Notice ID: 6acca63e46984966ba54f5ba68559821Solicitation
Fiber Optic Cable (FOC) IDIQ Requirement
Archived on January 31, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM UTC−05:00
- Posted
- June 6, 2022
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA3010 81 CONS CC
- Place of performance
- Biloxi, 39534
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- FA301022R0016
- Notice ID
- 6acca63e46984966ba54f5ba68559821
Description
Update 6 June 2022: Amendment 1 has been uploaded to include; Attachment 16 - Q&As 31 May 2022; Attachment 17-Keesler Outside Plant Infrastructure Install., Apr 2022; and Attachment 18 - Keesler Guidance for Premise Wiring - October 2021 ********************************************************************************************* Update 24 May 2022: Sign-in sheet from 24 May 2022 site visit has been uploaded. Questions are to be emailed to alice.townsend-peden@us.af.mil and 81CONS.LGCB.Construction@us.af.mil by 12:00 PM, CST, Tuesday, 31 May 2022. ********************************************************************************************* The Magnitude of the proposed construction is between between $1,000,000 and $5,000,000. The Magnitude of the proposed task orders under this IDIQ will be between $2,000 and $500,000. This acquisition is being issued as a 100% total small business set-aside. Enter price in Section B. All amendments to this solicitation (if any) must be acknowledged. An organized site visit has been set for Tuesday, 24 May 2022 at 08:30 a.m. CST. In order to gain access to the base to attend the site visit you must have a valid driver’s license/identification card, valid registration for any vehicle you will be operating, and proof of insurance. Contractors are no longer able to enter the base via the south side entrance of the Contracting Office for site visits. Specific instructions are identified in Attachment 14 - Task Order Proposal Request (TOPR). Keesler AFB Health Protection Conditions (HPCON) change based on available data. Personnel should anticipate mask wear covering the mouth and nose at all times while on Keesler AFB. All individuals are to maintain a minimum of six (6) feet distance from other individuals to the maximum extent practicable at all times. Your attention is directed to Section L for Proposal Preparation and Section M for Evaluation Factors for Award.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
FA301022R0016- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×SolicitationCurrentMay 17, 2022
Fiber Optic Cable (FOC) IDIQ Requirement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Solicitation number 12445127Q0005 is issued as a Request For Quote (RFQ) for Womble Work Center Fiber Optic Installation at Mt. Ida, AR National Forest Service. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210 The small business size standard is $19 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quote which will be considered by the agency. **************************** Amendment 00001 is attached**************************** ***************************Amendment 00002 has been added and a site visit scheduled********************************** ***************************Amendment 00003 is attached************************************* ***************************Amendment 00004 is attached with questions and answers************************************* Submit offer by email to Cynthia.granderson@usda.gov with the notice ID in the subject line so that it is delivered into this inbox by the due date and time. Emails should contain attachments in Microsoft Word, Excel, or Adobe PDF format. Be aware that large attachments may increase the time required to deliver an email. It is the offeror’s responsibility to confirm receipt of the offer from Contract Specialist, Cynthia Granderson. | 57% | Combined Synopsis | 12/01/2026 |
Project Title: B405 Fiber Re-WireProject Location: Kirtland AFB- In accordance with FAR 36.204, the disclosure of the magnitude of construction projects is: Between $250,000 and $500,000.- This solicitation will be awarded in accordance with FAR Part 13, Simplified Acquisition Procedures. Your attention is directed to Section L and M of the solicitation on the evaluation criteria with how the award will be made. Please ensure you review the entire solicitation and attachments.- Refer to FAR provision 52.236-27 Site Visit (Construction) to coordinate site visits and/or obtain base passes.- Contractor shall submit all questions by close of business 13 February 2026. The government will consolidate and post all questions and answers via amendment. Amendment 0001 issued, see update. | 55% | Combined Synopsis | 03/10/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) • Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) • Life-cycle cost and sustainability integration (UFC 1-200-02) • Thermal partition separating switchgear room from power generation bay • Dedicated HVAC system and air conditioning ductwork • Sized space heating units • High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) • Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) • Sustainable design practices (UFC 1-200-02) • Dedicated single HVAC unit and duct system • Interior/exterior high-efficiency LED flood/task lighting • Raised roof profile with comprehensive crack sealing/insulation • Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system • Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables • Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 • Baseline routing derived from 2025 Engineering Study • Mandatory underground routing preference across base footprint • Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry • Air Force long-term smart-grid wireless connectivity architecture • Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines • Relay-to-control panel comm wiring for ESS B18 and ESS B168 • Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | 54% | Market Research | 11/30/2026 |
Provide single line plans. Provide electrical plan to show conduit route. Provide and install (1) Disconnect sized to serve existing lift station load. Provide and install an electrical pathway from the new disconnect to T1775 transformer. Pathway will be surface mounted to building 1730 and then trenched from the edge of the building to T1775.All work will be done in accordance with UFC, IFS, NEC, ICD, local, and state codes. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take on 5/21/2026 at 10AM PDT, meeting in front of building 1730s main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 5/18/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Questions are due by close of business 5/26/2026. Answers will be provided via a solicitation amendment. | 54% | Solicitation | 06/03/2026 |
AFLCMC/PZI intends to award a sole-source purchase order to Northern Electric Inc. to complete partially finished Fiber-to-the-Desk (F2D) cabling, four (4) server rack installations, and printer drops for Building 1614 Phase 2 in support of AFLCMC/HNJ. This is not a Request for Proposal (RFP) or Invitation for Bid (IFB); The Air Force does not intend to award a contract on the basis of this notice or to otherwise pay for the information to be solicited. Although “proposal” and “offeror” are used in this Pre-solicitation, your responses will be treated as information only. It shall not be used as a proposal. Please see NOCA Attachment for further information. | 51% | Special Notice | 11/06/2026 |
Additional Details
Solicitation Number
FA301022R0016
Archive Date
Jan 31, 2023
Office Address
KEESLER AFB, MS, 39534-2701