Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

Awarded on November 2, 2020. Full description on SAM.gov.

Awarded tounder 47PL0121C0001 (source: SAM.gov award notice)• $2.0M

Overview

Posted
November 9, 2020
Notice type
Award Notice
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R10 CONSTRUCTION ACQUISITIONS BRANCH
Place of performance
Portland, OR, 97205
Last updated
Oct 9, 2026
Award date
Nov 2, 2020
Award amount (SAM.gov award notice)
$2.0M

Identifiers

Solicitation number
EQ10PCPA2-20-0027
Notice ID
17d73896dbde45a9a392d432311732fe
Award number (PIID)
47PL0121C0001

Description

Project Summary: The Edith Green-Wendell Wyatt (EGWW) Federal Building (OR0043ZZ), located at 1220 SW 3rd Ave, Portland, OR 97205, is an 18-story office building located in Portlands government district. The building has been extensively renovated and modernized in a project that was funded under the American Recovery and Reinvestment Act (ARRA) of 2009 and completed on May 1, 2013. This renovation included the replacement of plumbing and mechanical systems. As part of this renovation, random copolymer polypropylene (PP-R) piping was installed for domestic hot and cold water distribution, rainwater collection and recycle, and zone distribution for chilled water and heating hot water systems. Since March of 2018, a total of ten (10) failures have occurred. Seven (7) failures in the two inch (2 ) PP-R domestic hot water primary loop supply main that extends from water heaters in the penthouse to the basement floor. Two (2) subsequent failures have occurred in the one inch (1 ) DHW primary loop return and one (1) weld failure in the LTHW hydronic loop. This primary loop serves all of the domestic hot water circulating sub-mains in the building. The most recent failure occurred in January 2020. The building remains at high risk for catastrophic failure until these projects are completed. Project 2: The scope of this project is removal of the PP-R primary domestic hot water Zone 2 and Zone 3 domestic hot water loops and replacement with copper piping. The project scope of work is summarized as follows: Plumbing work: Replace all DHW piping in zone 2 (Levels 3 through 10) and zone 3 (Levels 11 through 18) including new zone supply and return risers Replace zone supply and return loops Replace restroom supply and return loops Replace drops and connections to existing fixtures (190 no. total connections Replace concealed DCW piping in restrooms from above-ceiling isolation valve to sink connections Replace Zone 2 and 3 water heaters and circulation pumps Remove and recycle/dispose of all abandoned piping and equipment Insulate to code and label all new piping and equipment to building standards Pressure test Disinfect new piping Architectural work: Open and repair gypsum board walls to access existing zone riser piping in freight elevator vestibule for replacement Open and repair restroom ceilings and tiled walls for replacement of DHW and in-wall DCW piping Open and repair break room wall for new sink connection Remove and replace light fixtures in restrooms as required to access concealed piping Open and replace plank and lay-in tile ceilings as required for replacement of existing distribution loops (including work in tenant areas) Restore all finishes affected by construction. Additional Services: Provide construction management oversight Commissioning services O&M project support (this cost of additional support shall be captured by the General Contractor): Drain and fill plumbing systems Mechanical system Remove and replace ceiling systems, et al Security services to monitor after-hours work in tenant spaces. Open and replace plank and lay-in tile ceilings as required for replacement of existing distribution loops (including work in tenant areas) Restore all finishes affected by construction. Note: Project 2 is not currently funded for FY20. Funds have been reserved for award in Q1 FY21.

Full description on SAM.gov

Award Overview

Award Number

47PL0121C0001

Award Amount (SAM.gov award notice)

$2.0M

Award Date

Nov 2, 2020

Awardee

Awardee UEI

JQVCVTNSJTR5

Awardee CAGE Code

07YZ3

Original Solicitation

Notice ID: 17d73896dbde45a9a392d432311732fe

Posted Date: Nov 9, 2020

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:EQ10PCPA2-20-0027
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationJun 18, 2020

    Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

    Notice c64d54a228d04cc9a17da2bf09298b75 on SAM.gov

  2. SolicitationJul 27, 2020

    Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

    Notice bb933aa721f642e3967ecd59d29b0f53 on SAM.gov

  3. Pre-SolicitationJul 29, 2020

    Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

    Notice 499f1f7faec04cc597770bda408a2a55 on SAM.gov

  4. 6×
    SolicitationJul 29, 2020

    Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

    Notice 59b8b5d3da1d464199a75b1e39173b1f on SAM.gov

  5. AwardedCurrentNov 9, 2020

    Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)

    Notice 17d73896dbde45a9a392d432311732fe on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

EQ10PCPA2-20-0027

Archive Date

Nov 17, 2020

Office Address

Tacoma, WA, 98401