Buckley SFB Rectifier Inverter System Replacement
Archived on April 17, 2026. Original response deadline: . Full description on SAM.gov.
Description
The purpose of this Sources Sought is for market research purposes only to obtain a list of capable vendors and possible industry feedback. Please see attached Statement of Need for all requirements. Please include BOTH 2d Lt Maurice Epps email: maurice.epps@spaceforce.mil or TSgt Matthew Kennedy email: matthew.kennedy.24@us.af.mil on all communications. Please see below questions and include answers to them with your response to this Sources Sought.
COMPANY INFORMATION:
What is your company's name, address, CAGE code, and Unique Entity ID (UEI)?
Who is the best person to contact for follow-up questions? Please provide their name, title, email, and phone number.
What is your company's business size (e.g., small business, large business)? Do you fall under any socioeconomic categories (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business)?
STATEMENT OF NEED/REQUIREMENTS:
Are there any specifications, terms, or requirements that are unclear, ambiguous, or could be misinterpreted? If so, please specify the section and your question.
Based on your experience with similar projects, are there any critical components, processes, or requirements missing from the SON that are essential for a successful and fully functional system replacement?
Do you have any recommendations for improving this Statement of Need to allow for a more accurate and competitive response?
TECHNICAL CAPABILITY:
Does your company possess the necessary technical expertise, equipment, and resources to perform the full replacement of the rectifier/inverter system, including battery strings, battery disconnects, and A/C power circuits, as described in the Statement of Need? Please briefly describe your core competencies relevant to this project.
Briefly describe your general approach to designing and integrating a power rectification and distribution system that meets or exceeds the specified amp load (2,800 amps) and accommodates existing DC breaker panels and A/C circuits.
Describe your general methodology for installing such a complex system, particularly regarding minimizing disruption to critical operations and ensuring seamless integration with existing infrastructure.
PAST PERFORMANCE/EXPERIENCE:
Do you have any examples of similar projects completed within the past 5 years?
Have you performed similar work for the Department of Defense or other federal agencies? If so, please describe your experience.
DELIVERY/INSTALLATION:
What is the estimated lead time for equipment delivery after contract award?
Provide an estimated timeline for the installation process, from site arrival to system commissioning.
PRICE ESTIMATE:
Please provide a Rough Order of Magnitude (ROM) price for the complete solution, including equipment and installation.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 2 of 2 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | DEPT OF THE AIR FORCE | Mar 25, 2026 | 71.5 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Mar 25, 2026 | 17.45 KB |
Lifecycle
FA2543Rectifier- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 2×Market ResearchCurrentMar 20, 2026
Buckley SFB Rectifier Inverter System Replacement
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
12/22/25... Post SSS for 30 days. F-16 Power Supply NSN 6130-01-373-0561WF 5 yr IDIQ. See attached notice for more details. | Market Research | 335999 | No Set-Aside | 01/21/2026 | 01/20/2026 | - | |
12/22/25... Post SSS for 30 days. F-16 Power Supply NSN 6130-01-373-0561WF 5 yr IDIQ. See attached notice for more details. | Market Research | 335999 | No Set-Aside | 12/22/2025 | 01/20/2026 | - | |
Notice to Quoters/SuppliersFunds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government���s obligation under any resulting contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a quoter for any costs incurred in preparing or submitting a quote.This requirement is for Medium Voltage Switchgear for Seymour Johnson AFB, in accordance with Attachment 1, Salient Characteristics. | Solicitation | 335999 | No Set-Aside | 08/14/2026 | 08/24/2026 | - | |
Proposed procurement for NSN 6130016791577 POWER SUPPLY: Line 0001 Qty 1 UI EA Deliver To: By: 0060 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach 350000.00. The estimated number of orders per year is 1. The Guaranteed Minimum quantity will be 1. Items will be shipped to various CONUS and OCONUS (via consolidation and containerization point) DLA Depots. Approved sources are 0ERB9 8479734; 31795 APS3-421-A0A. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | Combined Synopsis | 335999 | Total Small Business Set-Aside | 10/20/2026 | 11/04/2026 | - | |
Proposed procurement for NSN 5940012287478 TERMINAL JUNCTION BLOC: Line 0001 Qty 31 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0139 DAYS ADO This is a source controlled drawing item. Approved sources are 1Y249 5260; 83311 5260. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | Combined Synopsis | 335999 | Total Small Business Set-Aside | 10/19/2026 | 10/27/2026 | - |
Additional Details
Solicitation Number
FA2543Rectifier
Archive Date
Apr 17, 2026
Office Address
BUCKLEY AFB, CO, 80011-9572