GovChime
Notice ID: d9d329a18ee846cc8080a7046958955eSources Sought

FORCE Subsystem Hoses

Archived on April 19, 2026. Sources Sought posted by DEPT OF DEFENSE (DEPT OF THE AIR FORCE) on March 31, 2026. Solicitation F3ST706062AF01.

NAICS 333914 (Measuring, Dispensing, and Other Pumping Equipment Manufacturing). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: Holloman Air Force Base, New Mexico. Original response deadline: . Full description on SAM.gov.

Description

1. This is a Sources Sought Synopsis for market research purposes only, issued by the U.S. Air Force. This is not a Request for Quotation (RFQ) or a Request for Proposal (RFP). The Government is seeking to identify qualified business sources, particularly small businesses, capable of providing the National Stock Number (NSN) items listed below, which must be compliant with Military Performance Specification MIL-PRF-370J.

2. The Government requires the following items. The listed Original Equipment Manufacturer (OEM) part numbers are provided for reference only to describe the form, fit, and function of the required items. The definitive requirement is the National Stock Number (NSN) and its compliance with the stated military specification.

16x Reel Assembly, Hose/250' X 6" Collapsible/Part #88206002ER3000DURO/NSN: 4720-01-653-3554/MIL-PRF-370J, Type C


44x Reel Assembly, Hose/500' X 6" Collapsible/Part #0421-40-1090-01 NSN: 4930-01-647-3040/MIL-PRF-370J, Type C


15x Hose Assembly, Nonmetallic/25' X 4" Hard/Part #M370B091A0250A NSN: 4720-00-705-9542/MIL-PRF-370J,Type B


4x Hose Assembly, Nonmetallic/20' X 3" Hard/Part #M370B081A0200A NSN: 4720-01-547-3013/MIL-PRF-370J,Type B


40x Hose Assembly, Nonmetallic/12' X 6" Hard/Part #M370B101A0120A NSN: 4720-01-547-1820/MIL-PRF-370J, Type B

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:AIR EDUCATION AND TRAINING COMMAND.FA4801 49 CONS PK
Posted:March 31, 2026
NAICS:333914: Measuring, Dispensing, and Other Pumping Equipment Manufacturing
Last Updated:Aug 21, 2026
PSC:4320: POWER AND HAND PUMPS
Response Deadline:
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Sources Sought
Place of Performance:Holloman Air Force Base, New Mexico, 88330

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:F3ST706062AF01
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentMar 31, 2026

    FORCE Subsystem Hoses

    Notice d9d329a18ee846cc8080a7046958955e on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Awarded333914No Set-Aside10/01/2026Open0, OK
This contract was awarded as a Firm-Fixed Price, 100% Small Business Set Aside. Extensive market research determined that there were a reasonable amount of small business entities capable and interested in fulfilling this requirement.
Awarded333310Total Small Business Set-Aside10/14/2026OpenHolloman Air Force Base, NM
The U.S. Army Corps of Engineers, Wilmington District is requesting two new pumps for the sump at John H. Kerr Powerhouse, two new pumps for the John H. Kerr Powerhouse dam sump, and three pumps for the sump at Philpott Powerhouse. The intent is to replace the existing pumps with pumps that perform in the same way as the existing pumps meeting the specifications within the attached Statement of Work. The resulting award issued from this request will result in one award.
Solicitation333914Total Small Business Set-Aside10/01/202610/13/2026Boydton, VA
The U.S. Army Corps of Engineers, Wilmington District is requesting two new pumps for the sump at John H. Kerr Powerhouse, two new pumps for the John H. Kerr Powerhouse dam sump, and three pumps for the sump at Philpott Powerhouse. The intent is to replace the existing pumps with pumps that perform in the same way as the existing pumps meeting the specifications within the attached Statement of Work. The resulting award issued from this request will result in one award.
Solicitation333914Total Small Business Set-Aside09/17/202610/02/2026Boydton, VA
** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference: Packaging - Attachment 15 Question(s) 1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere? 2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D? The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I’m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump. If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173. 3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant.” I’m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn’t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract. *** Amendment 0005 is issued to extend the proposal due date out to 16 Oct 2026, change the FOB point from Origin to Destination for the production CLINs, revise the Section C Statement of Work (SOW) to remove references to Provisioning, Publications, and Technical Manuals, revise the list of addenda and attachments in Section J, remove select CDRLs and attachments as required, add a CDRL for a Commercial Off-the Shelf (COTS) Operator's Manual in Section J for government review prior to approval, and add/delete or update any clauses or provisions as required (especially due to the revolutionary FAR overhaul). *** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Destination Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business Set­Aside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of packaging data, safety/security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 7 CDRLs and 7 attachments that support the CDRLs. Thoroughly review the solicitation document and amendments for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****
Solicitation333914Total Small Business Set-Aside09/14/202610/16/2026-

Additional Details

Solicitation Number

F3ST706062AF01

Archive Date

Apr 19, 2026

Office Address

HOLLOMAN AFB, NM, 88330-8225