WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

Overview

Response deadline
2:00 PM CST
Posted
November 2, 2026
Notice type
Solicitation
Set-aside
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
Place of performance
0, Oklahoma, 73145
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA813727R0002
Notice ID
aee94c1c68df420f971df6923339ea87

Description

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY

UDATE 02 - 2 November 2026

1) An amendment titled "Solicitation Amendment - FA813727R00020001" has been posted to the attachments section of this post

2) A summary of changes to the solicitation titled "Solicitation Amendment FA813727R00020001 SF 30" has been posted to the attachments section of this post

3) The Wage Determination titled "Wage Determination - OK20260049 05-18-2026" has been posted to attachments section of this post

4) The RFP due date has been extended to 23 November 2026 @ 1400 (2:00 pm)

5) A second amendment to the solicitation is expected to be made along with the posting of RFI responses in the future. 

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY

UDATE 01 - 15 October 2026

1) The site visit for this requirement was conducted on 15 October 2026

2) RFI's are due 22 October 2026 @ 1400 (2:00 pm) CST 

3) Send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil

4) The site visit sign in sheet has been posted in the attachments

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY

After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In you RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.

After receipt of your RSVP and EAL if required, Initial Site Visit is set for Thursday, 15 October, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W --  An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. 

You must attend the initial Site Vist for the project, to be considered eligible to propose. 

Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil" and CC Tamra Torres at "tamra.torres@us.af.mil".

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (139)

  • Solicitation Amendment - FA813726R00260001.pdf

    703 KBAdded in Solicitation version 3Posted
    Download
  • Solicitation Amendment FA813727R00020001 SF 30.pdf

    515 KBAdded in Solicitation version 3Posted
    Download
  • Wage Determination - OK20260049 05-18-2026.pdf

    206 KBAdded in Solicitation version 3Posted
    Download
  • WWYK250063 - Site Visit Sign In Sheet.jpg

    96 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation - FA813727R0002.pdf

    765 KBAdded in Solicitation version 1Posted
    Download
  • Site Visit Meet Up Location.png

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 14_Prebid RFI Responses Round 2.pdf

    290 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 13_Prebid RFI Responses Round 1.pdf

    224 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 9_SOW.pdf

    374 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 8_Liquidated Damages.pdf

    82 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 6_OPSEC Review Memo.pdf

    1.8 MBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 4_ODS.pdf

    157 KBAdded in Solicitation version 1Posted
    Download
  • 2020 TAFB Facility Standard.pdf

    5.8 MBAdded in Solicitation version 1Posted
    Download
  • 2026 TAFB Mechanical Standard_signed.pdf

    1.2 MBAdded in Solicitation version 1Posted
    Download
  • 2026 TAFB Electrical Standard - Signed.pdf

    523 KBAdded in Solicitation version 1Posted
    Download
  • 2026 TAFB FIRE PROTECTION STANDARD.pdf

    341 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 04_Automated Casting Cell.pdf

    658 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 02c_Controlled Area Training - Certificate.pdf

    467 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx

    16 KBAdded in Solicitation version 1Posted
    Download
  • SOW Att 02a_Controlled Area Training.pptx

    651 KBAdded in Solicitation version 1Posted
    Download
  • 250063_SOW.pdf

    374 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 10_Submittal Register.xlsx

    70 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 10_Submittal Register.pdf

    360 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 3_RMDF.pdf

    265 KBAdded in Solicitation version 1Posted
    Download
  • 23 09 23.02.pdf

    168 KBAdded in Solicitation version 1Posted
    Download
  • 22 00 00.pdf

    359 KBAdded in Solicitation version 1Posted
    Download
  • 23 31 13.00 40.pdf

    182 KBAdded in Solicitation version 1Posted
    Download
  • 23 08 00.pdf

    163 KBAdded in Solicitation version 1Posted
    Download
  • 23 00 00.pdf

    245 KBAdded in Solicitation version 1Posted
    Download
  • 21 13 13.pdf

    103 KBAdded in Solicitation version 1Posted
    Download
  • 23 07 00.pdf

    233 KBAdded in Solicitation version 1Posted
    Download
  • 23 05 48.00 40.pdf

    49 KBAdded in Solicitation version 1Posted
    Download
  • 23 36 00.00 40.pdf

    90 KBAdded in Solicitation version 1Posted
    Download
  • 23 05 15.pdf

    151 KBAdded in Solicitation version 1Posted
    Download
  • 09 67 23.15.pdf

    90 KBAdded in Solicitation version 1Posted
    Download
  • 23 09 13.pdf

    171 KBAdded in Solicitation version 1Posted
    Download
  • 09 90 00.pdf

    139 KBAdded in Solicitation version 1Posted
    Download
  • 26 20 00.pdf

    187 KBAdded in Solicitation version 1Posted
    Download
  • 10 14 00.10.pdf

    42 KBAdded in Solicitation version 1Posted
    Download
  • 08 81 00.pdf

    57 KBAdded in Solicitation version 1Posted
    Download
  • 08 51 23.pdf

    38 KBAdded in Solicitation version 1Posted
    Download
  • 08 11 13.pdf

    39 KBAdded in Solicitation version 1Posted
    Download
  • 08 33 23.pdf

    47 KBAdded in Solicitation version 1Posted
    Download
  • 07 92 00.pdf

    43 KBAdded in Solicitation version 1Posted
    Download
  • 07 14 00.pdf

    40 KBAdded in Solicitation version 1Posted
    Download
  • 08 71 00.pdf

    59 KBAdded in Solicitation version 1Posted
    Download
  • 23 03 00.pdf

    25 KBAdded in Solicitation version 1Posted
    Download
  • 23 05 93.pdf

    57 KBAdded in Solicitation version 1Posted
    Download
  • 10 14 00.20.pdf

    30 KBAdded in Solicitation version 1Posted
    Download
  • 10 22 13.pdf

    22 KBAdded in Solicitation version 1Posted
    Download
  • 05 40 00.pdf

    42 KBAdded in Solicitation version 1Posted
    Download
  • 07 84 00.pdf

    32 KBAdded in Solicitation version 1Posted
    Download
  • 28 31 76.pdf

    200 KBAdded in Solicitation version 1Posted
    Download
  • 10 44 16.pdf

    14 KBAdded in Solicitation version 1Posted
    Download
  • 07 21 16.pdf

    26 KBAdded in Solicitation version 1Posted
    Download
  • 03 01 00.pdf

    148 KBAdded in Solicitation version 1Posted
    Download
  • 23 64 26.pdf

    165 KBAdded in Solicitation version 1Posted
    Download
  • 05 05 23.16.pdf

    34 KBAdded in Solicitation version 1Posted
    Download
  • 06 41 16.00 10.pdf

    57 KBAdded in Solicitation version 1Posted
    Download
  • 00 72 00.pdf

    5.3 MBAdded in Solicitation version 1Posted
    Download
  • 01 78 00.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • 00 71 00.pdf

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • 00 70 00.pdf

    897 KBAdded in Solicitation version 1Posted
    Download
  • 01 33 00.pdf

    856 KBAdded in Solicitation version 1Posted
    Download
  • 01 45 00.00 10.pdf

    36 KBAdded in Solicitation version 1Posted
    Download
  • 01 78 23.pdf

    34 KBAdded in Solicitation version 1Posted
    Download
  • 01 50 00.pdf

    300 KBAdded in Solicitation version 1Posted
    Download
  • 01 32 16.00 20.pdf

    28 KBAdded in Solicitation version 1Posted
    Download
  • 00 80 05.pdf

    10 KBAdded in Solicitation version 1Posted
    Download
  • 01 42 00.pdf

    10 KBAdded in Solicitation version 1Posted
    Download
  • 01 33 16.00 10.pdf

    86 KBAdded in Solicitation version 1Posted
    Download
  • 00 80 00.pdf

    8.2 KBAdded in Solicitation version 1Posted
    Download
  • HAZMAT Reporting at Tinker AFB FEB 2025.pdf

    23 KBAdded in Solicitation version 1Posted
    Download
  • UMRL.pdf

    686 KBAdded in Solicitation version 1Posted
    Download
  • ERDCITL_TR12-1_r2.pdf

    3.4 MBAdded in Solicitation version 1Posted
    Download
  • ERDCITL_TR12-6_r6.pdf

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_260_01_2019_c1.pdf

    70 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_535_01_2017_c4.pdf

    20 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP.pdf

    16 MBAdded in Solicitation version 1Posted
    Download
  • EM_385-1-1.pdf

    10 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_600_01_2016_c6.pdf

    9.9 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP_App G.pdf

    4.6 MBAdded in Solicitation version 1Posted
    Download
  • dafman91-203.pdf

    3.8 MBAdded in Solicitation version 1Posted
    Download
  • dafi21-101_afmcsup_afmcgm2023-01.pdf

    2.8 MBAdded in Solicitation version 1Posted
    Download
  • afi91-202_afmcsup.pdf

    2.7 MBAdded in Solicitation version 1Posted
    Download
  • dafi21-101.pdf

    2.5 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_260_04_2018.pdf

    2.3 MBAdded in Solicitation version 1Posted
    Download
  • ufc_3_601_02_2021.pdf

    2.1 MBAdded in Solicitation version 1Posted
    Download
  • dafi91-202.pdf

    1.9 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafbi13-204.pdf

    1.8 MBAdded in Solicitation version 1Posted
    Download
  • afman32-7003.pdf

    1.3 MBAdded in Solicitation version 1Posted
    Download
  • dafi13-213.pdf

    1.2 MBAdded in Solicitation version 1Posted
    Download
  • afman40-201.pdf

    1.1 MBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_HWMP.pdf

    1016 KBAdded in Solicitation version 1Posted
    Download
  • afman48-148.pdf

    1.0 MBAdded in Solicitation version 1Posted
    Download
  • dafi13-213_tinkerafbsup.pdf

    687 KBAdded in Solicitation version 1Posted
    Download
  • TAFB_SOP_outages_v2.pdf

    473 KBAdded in Solicitation version 1Posted
    Download
  • afman91-203_oc-alcsup.pdf

    389 KBAdded in Solicitation version 1Posted
    Download
  • afi48-104.pdf

    317 KBAdded in Solicitation version 1Posted
    Download
  • tinkerafb_INRMP_App E.pdf

    225 KBAdded in Solicitation version 1Posted
    Download
  • tinkerafbi21-100.pdf

    213 KBAdded in Solicitation version 1Posted
    Download
  • dodio-2000.16v1_afi10-245-o.pdf

    37 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch13_AF487.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • 013300_Attch1_TAFBF3000.pdf

    234 KBAdded in Solicitation version 1Posted
    Download
  • 007100_Attch1_Airfield Construction Waiver.pdf

    192 KBAdded in Solicitation version 1Posted
    Download
  • 007000_Attch1_TAFB Outage Request Form.pdf

    186 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch14_Information for New Boilers.pdf

    144 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch7b_Monthly Hazardous Usage Report.pdf

    123 KBAdded in Solicitation version 1Posted
    Download
  • 017800_Attch1_DD1354.pdf

    93 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch9_EMS Awareness Training.pdf

    86 KBAdded in Solicitation version 1Posted
    Download
  • 007200_Attch7a_AF3952.pdf

    40 KBAdded in Solicitation version 1Posted
    Download
  • 017800_Attch2_DD1354 Checklist.docx

    44 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ATT 11_Drawings.pdf

    14 MBAdded in Solicitation version 1Posted
    Download
  • image.png

    66 KBAdded in Solicitation version 1Posted
    Download
  • HELICAL PILES NOTES.docx

    15 KBAdded in Solicitation version 1Posted
    Download
  • image (1).png

    243 KBAdded in Solicitation version 1Posted
    Download
  • Room finish schedule.xlsx

    10 KBAdded in Solicitation version 1Posted
    Download
  • Door_Window_Schedule.xlsx

    21 KBAdded in Solicitation version 1Posted
    Download
  • JOIST SPECIAL INSPECTIONS.xlsx

    9.7 KBAdded in Solicitation version 1Posted
    Download
  • PILE SCHEDULE.xlsx

    11 KBAdded in Solicitation version 1Posted
    Download
  • ELECTRICAL PANEL SCHEDULE U18L.xlsx

    25 KBAdded in Solicitation version 1Posted
    Download
  • 250063_ Redline A-502.pdf

    309 KBAdded in Solicitation version 1Posted
    Download
  • esvperf_singledual_2023_V2.pdf

    670 KBAdded in Solicitation version 1Posted
    Download
  • DESV_Submittal.pdf

    457 KBAdded in Solicitation version 1Posted
    Download
  • HE05IN_Dimension_Drawing.pdf

    194 KBAdded in Solicitation version 1Posted
    Download
  • z415-bz1.pdf

    286 KBAdded in Solicitation version 1Posted
    Download
  • esvEH_singledual_2023_V2.pdf

    267 KBAdded in Solicitation version 1Posted
    Download
  • lrad331965pd_spec.pdf

    384 KBAdded in Solicitation version 1Posted
    Download
  • REACT VII SA-01.pdf

    340 KBAdded in Solicitation version 1Posted
    Download
  • lk406gn05t4_spec.pdf

    220 KBAdded in Solicitation version 1Posted
    Download
  • z400i.pdf_safe.pdf

    121 KBAdded in Solicitation version 1Posted
    Download
  • TAFB B9001 VAV Schedule.pdf

    5.6 KBAdded in Solicitation version 1Posted
    Download
  • ELECTRICAL COMBINED.pdf

    53 MBAdded in Solicitation version 1Posted
    Download
  • ARCH-COMBINED.pdf

    41 MBAdded in Solicitation version 1Posted
    Download
  • 4500-S.pdf

    14 MBAdded in Solicitation version 1Posted
    Download
  • 4500-CIVIL.pdf

    14 MBAdded in Solicitation version 1Posted
    Download
  • 4500-MUG.pdf

    14 MBAdded in Solicitation version 1Posted
    Download
  • 220042 As Built Drawings.pdf

    12 MBAdded in Solicitation version 1Posted
    Download
  • overall plan 04.15.2021.pdf

    184 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

    Notice 41719611785b4a66a3589629de9e3352 on SAM.gov

  2. 2
    Version 2Solicitation

    WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

    Notice 7f105ecbe35f4d1d822ca089d54bc22e on SAM.gov

  3. 3
    Version 3SolicitationCurrent

    WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

    Notice aee94c1c68df420f971df6923339ea87 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Updated 26 May 2026 Updated SAM post to refelect correct proposal due date of 12 June 2026. Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Updated 19 May 2026 Solicitation has been attached. Proposals due 12 June. Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Updated 06 May 2026 RFI Government Responses are attached. Solicitation is still in the draft stage and will be posted as soon as it is finished. Only the MAC BOA Holder GCs that attended Site Visit on 21 April 2026 will be able to continue forward toward the award. Only the MAC BOA Holder GCs that attended Site Visit on 21 Apr 2026 will be able to continue forward toward the award. Updated 21 April 2026 Initial Site Visit Sign In Sheet has been attached. RFIs due 28 April 2026 Proposals due 28 May 2026 Only the MAC BOA Holder GCs that attended Site Visit on 21 Apr 2026 will be able to continue forward toward the award. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0019 Project Title: WWYK200326 – REPAIR CATWALKS B3001 POST S-57 Project Location: Tinker AFB - B3001 POST S-57 Repair by replacement of catwalks at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145 The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL an Initial Site Visit is set for Tuesday, April 21st at 1100 CST at Building 3001. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
78%
Solicitation06/12/2026
This solicitation has been extended to 4:30 PM ET, 16 November 2026 due to the worldwide Microsoft issues. Acknowledgement of this extension is not required on the SF1442. All proposals with acknowledgement of Amendment 1 will be deemed fully responsive. AMENDMENT 01: The purpose of this amendment is to: A. Extend the proposal due date to 12:00 PM ET 13 November 2026. B. Incorporate Questions and Answers, and revised/additional solicitation documents to the solicitation. C. All other terms and conditions remain unchanged.
71%
Solicitation11/16/2026
Update 4 - September 29, 2026 The government is still working on RFI responses and proposal due date will be updated once the RFI responses are posted. --------------------------------------------------------------------------------------------------------- Update 3 - August 26, 2026 Please see amendment 1 attached. --------------------------------------------------------------------------------------------------------- Update 2 - August 7, 2026 Uploaded 2 specs documents to the attachments based on RFIs received. The government is working on answering RFIs and those will be posted at a later date. This order proposal request is only available to current MACBOA holders with NAICS 236220 Update 1 - July 28, 2026 RFIs are due by August 4th at 2pm from Prime contractors that attended the site visit. This posting is only available to current Tinker AFB MACBOA holders with NAICS 236220 ProjectSolicitation Number: FA813726R0021 Project Title: WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 Project Location: Tinker AFB, B3221 Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. You must attend the site visit to be eligible to submit a proposal. Your RSVP email must be received by 2:00pm CT on 23 July 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must send their names with the RSVP. The initial site visit will be held on Tuesday, 28 July, 2026, at 9 am. Everyone will meet at the main entrance of B3221. If you require base access, details will be coordinated with you at the time of RSVP. Proposal due date for Step-one is 1 September, 2026 at 2pm CT. As a reminder to the offeror(s) – 2-Step Sealed Bidding process is as follows: Step-One – conduct the initial site visit with prime contractors (offerors) and their subcontractors. After the initial site visit the offeror(s) are to submit RFIs for a government response. RFI government responses will be provided to the offeror(s), any questions or concerns of the responses should be addressed as a follow on RFI. Once the RFIs have been provided to the offeror(s), a request for technical proposal (RFTP) will be sent to the offeror(s) to submit the technical proposal to the government contracting office. Technical proposals are not to have any pricing, unit nor total, but does need to have all material and quantiles as required for any proposal. At this time, no additional RFIs are to be submitted. A technical evaluation of the technical proposal will be conducted and only the offeror(s) found to be technically acceptable will proceed to Step-Two. Step-Two – a request for price bid (RFPB) will be sent to all offerors that had Step-One found to be technically acceptable. And a date / time for submission of price bid will be stated. In Step-Two, a cover page of the total price and follow-on pages of full pricing break down to include material unit/total prices. During this step no additional RFIs are to be submitted, and no additional site visits are anticipated but can be requested to assist in developing pricing. After submission of price bids, a bid opening date will be advertised. During the bid opening, only the total submitted bid price from price bid cover page of each offeror will be verbalized. And an apparent low bid offeror will be announced at the bid opening. A more in-depth price evaluation will be conducted on the apparent low bid offeror’s proposal to determine full acceptability. If low bid offeror’s price bid is found to be unacceptable, the next lowest offeror’s price bid will be evaluated for acceptability. This order proposal request is only available to current MACBOA holders with NAICS 236220
71%
Solicitation12/30/2026
UPDATE 20 AUG 2026 Soliciation Amenmendment added with the government RFI response. Proposal due date: 1 Sep 2026 NLT 2:00PM CST. UPDATE 10 AUG 2026 The site visit sign in sheet has been uploaded. The RFI due date is now 14 August 2026 NLT 2:00PM CST. Please send all RFIs to austin.elm@us.af.mil. This posting is for Tinker AFB – WOSB construction contractors with NAICS 236220. Project Solicitation Number: FA813726R0045 Project Title: 17829397-Decommission & Demo CRAC Units at B3001, Annex G, Tinker AFB Project Location: Tinker Air Force Base 17829397-Decommission & Demo CRAC Units at B3001, Annex G, Tinker AFB- This project is required to safely decommission and remove two (2) obsolete Computer Room Air Conditioning (CRAC) units from a data center facility. The removal of this equipment necessitates the architectural, mechanical, electrical, and structural restoration of the floor, wall, and ceiling systems to return the space to a safe, clean, and fully operational condition. This work ensures the continued integrity, safety, and professional appearance of a critical mission support facility at Tinker AFB. For project specific documents, please email austin.elm@us.af.mil for access. Specific documents cannot be posted on SAM.gov. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CST on 3 Aug 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. The site visit will be held on 5 Aug 2026. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. You must attend the Initial Site Visit for the project to be considered eligible to propose.
69%
Solicitation09/01/2026
UPDATE 07: Solicitation Amendment was created to cancel the project due to not receiving funding. Attached FA813726R00310004 Amendment. UPDATE 06: Solicitation Amendment was created to extend the Offer Due Date from June 22, 2026 to July 1, 2026. Edited to add SOW attachment 2 Design Narrative. UPDATE 05: Edited to add the Pre-Bid RFI Responses. UPDATE 04: June 10, 2026 Solicitation Amendment was created to extend the Offer Due Date from June 19, 2026, to June 22, 2026 UPDATE 03 May 27 2026 Solicitation Amended to include Sections L-Instructions to Offerors and M-Evaluation Factors for Award | FA813726R00310001 Only the MAC BOA Holder GCs that attended Site Visit on 18 MAY 2026 will be able to continue forward toward the award. UPDATE 02 Updated on 27 MAY 2026 to reflect the accurate Proposal Due Date Initial Site Visit Sign In Sheet has been attached. RFIs due 26 MAY 2026 Proposals due 19 JUN 2026 @3:00 PM CST Only the MAC BOA Holder GCs that attended Site Visit on 18 MAY 2026 will be able to continue forward toward the award. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 1) The Site Visit for this project is Scheduled for 18 May 2026 at 0930 (9:30 am) This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0031 Project Title: WWYK230170 – Install MNS and Replace Heat Detectors B976 Project Location: Tinker AFB - B976 Repair by replacement the Mass Notification System and Heat Detectors within B976 at Tinker Air Force Base (AFB) Oklahoma 73145 The estimated project value is between $1M and $5M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. You must attend the Initial Site Visit (18 May 2026) for the project to be considered eligible to propose. Only 7 attendees per prime contractor will be allowed to attend site visit. This posting is for Tinker AFB - MAC BOA Holders ONLY.
64%
Solicitation06/22/2026

Additional Details

Solicitation Number

FA813727R0002

Archive Date

Dec 25, 2026

Office Address

TINKER AFB, OK, 73145-9125