GovChime
Notice ID: 7d3301d06ad14e1bba8317006781b6ffSources Sought

7 AF Network Infrastructure Upgrade *Market Research*

Archived on June 10, 2026. Original response deadline: . Full description on SAM.gov.

Description

*Disclaimer* To receive this requirement contractor must have an active Secret/NOFORN clearance.

 This requirement is for upgrading the network infrastructure serving Building 933 at Osan Air Base. The intent is to provide a complete, tested, labeled, and documented fiber and copper horizontal distribution system. The fiber solution begins at new fiber optic distribution panels (FODPs) with LC termination points and extends to end-user outlet locations with LC keystone-style connections installed in faceplates. The copper solution begins at new copper patch panels in the designated IT rooms and extends to end-user outlet locations with Category 6 (CAT6) RJ45 keystone connections installed in faceplates. 

The Contractor shall furnish all labor, materials, supervision, tools, test equipment, pathway components, cabling, terminations, patch panels, keystones, faceplates, labeling, documentation, and incidentals required to install the new fiber optic and copper CAT6 infrastructure. The completed work shall support Government acceptance testing and turnover to USAF Communications Squadron staff and 7 AF/A6. All work shall be performed in accordance with applicable DoD, USAF, and host nation policies within this SOW, ensuring compliance with security, safety, and communications infrastructure standards. 

To request the SOW and the drawings, please e-mail your request to the points of contact, with the neccessary documentation that shows clearance requirements.

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:F3J6AF 7 AF
Posted:May 20, 2026
NAICS:238210: Electrical Contractors and Other Wiring Installation Contractors
Last Updated:Aug 21, 2026
PSC:5995: CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT
Set-Aside:No Set aside used
Type:Sources Sought
Place of Performance:Osan AB, Gyeonggi

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Capt Jerred Sevold

Documents

No documents available.

Lifecycle

Solicitation:F3J6AF26SS001
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentMay 20, 2026

    7 AF Network Infrastructure Upgrade *Market Research*

    Notice 7d3301d06ad14e1bba8317006781b6ff on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

F3J6AF26SS001

Archive Date

Jun 10, 2026

Place of Performance Country

KOREA, SOUTH

Office Address

APO, AP, 96278