Notice ID: 079c6914eff64c2098b2025cfda33583SolicitationArchived
Engraving Hampton VA
Archived on August 4, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:50 AM EDT
- Posted
- July 16, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 238140: Masonry Contractors
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS PROJECT DELIVERY EAST - BRANCH B
- Place of performance
- Hampton, Virginia, 23681
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- EQPAAB-26-0003
- Notice ID
- 079c6914eff64c2098b2025cfda33583
Description
Masonary engraving. See attached. All responsible sources may submit a quotation which will be considered by the Agency. Anticipated award date is 7/21/26.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jeffery Linskens
Documents
Files (1)
- Download
NASA cornerstone engraving SOW.docx
1.6 MBAdded in Solicitation version 1Posted
Lifecycle
- 1
- 3Version 3SolicitationArchivedCurrent
Engraving Hampton VA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Contractor to supply labor, material and equipment to perform the masonry project to repair the column in the fence alongside Roanoke Blvd.: Load, Deliver & Erect Scaffolding as Necessary Rebuild Brick Column to Original w/ New Face Brick (53-DD Modular) & New Brick Ties Install Existing Concrete Column Cap Clean Entire Jobsite Return to Pressure Wash Entire Work Area Disassemble, Load & Remove Scaffolding from Jobsite . The period of performance will be 90 days from NTP. VA to provide access to site. | - | Solicitation | 09/10/2026 |
Repair Masonry / Structural Issues Scope of Work (SOW) Work for this project will be performed at the W.G. (Bill) Hefner Veterans Affairs Medical Center located at 1601 Brenner Avenue, Salisbury, NC. Contractor shall completely prepare site for building operations, including removal of existing masonry and mortar, and furnish labor and materials to perform work for VA project 659-24-901, Replace Masonry Structural Issues, which includes masonry maintenance and repair to the exterior walls for seven (7) campus buildings (Buildings 5, 6, 7, 11, 13, 19, and 21), with phased construction according to building groupings. Work includes brick repointing, masonry accessory replacements, lintel repairs, repainting, removal and replacement of existing wall-mounted items, expansion joint replacement, brick cleaning, sealant replacement, regrouting, precast and slate repair, and certain other work activities. All work occurs outside of occupied buildings. Therefore, safety and infection control measures are required during construction. The project includes deduct alternates, as required by drawings and specifications. BASE BID ITEM I, Buildings 7, 11, 19 and 21 receive full repointing. Buildings 5, 6 and 13 receive limited repointing and certain other items. All buildings receive building cleaning (including non-masonry wall areas), painting, and certain other refurbishments, as indicated by drawings and specifications. (270 days) BID ITEM 2, ALTERNATE NO.1: BASE BID, except delete full repointing on Building 19 and, instead, provide limited repointing on Building 19. (255 days) BID ITEM 3, ALTERNATE NO.2: BASE BID AND ACCEPTANCE OF ALTERNATE 1, except delete full repointing on Building 7 and, instead, perform limited repointing on Building 7. (240 days) BID ITEM 4, ALTERNATE NO.3: BASE BID AND ACCEPTANCE OF ALTERNATE 1 AND ALTERNATE 2, except delete all work associated with Building 13. (220 days) BID ITEM 5, ALTERNATE NO.4: BASE BID AND ACCEPTANCE OF ALTERNATE 1, ALTERNATE 2 and ALTERNATE 3, except delete all work associated with Building 5. (195 days) BID ITEM 6, ALTERNATE NO.5: BASE BID AND ACCEPTANCE OF ALTERNATE 1, ALTERNATE 2, ALTERNATE 3, AND ALTERNATE 4, except delete limited repointing on Building 6 and, instead, provide reparative-only masonry work on Building 6. (180 days) | - | Solicitation | 08/18/2026 |
Exterior Wall Masonry Repair: The purpose of this project is to perform masonry remediation on the west-facing exterior wall of Building 1, G Section, 3rd Floor. The wall has experienced significant water intrusion due to a fully detached downspout that allowed rainwater to run down the façade, deteriorating the brick and mortar over multiple seasons. Repairs are required to restore the integrity of the building envelope and prevent ongoing moisture penetration. This project shall be completed within Forty-five (45) calendar days once NTP is issued. | - | Market Research | 11/09/2026 |
Procure Gutter Cleaning and Maintenance Services in support of Naval Weapons Station (NWS) Earle. Services are to be performed at Colts Neck and Leonardo, New Jersey. Amendment: Site Visit time has been changed from 11:00 am to 09:00 am EST. Day of the week updated to match the dates. CLIN 0007 period of perfromance updated. | - | Solicitation | 12/11/2026 |
The Central Virginia VA Health Care System is requesting loading dock concrete repair at the Richmond VA Medical Center (VAMC). The loading dock treads and risers are damaged and is a safety concern. Period of Performance: project should take approximately 90 days to complete. | - | Solicitation | 11/24/2026 |
Additional Details
Solicitation Number
EQPAAB-26-0003
Archive Date
Aug 4, 2026
Office Address
Washington, DC, 20405