GovChime
Notice ID: f703d0a7e0a44e95ba081494e2df48e4Combined Synopsis/Solicitation

25 KVA POLE MOUNT TRANSFORMER

Responses closed . Full description on SAM.gov.

Description

Amended to change NAICS code from 423610 to 335311. 25 KVA POLE MOUNT TRANSFORMER

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
Posted:April 23, 2026
NAICS:335311: Power, Distribution, and Specialty Transformer Manufacturing
Last Updated:Oct 28, 2026
First published:
Last updated on SAM.gov:
PSC:6120: TRANSFORMERS: DISTRIBUTION AND POWER STATION
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Combined Synopsis/Solicitation
Place of Performance:Delivered to: McAlester Army Ammunition Plant1 C-Tree RdMcAlester, OK 74501, 74501

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    25 KVA POLE MOUNT TRANSFORMER

    Notice 525666b6fa3d434dadf405ff6ac1c942 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCurrent

    25 KVA POLE MOUNT TRANSFORMER

    Notice f703d0a7e0a44e95ba081494e2df48e4 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
1000 KVA TRANSFORMER
Combined Synopsis335311Total Small Business Set-Aside09/23/202609/30/2026-
Pad Mount Transformer
Combined Synopsis335311Total Small Business Set-Aside08/25/202608/31/2026-
Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?� inches (up to 64?� inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: �2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.
Combined Synopsis335311Total Small Business Set-Aside07/22/202607/29/2026-
Pad Mount Transformer
Combined Synopsis335311Total Small Business Set-Aside03/11/202603/30/2026-
75 KVA DRY CELL TRANSFORMER
Combined Synopsis335311Total Small Business Set-Aside03/04/202603/11/2026-

Additional Details

Solicitation Number

W911S226U3090

Archive Date

Apr 23, 2027

Office Address

FORT DRUM, NY, 13602-5220