Notice ID: 0f63df7cad41e6e08b3263c6bfd05673Combined Synopsis/Solicitation
Tiglax Vessel Engine Rebuild-Amendment #1
Archived on October 21, 2011. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 AM UTC+01:00
- Posted
- October 21, 2010
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of the InteriorUS FISH AND WILDLIFE SERVICE
Notice details
- Office
- FWS HEADQUARTERS
- Place of performance
- Homer, Alaska 99603 USA
- PSC
- J: MAINT, REPAIR, REBUILD EQUIPMENT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- F11PS00010
- Notice ID
- 0f63df7cad41e6e08b3263c6bfd05673
Description
This is Amendment #1 to combined synopsis/solicitation number F11PS00010. This amendment clarifies the parts to be replaced, as well as the parts that are to be cleaned, inspected, and if found acceptable to be reinstalled. This amendment also updates the Optional Line Items list. For contractor convenience, the pricing lines have been restated in this amendment. The contractor will provide all materials, labor, and tools necessary to rebuild the engines. REPLACEMENTThe contractor shall, at a minimum the following install new or remanufactured parts:-Gov/Fuel injector pump-Water pump-Oil pump-Cylinder heads-Turbo charger cartridge-Fuel transfer pump-Fuel jumper lines- Cylinder kits (i.e. pistons, connecting rods, piston rings, wrist pins, liners)-Vibration dampers-Engine gasket set-All seals and gasket kits-Main bearings-Rod bearings-Hour/service meter-Tachometer drive and adapters-Air fuel ratio control-Temperature regulators-Lifter locks-Lower timing gears In addition to the replacement parts list above the engine oil cooler (starboard main) also needs to be replaced. Unlike the list above, FWS will provide this particular part for the contractor to install. All other parts must be provided by the contractor. REUSE/REINSTALLClean, Inspect for wear and damage & reinstall if the parts meet with Caterpillar reusable guidelines. If a part does not meet Caterpillar reusable guidelines, it must be replaced. A modification to the contract will be completed to allow for this change. The following parts shall be cleaned, inspected, and if reuseable be reinstalled:Engine oil cooler (port main)-Aftercoolers-Cylinder blocks-Crankshafts-Camshafts-Cam bearings-Head bolts-Spacer plates-Rocker arms-Push rods-Fuel injectors-Upper timing gears-Advance timing unit-Marine gear oil cooler-Hand priming pump-Exhaust studs-After Cooler LINE ITEMS:Please provide a detailed price schedule for the following items: BASE LINE ITEMS Port Engine Rebuild:1.00 JOB $___________________ Starboard Engine Rebuild:1.00 JOB $___________________ Warranty:1.00 LS $___________________ OPTIONAL LINE ITEMS: Replace Port Engine Block: 1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Starboard Engine Block:1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Repair chockfast & align reduction gear 1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Engine oil cooler (port main)1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Aftercoolers1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Cylinder blocks1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Crankshafts1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Camshafts1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Cam bearings1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Head bolts1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Spacer plates1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Rocker arms1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Push rods1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Fuel injectors1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Upper timing gears1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Advance timing unit1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Marine gear oil cooler1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Hand priming pump1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace Exhaust studs1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days Replace After Cooler1.00 EA $___________________Extension of period of performance (additional days required to complete):________ Days All other terms and conditions hereby remain unchanged.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Christie VandenDries Contract Specialist 9077863415 christie_vandendries@fws.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
Documents
No documents available.
Lifecycle
Solicitation:
F11PS00010- Combined Synopsis
- 2×Combined SynopsisCurrentOct 18, 2010
Tiglax Vessel Engine Rebuild-Amendment #1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
F11PS00010
Archive Date
Oct 21, 2011