GovChime

F16AN_APG_68_Radar_NSN5998012885420_PN_762R656G01

Overview

Response deadline
12:00 AM EST
Posted
February 4, 2026
Notice type
Sources Sought
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8122 AFSC PZAAB
Place of performance
S Coffeyville, Oklahoma, 73145
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Notice ID
2f055b5a51d94423a819acd28f7f94e5

Description

 5420
P/N: 762R656G01
Noun: RF Monitor
Application: F-16 C/D APG-68 Dual Mode Transmitter
4 May 2015 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this RF Monitor.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman (97942) drawings 762R656G01 and T803A77. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawings 762R656G01 and T803A77. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 762R656G01, T803A77. This article shall be subjected to a form,
REPAIR QUALIFICATION REQUIREMENTS
NSN: 5998-01-288-5420
P/N: 762R656G01
Noun: RF Monitor
Application: F-16 C/D APG-68 Dual Mode Transmitter
4 May 2015 Section C 2/3
fit, and function evaluation to demonstrate compatibility with the weapon system and to
evaluate the repair capability of the offeror. Offerors will be notified whether or not their
qualification article passed or failed the required qualification testing within 90 days of
submitting a product for qualification testing. Note that successful completion of the
qualification testing does not guarantee any contract award. If the offeror is deemed qualified
and awarded the contract, a post-contract award first article exhibit may be required to verify
production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation,
which will be incurred by the potential offering party to become qualified are $5700.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity
that completion of this qualification effort should require 180 days. This is based on complexity
of the RF Monitor and other factors.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have
considered an offer for a contract if the offeror can demonstrate to the satisfaction of the
contracting officer that the offeror (or its product) meets these standards for qualification or can
meet them before the date specified for award of the contract. The award will not be delayed
to provide the vendor with an opportunity to demonstrate its ability to meet the standards
specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to
be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements
stated, in writing, in the qualification requirement before the date specified for award of the
contract. Once all requirements are met, the offeror will be listed as an approved repair source
for this item. Approval, however, does not guarantee subsequent contract award.
REPAIR QUALIFICATION REQUIREMENTS
NSN: 5998-01-288-5420
P/N: 762R656G01
Noun: RF Monitor
Application: F-16 C/D APG-68 Dual Mode Transmitter
4 May 2015 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: NA
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.
g. QWC7: NA

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • RDL 012885420.pdf

    65 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    F16AN_APG_68_Radar_NSN5998012885420_PN_762R656G01

    Notice 2f055b5a51d94423a819acd28f7f94e5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
******EXTENDED SOLICITATION DUE TO NO RESPONSE******** This is a combined synopsis/solicitation notice for the procurement of Preventative Maintenance services for Arc Spark Optical Emissions Spectrometer. This is for one (1) Base year and four (4) Option years. FOB Destination is Tinker AFB OK.
-Combined Synopsis11/18/2026
The Government is seeking to identify qualified and capable contractors for the U.S. Air Force E-7 Capability Assessment. The Air Force is conducting market research to identify companies capable of providing a suite of training devices for the new E-7 Wedgetail aircraft, which is set to replace the E-3. The government is seeking information on the development, delivery, and support of two Virtual Maintenance Trainers (VMTs). This is for planning purposes only and is not a formal request for proposals. Please see the attached RFI for additional information.
-Market Research12/06/2026
12 Nov 26 Amendment 11 was issued to extend the proposal due date to 20 Nov 26. All other terms and conditions remain unchanged. 10 Nov 26 Amendment 10 was issued to revise Solicitation Attachment 4, Section 8.3. The conformed solicitation, incorporating Amendments 01 through 10 is available. All amendments need to be signed and submitted with proposals. Proposal due date will not be extended. 09 Nov 26 Amendment 09 was issued to update Solicitation attachments 3A and 3B. The conformed solication, incorporating Amendments 01 through 09, will be available later today. All amendments need to be signed and submitted with proposals. Due to the changes with Amendment 09, proposals due date has been extended to 18 Nov 26 at 12:00pm CDT. Revised: A conformed copy of Solication FA8105-26-R-B001 to include all amendments has been added. 23 Oct 26 Amendment 08 was issued to update CLINs 0001 and all subCLINs, 0002, and 0003. Attachments 1, 3A/3B, and 4 were also updated. The conformed solication, incorporating Amendments 01 through 08, is now available. All amendments need to be signed and submitted with proposals. Due to the changes with Amendment 08, proposals due date has been changed to 16 Nov 26 at 12:00pm CDT. 07 Oct 26 Amendment 07 was issued to incorporate the attachments inadvertently left off from Amendment 06. The proposal due date remains 09 Nov 26. The conformed solicitation, incorporating Amendments 01 through 07, is now available. All amendments need to be signed and submitted with proposals. Amendment 06 was issued to correct a clerical error on the previous amenment, revised H001 and updated attachemnts 3A and 3B to the soliciation. 01 Oct 26 Amendment 05 was issued to revised paragraphs 13.5 and 13.14 of the SOW, Add Clause H005 and remove RFO clause 52.246-17 from the solicitation. Due to these changes, the proposal due date is extended to 09 Nov 26 at 12:00pm CDT. 17 Sept 26 The conformed contract, incorporating Amendments 01 through 04, is now available. 03 Sep 26 Amendment 04 was issued with minor corrections to Attachment 1 Statement of Work and Attachments 3a/3b to correct some links in the pricing matrixes. The proposal due date remains 02 Nov 26. 31 Aug 26 Amendment 03 issued with a revised Attachment 2 SRD, Attachment 3a Pricing Matrix, and removal of Clause H005. Solicitation Due date changed to 02 Nov 26 at 12:00pm CST. 24 Aug 26 Editable PDF versions of the previously released Solicitation and Amendments are available. All other terms and conditions remain unchanged and in full force and effect. Reminder, the Solicitation and Amendments must be signed and included with the proposal submission. 12 August Amendment 02 to revise documents as a result of Q&A. 28 Jul 26 Amendment 01 to revised documents as a result of Q&A. 10 Jul 26 Center Console Refresh addresses critical obsolescence issues within the KC-135 Refueling Tanker aircraft. The US Air Force needs an updated Fuel System (FS), Flight Display System (FDS), and Flight Computer due to obsolescence and is looking for innovative ideas to not only replace but improve these systems with turn-key solutions enabling supportability and future growth. The FS, FDS, Flight Computer, and the future growth/adaptability define the scope of the CCR program. The program scope also includes the addition of autothrottle systems. The anticipated contract will be a Cost-Plus Incentive Fee (CPIF) for EMD, Firm Fixed Price (FFP) for Production and Deployment (P&D), single award indefinite delivery/quantity type contract comprised of One (1) 48-month Base Period with Six (6) 1-Year Option Periods and a projected period of performance from July 2028 to June 2038. To request access to view-controlled documents on SAM.gov, you must have a role assigned in SAM.gov. Government personnel cannot assist with assigning roles. If you are unable to view the controlled documents, you will need to contact SAM.gov for assistance. Once your role has been assigned, submit a request to view the documents and ensure you include your company’s CAGE code. Failure to provide the CAGE code will delay your access request. Access to controlled documents will be granted only if your company has an active DD2345 is on file through the JCP website, https://www.public.dacs.dla.mil/jcp/ext/. If a DD2345 is not found or is inactive, it must be updated and active before access can be approved *Section 3.27.3 of the SRD will be updated at the next formal revision change to align with SOW Sections 2.2 and 13.4.3.
-Solicitation11/20/2026
This is a combined synopsis/solicitation (CSS) for commercial items prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA813927Q0005 is issued as a request for quotation (RFQ) for the supplies in the table within the attached Combined Synopsis Solicitation (CSS) - FA813927Q0005 document. This acquisition is single source. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The Air Force Sustainment Center’s Maintenance Contracting Branch (AFSC/PZIMB, 3001 Staff Dr, Tinker AFB, OK 73145-3303) at Tinker Air Force Base, Oklahoma, intends to award a single Firm Fixed Price (FFP) contract. This acquisition is a single-source requirement for specific brand-name-only products. The single source vendor is B&M Distribution, Inc. (CAGE: 5M3Y2) on the basis of 6.103-2 Unusual and compelling urgency. Please review the entirety of the CSS document before submitting your response.
-Combined Synopsis11/16/2026
Please see soliciation and its' attachments. **Solictation admendment posted on 10 November 2026 **
-Solicitation11/19/2026

Additional Details

Solicitation Number

F16AN_APG_68_Radar_NSN5998012885420_PN_762R656G01

Archive Date

Jan 14, 2028

Office Address

TINKER AFB, OK, 73145-3303