GovChime
Notice ID: 7a327f79491c53e8ed81875fdb62f10cAward NoticeAwarded

Window Replacement Anchorage, Alaska

Awarded on June 21, 2017. Full description on SAM.gov.

Awarded tounder GS-10-P-17-XJ-C-0008 (source: SAM.gov award notice)• $18.9K

Overview

Posted
June 22, 2017
Notice type
Award Notice
NAICS
238350: Finish Carpentry Contractors
Agency
General Services Administration

Notice details

Place of performance
Federal Buildings, Anchorage, 99513
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Oct 6, 2025
Award date
Jun 21, 2017
Award amount (SAM.gov award notice)
$18.9K

Identifiers

Solicitation number
EQ10PCB-1-17-0018
Notice ID
7a327f79491c53e8ed81875fdb62f10c
Award number (PIID)
GS-10-P-17-XJ-C-0008

Description

Solicitation No. EQ10PCB-1-17-0018 was for window replacement for 3 Federal Buildings in Anchorage, Alaska Four offers were received. Results of the awarded contracts are as follows: CLIN 001 awarded to Commercial Contractors, Inc. DUS 042801555 4920 Fairbanks St. Anchorage, AK 99503 Award amount $18910.00 CLIN 002 Awarded to Northmen Glass, LLC DUNS 080653820 2300 E 63rd Ave., Unit B Anchorage, AK 99507 Award amount $8472.00 CLIN 003 Awarded to RGC Alaska, LLC, DUNS 080187709 2457 Arctic Blvd. Anchorage, AK 99503 Award amount $6575.82 END OF AWARD NOTICE

Full description on SAM.gov

Award Overview

Award Number

GS-10-P-17-XJ-C-0008

Award Amount (SAM.gov award notice)

$18.9K

Award Date

Jun 21, 2017

Awardee

Awardee UEI

QKY5PFEDY2V1

Original Solicitation

Notice ID: 7a327f79491c53e8ed81875fdb62f10c

Posted Date: Jun 22, 2017

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Amy M. Heusser
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:EQ10PCB-1-17-0018
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 4×
    Pre-SolicitationMar 27, 2017

    Window Replacement Anchorage, AK

    Notice b8c28a21bb05e931bf0ef42b9893694d on SAM.gov

  2. SolicitationMay 9, 2017

    Window Replacement Anchorage, AK

    Notice a7a2740a89ce38c67e0e4c87667225b0 on SAM.gov

  3. AwardedCurrentJun 22, 2017

    Window Replacement Anchorage, Alaska

    Notice 7a327f79491c53e8ed81875fdb62f10c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
******UPDATED MAP SHOWING EXACT SQUARE FOOTAGE OF CARPET TO BE REMOVED AND REPLACED ADDED BY UNITED STATES GOVERNMENT (UNITED STATES COAST GUARD, BASE KETCHIKAN) ON 8OCTOBER2026. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED..... ANTICIPATED AWARD DATE/START OF CARPET INSTALLATION SERVICES SHALL BE CONTINGENT ON AVAILABILTY OF A FUNDED AWARD. EXPECT AWARD & START DATE TO BE November OF 2026. ****************** PERIOD OF PERFORMANCE IS NINETY (90) CALENDAR DAYS FROM DATE OF A SIGNED GOVERNMENT CONTRACT AWARD. ****UPDATED INFO*** ONE (1) PRE-AWARD SITE WALK IS PLANNED on 10/28/2026 at 0900-1130 am for ANY CONTRATOR WHO WISHES TO ATTEND. REQUIRED SECURITY INFORMATION IS REQUIRED IN ADVANCE AND BEFORE 10/21/2026... THE INFORMATION REQUIRED IS: A. FULL NAME OF EACH INDIVIDUAL B. DATE OF BIRTH C. DRIVERS LICENCE OR PASSPORT # REQUIREMNT: THIS PROJECT IS A SIMPLE REMOVAL OF EXISTING CARPET AND FURNISH AND INSTALL NEW CARPET SERVICE CONTRACT (SIMPLE FURNISH AND INSTALLATION PROJECT) CONTRACTORS QUOTE/PROPOSAL SHALL BE VALID FOR 120 CALENDAR DAYS FROM DATE OF SOLICIATION CLOSING DATE LISTED WITHIN SAM. CLIN: 0001 Schedule of Supplies/Services Qty 01 Unit: PROJECT Unit Price Total Amount REMOVAL/DISPOSAL OF OLD CARPET AND INSTALLATION OF NEW CARPET INSTALLATION AS SPECIFIED IN ATTACHED SOW, SPECS AND MAP- Base Ketchikan ****ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS. SEE ATTACHED MAP. AGAIN= ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS. 1 EACH : $ Total $ Total Contract Value $ *The Contractor shall also include regular and overtime rates for any other labor categories proposed. Preparation of this quote is completely voluntary and shall be submitted to the United States Government by date specified herein . ****This shall be awarded to the LOWEST PRICED/ TECHNICALLY ACCEPTABLE/ QUALIFIED CONTRACTOR AND IS CONTINGENT ON THE UNITED STATES COAST GUARD SECURING PROPER FUNDING. 1.0 General 1.1 Background The United States Coast Guard (USCG) is procuring NEW CARPET INSTALLATION Services & REMOVAL/DISPOSAL OF CURRENT CARPET as described within this PWS for USCG Base Ketchikan, AK. Base Ketchikan serves as the single touch point for the support of Coast Guard operations within the 17th Coast Guard District, standing shoulder-to-shoulder with our operational partners to ensure the delivery of professional, responsive, and cost-effective services to the American public. 1.2 Scope The Contractor shall provide the proper mix of personnel, management, supervision, materials, supplies, equipment, tools, transportation, and other items or services (except utilities and limited facilities as defined in section 12.0) necessary to accomplish the CARPET REMOVAL AND INSTALLATION OF BRAND NEW CARPET services required by this PWS. The efforts to be accomplished under this contract are scalable in nature to include other tasks, services, or locations within scope, as required. The contractor is encouraged to assess the work requirements and recommend revisions that would provide beneficial savings to the contractor and the government. 1.2.1 REMOVE EXISTING CARPET AND INSTALL BRAND NEW CARPETcleaning Base Ketchikan for: Administrative building 3RD FLOOR ONLY. a. GENERAL REQUIREMENTS: b. Services to Be Preformed: Carpet REMOVAL AND INSTALLATION OF NEW CARPET is required at each location specified below as determined by the Contracting Officer’s Representative (COR). The Contractor shall provide all necessary labor, equipment, and supplies required to perform these services. All cleaning procedures and treatment shall be accomplished in accordance with the manufacturer’s directions and/or listed specifications and industry standards applicable to the Professional Cleaning & Restoration Industry. 1.2.2 Location of Work Performance: Administrative building 3rd Floor – SEE ATTACHED MAP FOR: sqft 2.3 Work Hours: All carpet REMOVAL AND NEW installation services shall be performed between the hours of 0700 and 1630 AKST. Monday through Friday or by appointment scheduled in advance. The Contractor shall notify the designated Contracting Officer Representative of any deviations to the previously agreed upon appointment and schedule an alternate appointment carpet cleaning. No keys to Government facilities are to be provided to Contractors under any circumstances. 3. PERFORMANCE REQUIREMENTS: OLD CARPET SHALL BE REMOVED AND BRAND NEW CARPET SHALL BE INSTALLED IN according to industry standard to protect the investment as part of a maintenance program that will preserve the appearance and extend the life of the carpet. The contractor will develop a cost-effective cleaning strategy, plan, and schedule. MAPS OF AREAS WITH CARPET TO BE REMOVED AND NEW CARPET INSTALLED- SEE ATTACHMENT ***LAST DAY TO SUBMIT ANY QUESTIONS FOR THIS REQUIRMENT IS: FRIDAY, 25 SEPTEMBER 2026. ALL QUESTIONS AND GOVERNMENT ANSWERS SHALL BE POSTED HERE AS WELL BEFORE THE OFFICIAL CLOSING DATE.
-Combined Synopsis11/13/2026
The Government is canceling Solicitation No. 140RR027Q0011 for the EC-ECAO Exterior Door Replacement requirement because it was published inadvertently. The Government intended to conduct market research through a Sources Sought Notice and is not requesting quotations or offers at this time. No award will be made under this solicitation. The Government intends to issue a separate Sources Sought Notice to gather information from industry and support acquisition planning. If the requirement proceeds to a formal solicitation, the notice will be posted separately on SAM.gov.
-Solicitation11/04/2026
The Bureau of Reclamation, Eastern Colorado Area Office (ECAO), is conducting market research to identify capable vendors for the replacement of approximately ten (10) existing commercial door assemblies at the ECAO facility in Loveland, Colorado.
-Market Research11/04/2026
SOURCES SOUGHT Construction Services for General Services Administration (GSA), Public Buildings Service (PBS) in Alaska Sources Sought Response Date: November 19th, 2026 1:00 PM PT The North American Industry Classification System (NAICS) code is 236220 - Commercial and Institutional Building Construction. This Sources Sought Notice is a market research tool being utilized to determine interest and capability of potential sources prior to issuing a formal solicitation, as the solicitation is not available at this time. This IS NOT a Request for Offerors or Proposals. This notice does not represent a commitment by the Government to issue a solicitation or award a contract, nor does it restrict the Government to a particular acquisition approach. This is a Sources Sought Announcement for planning purposes only. Market research is being conducted to determine if there are businesses with the requisite capabilities and experience to perform the required work. In addition, this market research is to determine if there are respondents that qualify under one or more socio-economic indicators, including but not limited to, small business, woman-owned business, Women Owned Small business (WOSB), Economically Disadvantaged Women Owned Small business (EDWOSB), Veteran Owned Small business, Service Disabled Veteran Owned Small business, SBA Certified Small Disadvantaged business, SBA Certified 8(a) Firm, SBA Certified HUBZone Firm. The U.S. General Services Administration (GSA) anticipates procuring the services of multiple contractors to perform Construction Services in the nature of repair and alteration of real property. The nature of the service is to support the government to successfully accomplish the small project repair and alteration programs in the locations listed in this notice. It is the intention of GSA to award a multiple contractor, Indefinite Delivery, Indefinite Quantity (IDIQ) contract. Description of Services: The contractor shall act as general contractor for small repair and alteration of real property in federal buildings (NAICS 236220), of both interior space and exterior building envelope and grounds. The contractor’s roles and responsibilities may include: design, demolition, abatement, repair and alteration of interior space including but not limited to, carpentry, woods and plastics, drywall, insulation, doors and openings, finishes, paint, bathroom fixtures, plumbing, HVAC, electrical, fire/life/safety equipment, specialized security equipment, fencing, windows, outdoor lighting. Value-added services such as service recommendations, additional coordination, and liaison with third parties may be required. The construction services will be performed in, but not limited to, federally owned facilities throughout Alaska. Task orders may occasionally require construction activities in privately owned leased facilities, however it is anticipated that the majority of construction will take place in federally owned facilities. The Government is considering structuring the IDIQ contracts to provide order-level flexibility for task orders to be placed that are either commercial or non-commercial. The construction services shall comply with GSA’s Core Building Standards, as well as all applicable engineering, architectural and construction standards and codes, to be fully described in any resulting solicitation. Inclusions: The work requirements will include design-build work and construction services as defined in RFO Part 2 and Part 36. The work requirements include Construction Wage Rate Act [formerly Davis-Bacon Act]. Commercial contracting approaches from RFO Part 12 will also be implemented. Exclusions: This Sources Sought does not include stand-alone architect-engineer (A-E) services as defined in the Brooks Act and RFO (FAR) Parts 2 and 36; however, some may require the contractor to provide design services in addition to construction services. This Sources Sought does not include construction management services of other separate projects. If interested in responding to this Sources Sought, please respond by completing and submitting the GSA Alaska Construction IDIQ Sources Sought Questionnaire no later than 1:00pm Pacific Time on Thursday, November 19th, 2026. NO TELEPHONE CALLS WILL BE ACCEPTED. QUESTIONS ARE NOT PERMITTED. THIS IS NOT A REQUEST FOR PROPOSAL OR SOLICITATION.
-Market Research11/19/2026
The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 4,8 and 9. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing wood windows. Incorporated into the demolition of the windows will be the safe removal of both lead and asbestos containing material as guided by the local and national rules and regulations of lead and asbestos remediation. Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows. The window installation shall include the patching and painting of walls, ceiling installation and restoration, trim and millwork installation, and repair of all damaged items in place. This work will be completed in an occupied building; all construction activities shall be completed behind proper construction barriers as described in the specifications. The contractor shall return the worksite to the Veterans Affairs Health Care System after the work is completed, and all of the required work is satisfactorily completed and signed off by the assigned Contracting Officer’s Representative. Refer to the contract specifications and drawings for details All work completed in accordance with the specifications and contract drawings. Work includes, but is not limited to: Demolition: Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Contractor shall remove Lead and Asbestos materials associated with windows Contractor trades anticipated: General contractor General laborer Demolition contractor Abatement contractor Painting contractor No VA furnished equipment New construction consists of but is not limited to windows, doors, general construction and abatement. Contractor is responsible for the movement, adjustment and storage of all furnishings disturbed during construction. Contract working hours are 8 am to 4:30 pm Monday through Friday, excluding Federal Holidays. Weekend and night work may be necessary in sensitive areas and shall be approved by the COR. Phasing will be as listed on the contract documents The period of performance for this work is four hundred fifteen (415) calendar days from issuance of Notice to Proceed (NTP). There is a 60-day window after the Post Award Conference and prior to the Notice to Proceed for badging-related submission and processing. No additional expense will be allowed regarding badging items henceforth.
-Pre-Solicitation06/08/2026

Additional Details

Solicitation Number

EQ10PCB-1-17-0018

Archive Date

Jul 6, 2017