REQUEST FOR INFORMATION - Large Caliber Penetrators
Archived on December 27, 2025. Sources Sought posted by DEPT OF DEFENSE (DEPT OF THE AIR FORCE) on December 4, 2025. Solicitation EBDA_RFI_LCP_01.
NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing). Set-aside: No Set aside used. Place of performance: Florida. Original response deadline: . Full description on SAM.gov.
Description
4 December 2025 - Please see the attached answers to the questions received.
18 November 2025 - The RFI is being amended to correct POCs, update Controlled Unclassified Information (CUI) document request infofmation, and an overall clean-up of the RFI. The changes are highlighted in yellow. Please see the attached amendment.
The Air Force Life Cycle Management Center, Armament Directorate, Attack Division (AFLCMC/EBD) is conducting market research for an industry analysis of capabilities. AFLCMC/EBD seeks to better characterize the technological, manufacturing, and business capabilities of the industrial base to develop and produce a materiel solution to address this operational objective. AFLCMC/EBD will use this information to inform its trade space analysis of industry capabilities that can potentially meet technology demonstration needs for a Large Caliber Penetrator requirement. The United States Air Force (USAF) is seeking to identify capable vendors for maturing the tailkit (TK) design, development, and flight test of a prototype capable of demonstrating system accuracy.
Please see attached RFI for additional information.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 3 of 3 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | DEPT OF THE AIR FORCE | Dec 4, 2025 | 211.62 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Dec 4, 2025 | 212.89 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Dec 4, 2025 | 42.67 KB |
Lifecycle
EBDA_RFI_LCP_01- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 3×Market ResearchCurrentNov 7, 2025
REQUEST FOR INFORMATION - Large Caliber Penetrators
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
The Contractor shall provide all necessary personnel, services, and management to perform system sustainment, on-call technical support, configuration management, and engineering support for the FGDS System. The scope of this effort includes support for F-35 Block 4 enhancements related to the Communication, Navigation, Identification (CNI) Avionics Suite. All work shall be performed in accordance with the security controls outlined in the Joint Special Access Program (SAP) Implementation Guide (JSIG) or as directed by AFI 17-101. | Awarded | 334511 | No Set-Aside | 10/05/2026 | Open | - | |
This solicitation is issued with the intent of awarding Sniper CATP2 Option Years 6 & 7. The contractor shall provide efforts required for the management, engineering, production, fabrication, integration, Configuration Management (CM), test, test support, hardware and software upgrades, resolution of Diminishing Manufacturing Sources (DMS), and logistics support of the Sniper system to ensure a system availability rate and reliability Mean Time Between Maintenance Events (MTBME). The Contractor shall adhere to Contractor Quality System; ensuring it is an integral and integrated part of the Contractor's complete management system. The contract period of performance will be for two one-year options, and the Government intends to negotiate and award sole source to Lockheed Martin Corporation (CAGE 04939), 5600 West Sand Lake Road, Orlando FL 32819, in accordance with Revolutionary Far Overhaul (RFO) 6.103-1. All responsible sources may submit a capability statement of proposal, which shall be reviewed by the U.S. Government. A determination by the Government not to compete this proposed contract based upon responses to this solicitation is solely within the discretion of the Government. In accordance with Air Force Instruction (AFI) 16-201, foreign participation is not permitted at the prime contract level. All potential offerors should contact the Contract Specialist/Procuring Contracting Officer for additional information, questions, and/or concerns. Place of performance will be at Robins Air Force Base, GA, or at contractor or subcontractor facilities. Interested Party of Person(s) may identify their interest and capability to respond to the requirement or submit a proposal(s). This solicitation is not a request for competitive proposals. All proposals received within the 15 days after issuance of solicitation will be considered. OMBUDSMAN: All potential offeror(s) should contact the Primary Point of Contact listed in this notice for additional information and/or to communicate concerns, if any, concerning this acquisition. If the contracting officer does not satisfy your concerns, an Ombudsman has been appointed to hear serious concerns that are not resolved through established channels. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate serious Contractor concern, issues, disagreements, and recommendations to appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. When appropriate potential offeror(s) may contract Nicole Furlough at nicole.furlough@us.af.mil or 478-222-1088. Please be prepared to identify previous contacts made by you in an attempt to resolve your concerns. | Solicitation | 334511 | No Set-Aside | 09/22/2026 | 11/20/2026 | Orlando, FL | |
The 46th Test Squadron/TGBC (46TS) requires expert technical services to provide sustaining maintenance, essential upgrades, and comprehensive support for the FGDS System. This support is critical to ensure the FGDS Systems remain current with the F-35 aircraft's developmental baseline, as directed by the F-35 Joint Program Office (JPO). The Contractor shall provide all necessary personnel, services, and management to perform system sustainment, on-call technical support, configuration management, and engineering support for the FGDS System. The scope of this effort includes support for F-35 Block 4 enhancements related to the Communication, Navigation, Identification (CNI) Avionics Suite. All work shall be performed in accordance with the security controls outlined in the Joint Special Access Program (SAP) Implementation Guide (JSIG) or as directed by AFI 17-101. | Sole Source / J&A | 334511 | No Set-Aside | 10/05/2026 | Open | 0, FL | |
04 Sep 2025- Following multiple interactions with industry partners regarding government property concerns, as it relates to the reacquisition of the Instrumentation Range Support Program (IRSP) contract, the Government is undertaking a reevaluation of its current strategy. This decision reflects our commitment to ensuring a fair and competitive bidding environment for all interested firms. To facilitate this reevaluation, the reacquisition process for IRSP IV will be temporarily placed on hold. During this period, the Government will be diligently working to refine and finalize the requirements package as it relates to government property, ensuring it provides industry with the most accurate and complete information possible to promote fair competition. 13 Jun 2025- The submission/response date for RFI#02 has been extended to 3:30 EST PM on 16 Jun 2025. 29 May 2025- RFI#02 Requesting additional information from industry to identify the capabilities to complete a pre-overhaul and overhaul of systems associated with the questions and answers from Industry Day - Q55 & Q58. To include the possibility of concurrent overhauls being conducted at multiple locations across the globe. Four CDLRs have been added, along with the RFI #02 document. 16 May 2025- RFI#01 Posting questions and answers from industry's sources sought notice recommendations/comments (29 Jan 2025) and Industry Day event (24 Apr 2025). 01 May 2025- Adding the Industry Day Sign-in sheet. 25 Apr 2025 - Adding the slide deck that was briefed by the Government team members during the Industry Day (except for the photos and video). The Government is requesting that any additional questions concerning IRSP be submitted to the contracting team members NLT 4:30 PM EST on 02 May 2025. Please provide your questions and/*or comments by using the Company Question Sheet. The Government intent is to have a response to all recommendations/comments/questions recieved during the intial Sources Sought notice and the Industry Day posted on sam.gov by 16 May 2025. Please note- If a company would like to submit a capabilities package to the Government based on the Sources Sought Synopsis (posted on 29 Jan 2025) it may do so by sending it to the contracting team members listed within this notice. --------------------------------------------------------------------------------------------------------------------------------- 18 Apr 2025 - The below documents have been uploaded for review prior to the Industry Day event. IRSP IV Draft SOWv4 (18 Apr 2025) Attachment 5 - Stock Replenishment, Concept of Operations (CONOPS) Attachment 7 - System Summary Attachment 7a - Supported Range System List (Template) Attachment 8 - Range Resource List Attachment 11 PALT Thresholds (v2) --------------------------------------------------------------------------------------------------------------------------------- An Industry Day conference will be held for the purpose of providing all interested parties an opportunity to participate in the initial planning and strategy for the acquistion of the IRSP IV procurement. Please see the Industry Day Notice letter, attachment 1 and attachment 2 for additional information concerning this event. Note: The Government will be posting an IRSP IV Statement of Work and associated documents prior to 24 Apr 2025. | Special Notice | 334511 | No Set-Aside | 09/04/2025 | 06/16/2025 | Patrick Air Force Base, FL | |
13 Jun 2025- The submission/response date for RFI#02 has been extended to 3:30 EST PM on 16 Jun 2025. 29 May 2025- RFI#02 Requesting additional information from industry to identify the capabilities to complete a pre-overhaul and overhaul of systems associated with the questions and answers from Industry Day - Q55 & Q58. To include the possibility of concurrent overhauls being conducted at multiple locations across the globe. Four CDLRs have been added, along with the RFI #02 document. 16 May 2025- RFI#01 Posting questions and answers from industry's sources sought notice recommendations/comments (29 Jan 2025) and Industry Day event (24 Apr 2025). 01 May 2025- Adding the Industry Day Sign-in sheet. 25 Apr 2025 - Adding the slide deck that was briefed by the Government team members during the Industry Day (except for the photos and video). The Government is requesting that any additional questions concerning IRSP be submitted to the contracting team members NLT 4:30 PM EST on 02 May 2025. Please provide your questions and/*or comments by using the Company Question Sheet. The Government intent is to have a response to all recommendations/comments/questions recieved during the intial Sources Sought notice and the Industry Day posted on sam.gov by 16 May 2025. Please note- If a company would like to submit a capabilities package to the Government based on the Sources Sought Synopsis (posted on 29 Jan 2025) it may do so by sending it to the contracting team members listed within this notice. --------------------------------------------------------------------------------------------------------------------------------- 18 Apr 2025 - The below documents have been uploaded for review prior to the Industry Day event. IRSP IV Draft SOWv4 (18 Apr 2025) Attachment 5 - Stock Replenishment, Concept of Operations (CONOPS) Attachment 7 - System Summary Attachment 7a - Supported Range System List (Template) Attachment 8 - Range Resource List Attachment 11 PALT Thresholds (v2) --------------------------------------------------------------------------------------------------------------------------------- An Industry Day conference will be held for the purpose of providing all interested parties an opportunity to participate in the initial planning and strategy for the acquistion of the IRSP IV procurement. Please see the Industry Day Notice letter, attachment 1 and attachment 2 for additional information concerning this event. Note: The Government will be posting an IRSP IV Statement of Work and associated documents prior to 24 Apr 2025. | Special Notice | 334511 | No Set-Aside | 06/13/2025 | 06/16/2025 | Patrick Air Force Base, FL |
Additional Details
Solicitation Number
EBDA_RFI_LCP_01
Archive Date
Dec 27, 2025
Office Address
EGLIN AFB, FL, 32542-5415