Notice ID: bdeb83ceedefbe4204a5ebefe9bc7be4Combined Synopsis/Solicitation
Design/Build Trailer Pads and Utilities at Eastern Massachusetts NWR Complex
Archived on February 12, 2015. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 PM UTC+01:00
- Posted
- December 22, 2014
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of the InteriorUS FISH AND WILDLIFE SERVICE
Notice details
- Office
- FWS HEADQUARTERS
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- F15PS00059
- Notice ID
- bdeb83ceedefbe4204a5ebefe9bc7be4
Description
AMENDMENT 000002-This amendment is issued to incorporate the following changes: In the attachments to this amendment is the locational map for proposed layout of RV pads, septic, utility pole for electric, and well, at the site. Also attached is the list of contractors that participated in the site visit on 12/19/2014. The following criteria for domestic water well are incorporated into the Performance Work Statement: - The well shall be capable of providing 15 gallons per minute (GPM) of potable drinking water. -The well casing size shall be 6 inches in diameter. - The well shall be drilled to an estimated depth of 250 linear feet below grade. - The well casing shall be installed to a depth of up to 100 feet. - The submersible well pump shall have the capacity to deliver 15 GPM. - The contractor shall keep an accurate log of drilling operations in the Daily Drilling Report. The date for receipt of proposals has been changed from: 1/7/2015 to: 1/28/2015. *THIS AMENDMENT MUST BE ACKNOWLEDGED PER BLOCK 11 OF THE STANDARD FORM 30 FORM*
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
F15PS00059- Pre-Solicitation
- Combined Synopsis
- Pre-SolicitationNov 25, 2014
Y--Design/Build RV Trailer Pads at the Eastern MA NWR Complex, Sudbury, MA
- 3×Combined SynopsisCurrentDec 9, 2014
Design/Build Trailer Pads and Utilities at Eastern Massachusetts NWR Complex