GovChime
Notice ID: cece86eaaf104705bb20f09e538c8810Solicitation

812 AMXS Engine Crane

Archived on December 4, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−06:00
Posted
November 10, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA3010 81 CONS CC
Place of performance
Biloxi, MS, 39532
Last updated
Dec 4, 2025

Identifiers

Solicitation number
FA301022Q0002
Notice ID
cece86eaaf104705bb20f09e538c8810

Description

Ruger Industries HP-3D Engine Crane IAW Attached Technical Orders (1 Each) See Attachments for more information.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:FA301022Q0002
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentNov 10, 2021

    812 AMXS Engine Crane

    Notice cece86eaaf104705bb20f09e538c8810 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Please reference this requirement Notice ID and Project Title in subject line of any email correspondance. Please include Hugo Ruano Gutierrez and Lauren Reigenborn in ALL email correspondance. This requirement includes a site visit on 28 October 2026 and an RSVP is required for attendance. Please RSVP NLT 1500 Mountain Time on 26 October 2026. When RSVPing please provide a scan of official government issued ID such as driver's licesnse or passport and current registration, proof of insurance, or valid rental vehcile agreement as applicable for any vehicle(s) you will be brining on the installation.
80%
Combined Synopsis11/23/2026
Chain and Hoist10A2016 GANTRY A SERIES STEEL ADJUSTABLEHEIGHT include Wheel Brakes and FestooningNER2G080SHarrington 8 Ton NER2 Hoist with Geared Trolley 10 foot HOL and 16 foot Pendant
78%
Combined Synopsis04/22/2026
Gantry Crane
76%
Combined Synopsis05/12/2026
The Contractor shall provide all materials, parts, travel, tools, and labor necessary to provide and install a new hoist carriage assembly to the Maintenance Support Group (MXSG); Warner Robins Air Logistics Complex (WR-ALC) at Robins Air Force Base (AFB), Georgia. This will be a sole source award to OEM, George Koch Sons, LLC (34123). The coming solicitation will utilize procedures at RFO 12.201-1. Anticipated award date will be 28 December 2026.
74%
Pre-Solicitation11/18/2026
Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements.
72%
Combined Synopsis01/05/2026

Additional Details

Solicitation Number

FA301022Q0002

Archive Date

Dec 4, 2021

Office Address

KEESLER AFB, MS, 39534-2701