVER. AT THE SAME TIME, ALL OF THIS INFORMATION IS STORED FOR DOCUMENTATION AND EVALUATION. o ALL ELECTRONIC COMPONENTS IN THE SYSTEM ARE SPECIALLY PROTECTED FOR USE OUTDOORS AGAINST PENETRATION BY DUST AND WATER AND AGAINST DAMAGE BY HEAT AND VIBRATIONS. ALL RESPONSIBLE SOURCES MAY SUBMIT A QUOTATION WHICH, IF RECEIVED TIMELY, WITHIN 15 DAYS OF THE POSTED DATE, SHALL BE CONSIDERED BY THE AGENCY.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
DTFH7115Q00018- Combined Synopsis
- Combined SynopsisCurrentMar 27, 2015
MOBA IR-SCAT (MTPS-100 SYSTEM)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
DTFH7115Q00018
Archive Date
Apr 28, 2015