GovChime
Notice ID: 6e1c48de53f2434fada8e6c457427a40Solicitation

Repair Backup Generator Building 423, Patrick Space Force Base, Fl

Archived on August 24, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM UTC−04:00
Posted
September 19, 2022
Notice type
Solicitation
Set-aside
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA2521 45 CONS PK
Place of performance
Patrick AFB, 32925
Last updated
Sep 25, 2026

Identifiers

Solicitation number
FA252122B0010
Notice ID
6e1c48de53f2434fada8e6c457427a40

Description

The requirement is for the contractor to provide all labor, equipment and materials to remove/replace the existing generator and circuitry supplying power to Command Post located in the Building 423 mechanical room, Patrick SFB, FL. The contractor is to provide the government with a complete and usable facility in accordance with the Project Drawings and Specifications.This is a solicitation for a Firm-Fixed-Price Construction Contract for Space Launch Delta 45, Patrick Space Force Base, FL. Brand name: Cummins. NAICS: 237130 Power and Communication Line and Related Structures Construction with size standard of $39.5 M. The Magnitude of this project is between $250,000 and $500,000 (In accordance with FAR 36.204). THIS ACQUISITION IS BEING ISSUED AS A WOMEN OWNED SMALL BUSINESS SET ASIDE (WOSB). OFFERORS NOT MEETING THIS CRITERIA WILL BE DEEMED NONRESPONSIVE AND INELIGIBLE FOR AWARD. Notice to Offerors: Funds are not presently available for this project. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. The Government reserves the right to cancel this invitation for bid, either before or after the closing date. In the event the Government cancels this invitation of bid, the Government has no obligation to reimburse an offeror for any costs.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:FA252122B0010
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 13, 2022

    Repair Backup Generator Building 423, Patrick Space Force Base, Fl

    Notice 6f33cb8abbcb4fd883ff8630bfcadc19 on SAM.gov

  2. 7×
    SolicitationCurrentJul 5, 2022

    Repair Backup Generator Building 423, Patrick Space Force Base, Fl

    Notice 6e1c48de53f2434fada8e6c457427a40 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. Please note that while Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The U.S. Air Force 377th Contracting Division has a requirement to execute the construction and technical redesign requirements for the demolition of three substations and new construction of two upgraded substations. The services requested will include new 12.47 kV distribution systems. The primary purpose and objective of these projects are to rapidly upgrade the existing infrastructure, meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. The Government is evaluating the feasibility of executing these requirements under one award via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. Summaries of projects for this acquisition strategy are as follows: - MHMV200009 – Repair Substation 9 and Feeders: The primary objective of the Repair Substation 9 and Feeders project is to design and construct a fully operational, modern power distribution asset, upgrading the existing infrastructure to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. This goal will be achieved by establishing the new substation facility within a defined 100ft x 150ft footprint directly south of the existing location, and installing all-new substation components, security fencing, distribution poles, switching gear, and conductors. The project also aims to complete the systematic teardown and removal of all retired infrastructure to restore the original site. - MHMV 120009 – Remove Substation 23 & Connect Loads to Substation 24A Feeder 5: The project entails the design and construction services required to remove Substation 23 & connect loads to Substation 24A Feeder 5 located on KAFB. The primary purpose and objective of this project is to upgrade the existing infrastructure of Substation 24A Feeder 5 to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. - MHMV080002 – Demo Substation 3, Rebuild Substation 10 and Distribution System: The primary goal of the Demo Substation 3, Rebuild Substation 10 and Distribution System project is to safely decommission and demolish Substations 3 and 10 and design, construct, and commission a modern, consolidated Substation 10 rated at 10,000 KVA (10/12/14 MVA). This infrastructure upgrade will replace aged, unserviceable assets with a resilient, high-capacity substation and an underground distribution backbone designed to eliminate single points of failure and modernize base electrical infrastructure. Included in this notice are the attachments of the Scope of Services with technical documents for more detailed information on the nature of the work. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy. Please limit your responses to no more than 5-pages addressing the following questions – - Company Profile: Business Name Address Point of Contract (Name, Title) Phone Number Email Address Cage Code & UEI - Relevant Experience: Please provide your relevant experience as it relates to performing multiple project in similar size, scope, and complexity to this requirement. Summarize performance clearly and factually, along with project locations and the projects customer(s). Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feed-back received will be handled as public market research to shape the Government's final acquisition approach. - Feedback on the Acquisition Strategy & Alternatives: OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Please submit your responses to the Government Point of Contact listed below by the response date listed.
-Market Research11/19/2026
The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps.
-Market Research10/30/2026
This is the official solicitation for the Interim Cargo Facility Fences requirement at Tyndall Air Force Base, FL. This will be a single award, firm-fixed price contract. This requirement is being solicited as a 100% Women-Owned Small Business (WOSB) Program set aside. The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The contractor shall perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions. All work shall be accomplished in accordance with contract documents and most recent Federal and State regulations. The North American Industry Classification System (NAICS) code 238990 will apply to this acquisition. The size standard for this NAICS code is $19.0M. The estimated period of performance is for 90 calendar days after notice to proceed. All work shall be in strict compliance with the specifications of the contract. The successful offeror will be selected using Best Value Trade-Off procedures. Once the solicitation is posted, interested parties are advised to review this site frequently for any updates and/or amendments to any and all documents. The entire RFP will be made available only on the PIEE Solicitation module. Potential offerors are responsible for monitoring this site for the release of this document and subsequent amendments. To be eligible for contract award, offerors must be registered and marked active in the System for Award Management (SAM). If necessary, register via the SAM website www.sam.gov. Interested contractors are encouraged to submit their contact information by registering as an interested vendor. Any questions regarding this notice should be directed to the 325th Contracting Construction Flight at felicia.freche.1@us.af.mil or koby.trotter@us.af.mil. Refer to Attachment 1 - Section L and M for details on site visit, RFIs, proposals, and evaluation factors and ratings.The purpose of amendment 0001 is to:- Change the Site Visit date from 28 August 2026 at 9:30 AM CDT to 31 September 2026 at 9:30 AM CDT. - Change the Question due date from 1 September 2026 to 2 September 2026. - Change the Proposal due date from 10 September 2026 to 11 September 2026 at 1:00PM CDT. The purpose of amendment 0002 is to post RFI answers.
-Solicitation09/11/2026
*** Amendment 0002 has been issued, extending proposals due date to 20 August 2026 at 09:00 AM PST*** ***Site Visit Sign In Sheet and Updated Wage Determinations are posted. See Amendment 0001 for details*** PROJECT TITLE: DDJC CENTRALIZED GAS AND ELECTRIC METERINGPROJECT LOCATION: TRACY, CALIFORNIATHE USACE SACRAMENTO DISTRICT (SPK) HAS A REQUIREMENT FOR DESIGN, FURNISH AND INSTALL OF THE NEW ADVANCED ELECTRIC AND NATURAL GAS METERS AND A CENTRALIZE UTILITY MONITORING STATION AT DEFENSE DISTRIBUTION DEPOT SAN JOAQUIN (DDJC) TRACY, CALIFORNIA. THIS REQUIREMENT CONSISTS PRIMARILY OF STANDARD ELECTRICAL CONSTRUCTION, CONDUIT INSTALLATION, AND THE INTEGRATION OF COMMERCIAL-OFF-THE-SHELF (COTS) METERING EQUIPMENT. THE INSTALLED COTS HARDWARE WILL POSSESS NATIVE, BUILT-IN CAPABILITIES TO OUTPUT STANDARD FORMAT DATA TO A LOCALIZED STATION, ALLOWING FACILITIES STAFF TO MONITOR ROUTINE USAGE AND VERIFY EQUIPMENT FUNCTIONALITY.NAICS: 237130SMALL BUSINESS ADMINISTRATION (SBA) SIZE STANDARD: $45 MILLIONSET-A-ASIDE: WOMEN OWNED SMALL BUSINESSES (WOSB)
-Solicitation08/20/2026
Amendment 0007: Incorporate Government responses to Requests for Information (RFIs) into solicitation. Amendment 0006: Incorporate commissioning requirement(s), revised RFP Sections in Parts 2, 3, and 5; extend Requests for Information (RFI) due date and incorporate Government responses to RFIs. Amendment 0005: Incorporate FAR 52.217-4, an updated Wage Determination, and PIEE Solicitation Module Vendor Access Instructions into the solicitation. Amendment 0004: Incorporate Government responses to Requests for Information (RFIs). Amendment 0003: Incorporate Government responses to Requests for Information (RFIs), and extend RFI due date. Amendment 002: Extension of RFI due date and incorporation of updated Wage Determination. Amendment 001: Provision of Site Walk Attendance Sheet CLIN 0001 (FFP): This is a Firm Fixed-Price (FFP) Design-Build (DB) construction project involving partial demolition and replacement of three (3) unit substations (T6, T7, and T9), medium voltage conductors, and low voltage associated components between the transformers and switchboards in Building 234 at Naval Support Activity Monterey (NSAM) ? Halligan Hall. CLIN 0002 (FFP): Optional Item One (1) - Install a spare 5-inch conduit from Manhole 8 to the new Building 234 substation. CLIN 0003 (FFP): Optional Item Two (2) - Provide and install new distribution switchboards, including circuit breakers.
-Solicitation03/29/2023

Additional Details

Solicitation Number

FA252122B0010

Archive Date

Aug 24, 2022

Office Address