GovChime
Notice ID: a07e4e7a5816705666a472997cdfb9fcAward NoticeAwarded

Z--Alarm System Upgrade at Craig Brook NFH

Awarded on June 23, 2016. Full description on SAM.gov.

Awarded tounder F16PC00088 (source: SAM.gov award notice)• $177.8K

Overview

Posted
June 23, 2016
Notice type
Award Notice
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of the InteriorUS FISH AND WILDLIFE SERVICE

Notice details

Office
FWS HEADQUARTERS
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Jun 23, 2016
Award amount (SAM.gov award notice)
$177.8K

Identifiers

Solicitation number
F16PS00220
Notice ID
a07e4e7a5816705666a472997cdfb9fc
Award number (PIID)
F16PC00088

Description

IGF::OT::IGF Alarm System Upgrade at Craig Brook NFH

Full description on SAM.gov

Award Overview

Award Number

F16PC00088

Award Amount (SAM.gov award notice)

$177.8K

Award Date

Jun 23, 2016

Awardee

Awardee UEI

LNDKYL3PNHT4

Original Solicitation

Notice ID: a07e4e7a5816705666a472997cdfb9fc

Posted Date: Jun 23, 2016

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Murphy, Christopher

Documents

No documents available.

Lifecycle

Solicitation:F16PS00220
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 7×
    Pre-SolicitationFeb 3, 2016

    Z--Hatchery Alarm System Upgrade at Craig Brook NFH

    Notice 97983405496b062235ba093edccf5c7c on SAM.gov

  2. SolicitationMay 26, 2016

    Z--Hatchery Alarm System Upgrade at Craig Brook NFH

    Notice 2f136db198fbed9b271c2ba5c9d5e29b on SAM.gov

  3. AwardedCurrentJun 23, 2016

    Z--Alarm System Upgrade at Craig Brook NFH

    Notice a07e4e7a5816705666a472997cdfb9fc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
FIRE ALARM SYSTEM UPGRADE.
82%
AwardedOpen
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004……..
81%
Solicitation12/01/2026
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in West Roxbury, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC West Roxbury campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, and associated interfaces. The existing EST-3 platform is aged and obsolete. The Government requires an in-kind/successor-platform migration from Edwards EST-3 to Edwards EST-4 to improve system reliability, maintainability, cybersecurity posture, and code compliance while preserving operational continuity and minimizing disruption to an occupied healthcare campus. The existing SIGA series field devices are expected to remain in place and are understood to be compatible with the EST-4 platform. Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC West Roxbury campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing West Roxbury campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, fiber, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing and cutover activities. The NAICS code for this requirement is 238210. The VAMC West Roxbury campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the West Roxbury fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the West Roxbury FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.
72%
Special Notice10/16/2026
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC Brockton campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, remote annunciation, sprinkler and control point reporting, notification appliances, and associated interfaces. The existing EST-3 platform is aged and obsolete. Place of Performance: 940 Belmont Street, Brockton, MA Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC Brockton campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, infection-control, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing Brockton campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, the VA fiber contractor if applicable, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, fiber-demarcation coordination, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, audio/visual devices, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control, or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Brockton Fiber Coordination and Network Stability Review the existing FACP node fiber terminations and identify any fiber-demarcation conditions that could affect EST-4 network stability. Coordinate with the VA and VA fiber contractor regarding local demarcation panels adjacent to each FACP, fiber patch cords within each panel enclosure to each FACP, and any other fiber remediation recommended before or during EST-4 cutover. Document any fiber-related deficiencies, risks, or recommended actions discovered during planning or cutover. Fiber-related costs, fiber installation, fiber remediation, and third-party fiber contractor work are excluded unless separately authorized. Do not proceed with final cutover of affected FACP nodes where identified fiber conditions create an unacceptable risk of network instability unless the VA approves the risk mitigation or sequencing plan. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. Fire watch is excluded from the base proposal unless separately authorized. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Contractor Qualifications Contractor personnel performing programming, installation, testing, and troubleshooting shall be factory trained and qualified for Edwards EST-3/EST-4 fire alarm systems and FireWorks integration, as applicable. Contractor shall provide proof of certifications and qualifications for personnel performing system programming and acceptance testing upon request. Contractor shall comply with VA access, identification, background, safety, infection control, and work notification requirements. Contractor shall provide personnel, tools, test equipment, ladders/lifts, programming equipment, and manufacturer software/hardware required for the work. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. Overtime is excluded from the proposal unless included in the final award or separately authorized. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing, fiber-demarcation coordination, and cutover activities. The NAICS code for this requirement is 238210. The VAMC Brockton campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The proposal recommends that the VA fiber contractor provide local demarcation panels adjacent to each FACP with patch cords into each FACP enclosure. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the Brockton fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the Brockton FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC dba Encore Fire Protection / Encore Fire Protection is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.
72%
Special Notice10/16/2026
THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME. The Naval Facilities Engineering Command, Mid-Atlantic is seeking eligible Small Businesses, HUBZone Small Businesses, Small Disadvantaged Businesses, Veteran-Owned Small Businesses, Service-Disabled Veteran-Owned Small Businesses, and Women-Owned Small Businesses capable of performing design-bid-build (DBB) construction services for project RM 7-01, Building 1029, at the Naval Foundry and Propeller Center, NAVSUPPACT Mechanicsburg, Pennsylvania (DET Philadelphia Navy Yard (PNY) Annex, Philadelphia, PA. The purpose of this project is to repair the existing electrical system in Building 1029 at the Naval Foundry and Propeller Center (NFPC), to provide a safe, environmentally controlled work area. Building 1029 is a 90,180 SF high bay industrial facility that was constructed in 1979. It is the inside machine shop for the Naval Foundry and Propeller Center and is responsible for the milling of all sizes of propellers for surface ships and submarines. Building 1029 equipment includes propeller profilers, PROMS (Propeller Robotic Optical Milling System), and various others milling machines, lathes, saws and grinders in support of the propeller manufacturing operations. These large profilers can mill propellers up to 24 feet in diameter and require a controlled environment to maintain milling tolerances. This project will repair the existing HVAC system and the installation of Air Conditioning in the High Bay of Building 1029. These repairs, replacements and equipment additions will improve the workplace environment inside the machine shop of Building 1029 at the NFPC with improved heating and ventilation to support ship and submarine propeller manufacturing and shall meet the operational requirements of manufacturing propellers within the specified temperature range to maintain its’ critical tolerance level for the future profilers to be located in the central bays of Building 1029. This Project will also replace the low voltage 480V aluminum cables with copper wiring between the substation and various power panels. In addition, all aluminum conductors from distribution panel boards to subpanels and associated transformers will be removed and replaced with copper conductors. New circuits will also be provided for the new equipment, and smoke detectors, with required fire alarm system interfacing in compliance with National Fire Protection Association (NFPA) requirements. Lastly, this project scope will also include the removal of abandoned steam lines and asbestos-containing and other hazardous materials. The work on this project must be performed in such a manner to prevent the equipment and operations housed within Building 1029 to not be visible when the replacement work is performed. The Contractor must coordinate with the Naval Foundry and Propeller Center to establish a construction phasing and sequence of construction which will meet the user requirements for continued operation and result in the least amount of disruption to the propeller shop operations and in a manner which would allow the Contractor to complete the work to achieve these requirements. Due to the layout of the equipment within the building and continued operation of the existing cranes within the building, construction of scaffolding or work platforms within the building is not feasible. The building must remain operational during all work of this project due to the nature of the propeller shop activities, work schedule which must be maintained and 24/7 shift work hours. Equipment will be allowed to be taken off-line for scheduled time frames as the work schedule/flow allows providing areas to allow overhead work to be performed. This will result in work phasing requirements. A work phasing sequence plan shall be established in coordination with the user. The Contractor will be required to follow this sequence of work indicated. The user, through the Contracting Officer Representative (COR), will be allowed to alter the sequence and direct the Contractor to work in a different area, based on scheduled equipment use. All use of Contractor supplied and utilized cranes, lifts, and booms must be coordinated with the COR, NAVFAC MIDLANT, and the Navy Crane center thru the COR. Any use of cranes, lifts or booms within the building must be transparent to the operation of the building user operations. The Contractor will not be allowed to utilize the existing bridge cranes within the building. Building 1029 is a restricted entry building located at the Navy Yard, Philadelphia, PA. Contractors must employ United States citizens and the Contractor must obtain CONFIDENTIAL Clearance for all personnel working in Building 1029. The company must first obtain clearance, and then all employees must obtain CONFIDENTIAL Clearance. Contract Clause FAR 52.204-2, Security Requirements and Alternate II, FAC 5252.236-9301, Special Working Conditions and Entry to Work Area, applies. Contractor personnel and other personnel associated with the Contractor in performing the work specified under this contract work must comply with the security requirements and classification of this procurement as indicated in Form DD 254. The appropriate Northern American Industry Classification System (NAICS) code for this procurement is 238210 – Electrical Contractors and Other Wiring Installation Contractors, and the Small Business Size Standard is $15,000,000. In accordance with FAR 36.204, the magnitude of construction for this project is between $5,000,000 and $10,000,000. The contract will include FAR clause 52.219-14 Limitations on Subcontracting, which states that “The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.� This office anticipates award of a contract for these services by May 2017. It is requested that interested small businesses submit to the Contracting Officer a capabilities package, to include the Sources Sought Contractor Information Form, Sources Sought Project Information Form and Sources Sought Project Matrix, provided as attachments to this notice. The Sources Sought Project Information Form and Sources Sought Project Matrix shall be used to document a minimum of three (3) and up to a maximum of five (5) relevant construction projects completed in the past five (5) years that best demonstrate experience on projects that are similar in size, scope and complexity to the project described herein. A relevant project is further defined as: Size: Final construction cost greater than five million dollars ($5M). Scope: Construction or renovation of an industrial manufacturing facility or technical research center with major mechanical and electrical system upgrades, including HVAC and lighting. Complexity: Phased building construction activities where the facility remaining occupied during construction. Ensure that the project description clearly identifies whether the project is new construction or renovation, provides the square footage and final construction cost, and addresses how the project meets the scope/complexity requirements. Please note that if you are responding as an 8(a) Mentor-Protégé, you must indicate the percentage of work to be performed by the protégé. A copy of the SBA letter stating that your 8(a) Mentor-Protégé agreement has been approved would be required with your proposal, if requested. This notice is a market research tool being used to determine the availability and adequacy of potential small business sources prior to determining the method of acquisition and ultimate issuance of a solicitation. Upon review of industry response to this sources sought notice, the Government will determine whether set-aside procurement in lieu of full and open competition is in the Government’s best interest. Large business submittals will not be considered. The Government is not obligated to and will not pay for any information received from potential sources as a result of this notice. The information provided in this notice is subject to change and in no way binds the Government to solicit for or award a contract. The Government will not provide debriefs on the results of this research, but feedback regarding the decision to set aside or not set aside the procurement will be accomplished via pre-solicitation synopsis or solicitation for these services, as applicable. All information submitted will be held in a confidential manner and will only be used for the purpose intended. Points of contact listed may be contacted for the purpose of verifying performance. RESPONSES ARE DUE NLT 06 January 2017 at 2:00 PM (EST). LATE SUBMISSIONS WILL NOT BE ACCEPTED. The package shall be sent via electronic mail to Brett Garnett at brett.garnett@navy.mil Attachments are limited to a total of 5MB.
72%
Market ResearchOpen

Additional Details

Solicitation Number

F16PS00220

Archive Date

Jul 8, 2016